About this file

This document is an Addendum to the project solicitation for the 472/19019.TYC SAI Various Building Demolitions in Chelsea, Michigan. The addendum includes revised or additional Figures to be included with the bid specifications, such as the Limits of Demolition, Site Plan Utilities, Electrical Service, Line Diagram, and Sanitary Sewer. The related state and local contract opportunity is for the demolition of various buildings under project 472/19019.TYC, with the jurisdictions involved being Washtenaw County and Chesaning Village. The bid submission process requires acknowledgment of all addenda, and electronic submission through the SIGMA VSS system, with a deadline of 2:00 p.m. on the due date. Bidders are instructed to email all questions to the specified contact, and not to submit questions through the VSS system.

The pricing and funding details are not provided in this document. However, it notes that the approved emailed submissions, if necessary, will be handled on a case-by-case basis and must be received prior to the 2:00 p.m. deadline to be considered responsive and responsible.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER 1

PROJECT: 472/19019.TYC SAI Various Building Demolitions Chelsea, MI SIGMA Solicitation: 220000000569

Bid Package

FROM: TriMedia Environmental & Engineering Services ISSUE DATE: September 26, 2022

The Contractor shall acknowledge receipt of all addenda by listing the number were indicated on the Bid Forms.

Drawings, specifications, bid forms, and/or proposals are herein amended, expanded and/or modified, as hereinafter described, and become a part of the Contract Documents with the same effect as if incorporated, therein, on the original documents. Any contrary provisions contained, or referred to, in Drawings and/or Specifications, shall remain applicable unless overridden by this addendum. Revised or contrary provisions herein shall include all labor, materials, methods, modifications, etc., required for the completion of the Work.

CONTRACT DOCUMENT MODIFICATIONS

1) FIGURES to be included with Bid Specification:

Figure 1 – Limits of Demolition

Figure 2 – Site Plan Utilities

Figure 3 – Site Plan Electrical Service

Figure 4 – Site Plan Line Diagram

Figure 5 – Site Plan Sanitary Sewer

END OF ADDENDA 1