This is Addendum 1 to a Request for Qualifications and Proposals issued by Vernon Public Schools for architectural services related to the renovation of Rockville High School's ASTE Program Mechanics Lab. The addendum, dated June 25, 2026, addresses 23 questions submitted by prospective firms and provides clarifications on project scope, schedule, and delivery method. Key clarifications include confirmation that environmental consulting, site survey, and geotechnical consulting services will be retained directly by the owner rather than the awarded architect. The design schedule targets bidding in the fourth quarter of 2026, with construction occurring January through August 2027. The project delivery method will utilize a general contractor hard bid approach using AIA A101 or similar contract documents. Existing drawings from prior 2007 and 2010 renovations will be provided to the awarded architect, and an AHERA report with asbestos testing results will be shared upon selection. The school building has an existing Building Management System that the new system will tie into, and all equipment and system specifications will be determined during schematic design in conjunction with end users, the owner, and the architect.
The addendum confirms that compliance with Connecticut Department of Administrative Services Office of General Counsel standards is not required for this project. Regarding budgets, the addendum indicates that construction, furniture/fixtures/equipment, and technology budgets will be discussed directly with the awarded architect, with proposers permitted to qualify their fee proposals based on assumed budgets, square footage, or schedules. The document confirms that State of Connecticut DAS review and approvals are not required. Environmental hazardous materials testing has already been completed, with the owner potentially conducting a pre-renovation update if necessary. The roof is assumed to be 20 years old and replacement is anticipated within the project scope. No specific student counts or program schedules were disclosed in the addendum, with those details to be confirmed during schematic design discussions with end users and the owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VERNON PUBLIC SCHOOLS
30 Park Street • P.O. Box 600
Vernon, CT 06066-0600 Fax (860) 870-6008
Website: www.vernonpublicschools.org
Date: Thursday, June 25, 2026
From: Vernon Public Schools Business Office cc: William Meier III, Director of Business and Finance
Kaiya Hill, Assistant Director of Business and Finance Scott Kanaitis, Director of Facilities Angela Cahill, Project Executive- STV
Re: Addendum #1- RFP/ RFQ FY26-001 Rockville High School ASTE Program- Mechanics Lab Renovations
No. Question Answer 1 Will environmental consulting services be required and carried by the town?
If required, will be hired by the owner directly.
2 Has hazardous materials testing been completed? Testing has been done. The owner might complete a pre-renovation update, if so, they will hire directly.
3 Is there known asbestos-containing material within ceilings, flooring, pipe insulation, or roofing components?
Ahera report and test results will be shared with the awarded architect.
4 Does the school have an existing BMS that we will tie into for the new system?
Yes.
5 Is there any new equipment requiring a separate system to be added as part of this project, beyond the relocation of existing equipment?
Equipment and systems will be determined during SD in conjunction with the end users, the owner and architect.
6 Is the proposed layout for the space intended to comply with the Connecticut School Construction Standards and Guidelines?
Compliance with DAS OGA is not required.
7 What is the student count for each program occurring in this space? And are all programs taught concurrently?
Student count in the mechanics lab varies by the class being taught. It is not intended to teach more than one class at a time in the mechanics lab.
8 Is there an Ed Spec and can it be provided? An Ed Spec is not required.
9 What is the current equipment used? Can their electrical requirements be provided? Is new equipment to be provided as part of the project?
Equipment and systems will be determined during SD in conjunction with the end users, the owner and architect.
10 How much staging area is required for each program? Staging areas for both student needs and construction will be discussed during SD with the end user, owner and architect.
11 Please confirm the roof assembly and construction date. Is a roof replacement within the scope of this project?
For your response, please assume the roof is 20 years old and replacement is needed.
12 What is the make and model of the owner’s vehicle lift to be installed as part of the project?
Detailed equipment information will be provided to the awarded architect.
13 What is the capacity of the current air compressor? Equipment and systems will be determined during SD in conjunction with the end users, the owner and architect.
14 What is the construction budget? Budget will be discussed with the awarded architect. When submitting your fee proposal, you may choose to qualify it based on an assumed budget, SF, and / or schedule.
15 What is the FF&E budget? Budget will be discussed with the awarded architect. When submitting your response, you may choose to qualify your fee based on an assumed budget, SF, and / or schedule.
16 What is the technology budget? Budget will be discussed with the awarded architect. When submitting your response, you may choose to qualify your fee based on an assumed budget, SF, and / or schedule.
17 Confirm that Hazmat consultant is by owner. Correct.
18 Confirm that Site Survey consultant is by owner. Correct.
19 Confirm that Geotech consultant is by owner. Correct.
20 Confirm design schedule and duration. The goal is to bid in the 4th Q of 2026, with construction Jan - August
2027. When submitting your response, you may choose to describe that schedule or an alternate schedule.
21 Confirm construction schedule and duration. The goal is to bid in the 4th Q of 2026, with construction Jan - August 2027. When submitting your response, you may choose to describe that schedule or an alternate schedule.
22 Confirm State of CT DAS review and approvals not required. Correct, not required.
23 Confirm GC delivery method. GC hard bid using AIA A101 or similar.
24 Are existing drawings available? If so, please provide. Existing drawings from renovations in 2007 and 2010, along with any other existing conditions materials available, will be provided to the awarded architect.