This is Addendum 1 and Pre-Bid Meeting Minutes for the Kent Intermediate School District Pine Grove Learning Center Boiler Replacement project in Michigan, managed by Owen-Ames-Kimball Co. (O-A-K) as the construction manager. The project involves replacement of the boiler system at Pine Grove Learning Center, a school serving students with unique developmental, emotional, and sensory needs. Bids were due on Thursday, June 4, 2026, at 2:00 PM local time at the O-A-K Operations Center, with public bid opening and virtual attendance available via Zoom. A mandatory pre-bid meeting was held on May 20, 2026, at 7:00 AM, followed immediately by a site visit. The project is divided into two bidding categories: BC 1 - Mechanical/Plumbing and BC 2 - Electrical. Requests for Information (RFIs) were to be submitted by May 28, 2026, at noon, with responses provided in Addendum 001. Project completion is targeted for October 2026. No substitution requests were accepted prior to bid.
The project does not require prevailing wage compliance. Bid security in the form of bid bonds or certified checks was mandatory for bid consideration. All bids must follow the plans, specifications, and construction management booklet; any variances must be submitted as voluntary alternates with the base bid matching the original documents. Monthly invoices are due to O-A-K by the 20th of each month on AIA forms G702 & G703, with 10% retainage applied until contracts reach 50% completion, after which remaining invoices may be paid in full if requested in writing and approved by the project team. Contractors must provide insurance certificates naming the Owner, Architect, and C.M. as additional insured on a per-project basis, with 30 days cancellation notice required and certificates due 10 days after Notice of Pending Award. Performance and payment bonds and certificates of insurance must be on file prior to receiving progress payments. The project includes a mandatory alternate for water heater replacement and related domestic water and gas piping plus associated electrical work. Construction access must use designated roads only, and all work must maintain strict noise and interaction protocols to minimize disruption to the school's student population.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED SET.pdf | ||
| PLC Boiler Replacement CD set.pdf | ||
| 03._-_Advertisement_to_Bid_Notice - Revised.pdf | ||
| CM Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kent Intermediate School District – Pine Grove Learning Center Boiler Replacement www.owen-ames-kimball.com
ADDENDUM NO. 1
KENT INTERMEDIATE SCHOOL DISTRICT
PINE GROVE LEARNING CENTER BOILER REPLACMENT
June 1, 2026
The following items are changes, clarifications, corrections of errors, etc., with respect to the Contract Documents previously issued. This addendum shall be a part of the Contract Documents.
Items listed below may or may not affect the cost of the Contractor's Proposal. Changes in cost shall be incorporated in the Contractor's Proposal.
ITEM No.1: PRE-BID MEETING - ATTACHED
ITEM No.4: PRE-BID RFI – None published. There were some substitution requests. None were accepted.
End of Addendum 1
Kent Intermediate School District, Pine Grove Learning Center Boiler Replacement
Kent Intermediate School District
Pine Grove Learning Center Boiler Replacement
Pre-Bid Meeting Minutes
May 20, 2026, 7:00 AM
1. Introductions
Aaron Stockeland - KISD
Russell Bray - KISD
Jorge Benitez - GMB
Jeff Twiest - GMB
Mark Arroyo - Owen-Ames-Kimball Co.
PJ Riordan - Owen-Ames-Kimball Co.
Dan Rathburn - Owen-Ames-Kimball Co.
2. Safety
a. All roads and entrances must remain open.
b. Contractors must follow proper safety procedures. Contractor safety manuals/books must be on-site.
c. Contractors must provide their own first aid and fire protection equipment.
d. Contractors are responsible for providing the necessary barricades for their work.
e. Contractors must comply with the "Right to Know" law.
f. Contractors are responsible for their own security.
g. Contractors must comply with O-A-K's substance abuse policy.
h. No Smoking on School Property.
i. No pictures are to be taken during school hours.
j. Contractors to stay out of occupied areas.
k. No radios, boom boxes, I-pods, etc…. will be allowed on the construction site.
3. Supporting Pine Grove Students
a. The school serves students with unique developmental, emotional, and sensory needs. For many of the students, changes in their environment, unexpected noises, or unfamiliar faces can cause severe distress, anxiety, or behavioral challenges.
b. To ensure a safe, productive, and respectful environment for everyone during this construction project, all personnel are required to strictly adhere to the following guidelines regarding noise, contact, and student needs.
i. Managing Noise and Sensory Disruptions
1. Schedule Major Disruptions: Any high-impact noise (e.g., drilling into concrete, heavy demolition, loud hammering) must be scheduled in advance with school administration so staff can transition students to safer areas of the building.
2. No Sudden Loud Noises: Avoid shouting, dropping heavy materials unexpectedly, or sounding loud vehicle horns unless it is an immediate safety emergency.
3. Keep Barriers Closed: Ensure all dust and acoustic barriers remain fully closed and secured to minimize both noise bleed and visual distractions.
ii. Interaction and Contact Boundaries
1. Zero Contact Policy: There is to be absolutely no physical contact or verbal interaction with students. Even a well-intentioned "hello" or wave can confuse or disrupt a student's routine.
2. Maintain Distance: If students are moving through hallways or outdoor areas near the construction zone, please step back, halt work temporarily if necessary, and allow them to pass with their educators.
3. Report Concerns Immediately: If a student approaches the construction zone or appears to be unescorted, do not engage them directly. Immediately notify the nearest Pine Grove staff member or school administrator.
iii. Understanding and Respecting Student Needs - Routine and predictability are vital for the student population. The construction project itself is already a major disruption to their daily lives.
1. Do not enter any operational school zones, classrooms, or restrooms unless accompanied by a school escort or explicitly authorized for specific utility work.
2. Secure Tools and Materials: Never leave tools, ladders, wires, or construction debris unattended, even for a moment. Our students may not recognize the inherent danger of these items.
3. Maintain a quiet, professional demeanor. Keep personal music radios at a volume that cannot be heard outside your immediate work area, and refrain from using profanity.
4. Site Constraints
a. The upside of this project is it is isolated and easily accessible without contact with the students.
b. Maintaining a clean site is mandatory.
c. Construction traffic to use designated access roads only.
d. Construction trailers and staging will be coordinated with Mark.
5. Temporary Services
a. Temporary toilet facilities will be supplied by the Owner.
b. Existing electrical services will be available for use. Contractors are to provide their own GFI protection.
c. Existing water services will also be available for use.
6. Schedules / Key Topics:
a. Start as early as possible. Compilation October.
b. Removal of existing equipment needs to wait until we have confidence in the delivery of new equipment.
7. Testing, Permits, Inspections - All necessary permits and inspections are the responsibility of each contractor.
8. Layout - Each contractor is responsible for their own layout, the C.M. will assist.
9. Monthly Invoices
a. Monthly invoices must be submitted to O-A-K by the 20th of each month. Contractors must invoice on
AIA forms G702 & G703.
b. There will be a 10% retainage on invoices. After contracts are 50% or more completed, remaining invoices will be paid in full if so, requested in writing and approved by the project team.
c. If contractors’ invoice for stored material not stored on-site, the invoice must be accompanied with an insurance certificate for that material.
d. Performance and payment bonds, as well as certificates of insurance, must be on file prior to receiving progress payments.
10. Insurance
a. Contractors must provide insurance certificates as per specifications. Insurance certificates must indicate the Owner, Architect, and C.M. as additional insured on a per project basis.
b. Contractors must provide a 30 days notice of cancellation.
c. Insurance must be on file 10 days after receipt of Notice of Pending Award.
11. Shop Drawings and Submittals:
a. All correspondence must be addressed to: Kayla Cribley, Owen-Ames-Kimball Co., 126 Ottawa Ave NW
Suite 600, Grand Rapids, MI 49503 - E-mail: kaylac@oakmi.com.
b. Contractors are required to send and receive submittals and shop drawings electronically. All Submittals will be returned electronically.
c. Successful bidders maybe asked in the "Notice of Pending Award" to submit manpower and shop drawing schedule.
12. Document Questions
a. All questions regarding the bid documents, schedule, or procedure must be addressed to danr@oakmi.com.
b. Requests for Information must be submitted by May 28, 2026, Noon.
c. RFI’s will be answered in Addendum 001.
13. Bid Forms
a. Contractors are reminded to fill in all required items on the bid forms.
b. Alternate P-1: Water heater replacement and related domestic water and gas piping, plus associated electrical work.
c. Mandatory alternates must be filled in. Blanks will be treated as zeros.
d. Voluntary Alternates are encouraged - list accordingly on the bid form.
e. Familial Disclosure Statement must be signed and notarized.
f. This is NOT a prevailing wage job.
14. Addenda
a. Addendum 001 will be issued a few days after this meeting.
b. Other Addendum will be issued as needed.
15. Bid Details
a. Bids will be received at the Owen-Ames-Kimball Co. Operations Center until Thursday, June 4, 2026, 2:00pm local time. All bids received after 2:00 PM will not be accepted.
b. Bids may be mailed to Owen-Ames-Kimball Co. operations center by 2:00pm.
c. FAXED, EMAILED OR UPLOADED TO BUILDING CONNECTED BIDS WILL NOT BE ACCEPTED
d. Bids must have a bid security (Bid Bonds / Certified Checks) to be read.
e. At 2:00pm on Thursday, June 4, 2026 bids will be publicly read. You may attend in person. As a courtesy we will hold a virtual option at this link:
https://us06web.zoom.us/j/83418259515?pwd=2duY7WMfcgSeAsyz1XWdyryBMPcea0.1
16. General Notes
a. Each bidder must submit their bid per the plans, specifications, and construction management booklet.
If your bid varies from these documents, you must submit the variance as a voluntary alternate with your base bid matching the bid documents.
b. Each contractor must supply sufficient manpower.
c. The schedule does not change if alternates are accepted.
17. Site Visit - Will immediately follow today’s pre-bid.
18. Comments and Questions
19. Attendance / Sign-In
Thank you for attending. Good luck with your bid!
Imagery ©2026 Google, Imagery ©2026 Airbus, Maxar Technologies, Map data ©2026 100 ft
5/19/26, 6:52 AM Google Maps https://www.google.com/maps/@42.8710835,-85.7153294,281m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI2MDUxMy4wIKXMDSoASAFQAw%3D%3D 1/1 drathbur Rectangle drathbur Text Box Area of Work
KISD - Pine Grove Learning Center - Boiler Replacement Sign-In Sheet
Timestamp Company Name E-mail Phone number Bidding Category
5/20/2026 6:48:46 B&V Mech Tim Schultz tschultz@bvmechanical.com 616-250-2572 BC 1 - Mechanical/Plumbing
5/20/2026 6:50:06 Pleune Service Gene Magoon gmagoon@pleuneservice.com 616-260-9489 BC 1 - Mechanical/Plumbing
5/20/2026 6:50:55 Vander Hyde Mechanical Matt Rosendale MATTR@VANDERHYDE.COM 616131219360 BC 1 - Mechanical/Plumbing
5/20/2026 6:54:37 Hurst mechanical Zach haan Zhaan@hurstind.com BC 1 - Mechanical/Plumbing
5/20/2026 6:56:18 A&B Mechanical Contractors Jonathan@abmechanical.us 616-866-2566 BC 1 - Mechanical/Plumbing
5/20/2026 7:01:45 Grand Valley Automation Imc. Andy Molitor amolitor@GVAINC.COM 231-349-8115 BC 1 - Mechanical/Plumbing
5/20/2026 6:48:29 Windemuller Craig knox Cknox@windemuller.us 231-342-5069 BC 2 - Electrical
5/20/2026 6:48:55 Bazen Electric Joel Visser Jvisser@bazenelectric.com 616-458-7210 BC 2 - Electrical
5/19/2026 8:52:04 Owen-Ames-Kimball Co. Dan Rathburn Danr@oakmi.com 616-262-6596 Owner / Design Team / Construction Manger
5/20/2026 7:01:44 Gmb Jeff Twiest Jefft@gmb.com 616-502-6834 Owner / Design Team / Construction Manger
Jonathan Javier Fernand
| Pre-Bid Agenda |
| Pine Grove Map |
| Kent Intermediate School District - Pine Grove Learning Center Boiler Replacement - Pre-Bid Meeting - Sign-In (Responses) - Google Sheets |
File details come from the government source that posted it. Updated .