Nokia Network Services Platform
Solicitation number
ITB-06854
Issued by
Seminole County, Florida

About this file

This document is an Addendum for an Invitation to Bid (ITB) issued by the Florida Department of Transportation (FDOT) for the upgrade of their Nokia Network Services Platform (NSP) servers. The addendum revises the timeline, scope of services, and provides additional questions and answers.

The scope of work involves furnishing and installing new server hardware and operating system software to replace the existing end-of-life servers at two FDOT sites - the Wilson Road tower site in Sanford, FL and the McArthur Interchange tower site in Plantation, FL. The new servers will run NSP release 23.4 and include additional software modules and license points. The Contractor will be responsible for migrating the existing databases, configuring the new servers, and implementing a workaround for backing up certain network elements. The revised timeline provides updated due dates, with bids due on November 16, 2023 and the public opening on November 20, 2023. The contract will be awarded to the successful bidder, with no mention of any renewal options.

View the file

Other files

File Type Posted
Addendum 2.pdf PDF
9034 Questions and Answers Part 2.pdf PDF
Solicitation Document 9034.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA DEPARTMENT OF TRANSPORTATION

Procurement Office

605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450

Phone: (850) 414-4477

ADDENDUM NO. 1 DATE: November 8, 2023

BID No.: DOT-ITB-24-9034-SD

BID Title: Nokia Network Services Platform Upgrade

OPENING DATE: Monday, November 20, 2023, @ 11:00 AM EST

Notice is hereby given of the following changes to the above-referenced SOLICITATION:

• Revised Timeline Attached Below

• Part I – Questions and Answers attached below (additional questions received after the original date for questions and answers through November 13, 2023, will be advertised within VIP via a Part II – Questions and Answers document.

• Revised Scope of Services attached below. The original Scope of Services located within the solicitation should be deleted and replaced with the attached

Revised Scope of Services

Bidders/Proposers must acknowledge receipt of this Questions and Answers Document by completing and returning to the Procurement Office, by no later than the time and date of the bid/proposal opening. Failure to do so may subject the bidder/proposer to disqualification.

Sally Dobson, Procurement Agent

Bidder/Proposer

Address

Submitted by (Signature)

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

605 Suwannee Street, MS 20

REVISED TIMELINE

ACTION / LOCATION DATE LOCAL TIME

DEADLINE FOR TECHNICAL QUESTIONS - 11-01-2023 05:00 PM

There is no deadline for administrative questions. 11-13-2023

BIDS DUE (ON OR BEFORE) - 11-16-2023 09:00 AM

Florida Department of Transportation 11-20-2023 Central Procurement Office Sally Dobson, Procurement Agent Phone: (850) 414-4477 CO.Purch@dot.state.fl.us

PUBLIC OPENING - 11-16-2023 11:00 AM

Florida Department of Transportation 11-20-2023 Central Procurement Office Attn: Sally Dobson, Procurement Agent- 605 Suwannee Street Tallahassee, FL 32399-0450

POSTING OF INTENDED DECISION/AWARD - 11-21-2023

11-27-2023

605 Suwannee Street, MS 20

QUESTIONS AND ANSWERS

Question 1 Are there any special access restrictions such as time or escort requirements for the Wilson Road or

McArthur sites?

Answer 1 Access is available Monday through Friday, 8 a.m. - 5 p.m., local time. Escort is not required if contractor has personnel that successfully passed the SLERS background check, otherwise, FDOT escort will be provided as reasonably required.

Question 2 Have rack locations/space been identified for the new servers and rectifiers?

Answer 2 Rack elevation drawings are provided in the drawing package. Please refer to Addendum #1.

Question 3 We see the McArthur site locations is changing. Is the Wilson Road location unchanged?

Answer 3 There are changes to the floor plan and rack layouts at both McArthur and Wilson Road locations. These are reflected in the drawing package. Please refer to Addendum #1.

Question 4 Will the new servers have new IP addresses available in order to facilitate migration?

Answer 4 Two servers will need new IP address and will be provided by the FDOT. Two servers will re-use the existing server's IP addresses. The information will be provided to the awarded contractor.

Question 5 Will FDOT be configuring the necessary IP environment or is this a contractor requirement?

Answer 5 The IP environment will be ready to support the installation of the new equipment. FDOT will perform any required configuration changes with the assistance of NOKIA support.

Question 6 Will remote access be available to servers to allow remote configuration and test?

Answer 6 The FDOT can provide SSL secure remote access to contractor personnel that complete the necessary background check and training.

Question 7

Are the HP servers AC powered, hence the inverters? Do you intend the Dell severs to be DC powered or powered by inverters?

Answer 7

NOKIA has informed the FDOT that they currently do not support NSP servers with DC power supplies. Therefore, the NOKIA-supported HP AC-powered servers are required to utilize inverters. The work-around SFTP server based on a Dell rack-mount workstation is also AC powered and will require an inverter. Please refer to Addendum #1.

Question 8

Can you elaborate on 6.11? Are there any expectations of additional software or application requirements?

Answer 8 It is the responsibility of the contractor to provide a complete and functioning installation.

Section 6.11 is included to cover any unknowns that may be required for full functionality of the NSP applications.

Question 9

Are there specific software applications that have been tested to meet the requirements of 6.12.2 or is it anticipated that the contractor will identify or develop these services?

Answer 9

This section describes a known NSP limitation with respect to SFTP and the NOKIA-provided workaround to be implemented. If more specific information is required, we recommend contacting NOKIA support. It is not expected that the contractor will require to develop these services as off the shelf SFTP components can be used.

EXHIBIT A

INVITATION TO BID

SCOPE OF SERVICES

FOR

NOKIA SERVICES PLATFORM (NSP)

NETWORK MANAGEMENT SERVERS UPGRADE

\\DOTSCOTEO01.DOT.STATE.FL.US\TRAFFIC_OPS_DATA\8. TSMO\TELCOM\FION\NOKIA MAINTENANCE SUPPORT\NSP SERVERS UPGRADE\NOKIA NSP SERVER

UPGRADES - 20230629 - FINAL.DOCX

Addendum 1

November 8, 2023

Exihibit A - Scope of Services Rev. 11.08.2023

DOT-ITB-24-9034-SD

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

Addendum 1

1. OVERVIEW

2. ACRONYMS

3. TERMS

4. SITES OF WORK

4.1 Site 1

4.2 Site 2

5. SCOPE OF WORK AND SERVICES

5.1 Responsibilities of the Contractor

5.1.1 EMPLOYEE BACKGROUND INVESTIGATION AND I.D. BADGES

5.2 Notice to Proceed

5.3 Migration Plan Submittal

5.4 Relocation of Standby Server to McArthur Central Office

5.4.1 Reconfiguration of 7705 SAR-18 Routers

6. SERVER HARDWARE, SOFTWARE AND ANCILLARY EQUIPMENT

6.1 Servers

6.1.1 Network Interfaces and IP Addressing

6.1.2 Out of Band Hardware Management Interface

6.2 Operating System Software

6.3 NSP Software and Feature Packages and Parameters (as sized by NOKIA)

6.4 Databases

6.5 Model Driven Mediation

6.6 NFM-P License Points

6.7 New NSP Management Modules to be Installed

6.7.1 Service Assurance Feature Package (FP)

6.7.2 Virtual Control Plane Assurance Analyzer (vCPAA) Module

6.8 Secure Shell Protocol (SSH)

6.9 Workaround to Support Backup of MPRe 9500 SA Radios

6.10 Login Credentials

6.11 Other Required Application Software

6.12 Required Ancillary Equipment

6.12.1 -48V DC to 115V AC Inverters and Rack Mount Trays

6.12.2 SFTP Proxy Server

7. POST-INSTALLATION INSPECTION AND VERIFICATION

7.1 General

8. ACCEPTANCE

9. MAINTENANCE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

1. OVERVIEW

This document provides the technical specifications and requirements to upgrade server hardware at the Florida Department of Transportation’s (FDOT) two sites running Nokia

Services Platform (NSP) release 20.6 Service Pack 6 to new server hardware running

NSP release 23.4.

FDOT requires the server hardware and operating system and application software be upgraded at two sites: the Wilson Road tower site in Sanford, FL, and the McArthur

Interchange tower site in Plantation, FL.

This scope of services describes the work required to upgrade these systems.

2. ACRONYMS

FDOT Florida Department of Transportation

ITS Intelligent Transportation Systems

NFM-P Nokia Functions Manager – Packet

NSP Nokia Services Platform

OAMP Operations, Administration, Management and Provisioning

OOB Out of Band

RAID Redundant Array of Inexpensive Disks

3. TERMS

Department: Florida Department of Transportation

Traffic Engineering and Operations Office; ITS Section

605 Suwannee Street, MS 90

Tallahassee, Florida 32399-0450

Contractor: Nokia of America Corp.

3100 Olympus Blvd, Suite 100

Dallas, TX 75019

Ph: 1-770-289-8571

Contact: Randy Williams

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

FDOT Project Manager: Kenneth Shiver

FDOT Traffic Systems Management and Operations

ITS Section

605 Suwannee Street, MS 90

Tallahassee, Florida 32399-0450

V: (850) 410-5608, F: (850) 410-5501

Kenneth.Shiver@dot.state.fl.us

Project Consultant: David Heupel, Sr. ITS Analyst IV

FDOT Traffic Systems Management and Operations

605 Suwannee Street, MS 90

Tallahassee, Florida 32399-0450

V: (850) 410-5618 david.heupel@dot.state.fl.us

4. SITES OF WORK

4.1 Site 1

Wilson Road Tower Site

4975 Wilson Rd

Sanford, FL 32771

Figure 1: District 5 RTMC and Wilson Road Tower Site

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

4.2 Site 2

McArthur Interchange Tower Site

Central Office RF Shelter

5100 W Sunrise Blvd

Plantation, FL 33313

Figure 2: McArthur Interchange Tower Site

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

Figure 3: McArthur Interchange Compound (Central Office RF Shelter highlighted pink).

5. SCOPE OF WORK AND SERVICES

The Contractor shall furnish and install the new equipment including hardware, RAID configuration, operating system and all applicable software installations, and number of needed physical network interfaces on both servers for replacement of the existing server hardware.

To preserve historical network alarms and performance information, the Contractor shall migrate the databases from the existing primary NSP server to the new servers.

The services performed by the Contractor shall result in the replacement of the outdated hardware and software with new equipment and operating systems/software to maintain complete and/or provide enhanced functionality of the system as it exists today.

The Contractor shall remove and dispose of the replaced servers at both sites following installation and acceptance of the new servers. Once the old servers are removed from

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1 service following turn-up of the new server hardware, the Contractor shall wipe the old servers’ hard drives according to the U.S. Department of Defense 5220.22-M data erasure standard and return the hard drives to the FDOT for final destruction.

5.1 Responsibilities of the Contractor

The Contractor shall furnish and install for the FDOT, server hardware suitable for running

Nokia Services Platform (NSP) Release 23.4 in a virtualized environment.

The Contractor shall provide a turnkey installation of all software, licenses, new management software modules and license “points” as specified below, labor for installation of software and hardware, turn-up, and full commissioning of the new NSP servers and software.

The Contractor shall be responsible for any additional work and/or components required for a complete and functional installation.

The Contractor shall install all hardware in accordance with good engineering practices, including adhering to any FDOT-provided installation drawings, plans, cabling diagrams, labeling, electrical wiring, and grounding information.

5.1.1 Employee Background Investigation And I.D. Badges

Maintenance to secure facilities is part of this contract. Therefore, the Contractor’s and any sub-contractor’s personnel will be required to provide employees and agents that can, as a minimum requirement, be authorized security clearance by the Florida Department of Law Enforcement (FDLE) to enter secure Law Enforcement sites such as the Florida

Highway Patrol (FHP) facilities and sites where Law Enforcement systems are collocated with the Department’s FION infrastructure or the FION fixed site equipment.

Background checks will be conducted by law enforcement for all employees and agents of the Contractor and any sub-contractor that performs or supervises work under this contract. Any new employee will be denied access to these facilities unless and until a background investigation has been completed for this individual or they are accompanied by someone who possesses such clearance. The Contractor will be responsible for publishing and providing photo I.D. badges to all employees given security clearance by the Department. Contractor employees not wearing current photo I.D. badges shall be denied access to secure sites.

All I.D. badges must include, as a minimum, the full name of the employee, employer, employer address and phone number, FDOT Contract number, signature, and expiration date. The expiration date on the badge must be the expiration date of this Contract. Only personnel that have been background checked and approved by the Department Project

Manager in writing can be issued this identification badge. New badges must be issued in the event the Department extends the Contractor’s contract beyond the end date.

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

The Department reserves the right to prevent or limit site access to any person that has either not submitted to a background investigation or that the background investigation has revealed that there is a security risk with that person. The Contractor can submit, in writing to the Department Project Manager, a request to allow a Contractor’s employee who does not have security clearance to enter a secure site provided this employee is accompanied by another employee that does have security clearance with the understanding that the Contractor will be responsible for each of the Contractor’s employees and the security cleared employee will be revoked clearance if the Department finds that the cleared employee is allowing non-cleared personnel to enter secure sites without the written approval of the Department Project Manager.

The link below outlines the requirements for obtaining the necessary clearance.

https://www.dms.myflorida.com/content/download/108048/608496/SOP_8.pdf

Contractor’s personnel can initiate the screening process by sending an email to the

Project Consultant who will direct the Contractor’s personnel to individuals who can assist with the background screening and CJIS security training processes.

5.2 Notice to Proceed

The Contractor shall not perform any work until a Notice to Proceed (NTP) is received from the FDOT Project Manager or their designee.

5.3 Migration Plan Submittal

The Contractor shall submit to the FDOT, a Migration Plan detailing the processes and procedures that will be performed to install the software, migrate existing data and install/migrate the systems to the new server hardware.

The Contractor shall not perform any work until the Migration Plan is approved in writing by the FDOT.

5.4 Relocation of Standby Server to McArthur Central Office

The existing standby server is located at the McArthur Interchange (Turnpike) shelter. As part of this scope, the Contractor shall install the new standby server at the McArthur

Central Office shelter and shall interface it to the existing 7705 SAR-18 router. Both shelters are located in the same compound.

5.4.1 Reconfiguration of 7705 SAR-18 Routers

Due to the relocation of the NSP server, and the addition of a proxy SFTP/SSH server, the 7705 SAR-18 router at each shelter (McArthur Interchange and McArthur Central

Office) will require delta configuration.

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

The Contractor shall be responsible for performing delta configuration of the 7705 SAR-

18 routers at these and any other FDOT network locations, as required, to fully support the relocation of the standby NSP server and the addition of the proxy SFTP/SSH server.

6. SERVER HARDWARE, SOFTWARE AND ANCILLARY EQUIPMENT

This section describes the equipment to be upgraded.

6.1 Servers

There are a total of two existing NSP servers, one at each of the aforementioned sites.

The existing NSP servers are end of life and end of support. The new replacement servers shall be installed to support a virtualized NSP environment for network management.

The Contractor shall furnish and install:

� NOKIA Part number 3HE17440BA, NSP Server with RHEL 8.6, Qty 4.

� NOKIA Part number 3HE16004AA, NSP Service Activation + Configuration Feature

Package with 3,278 license points (at a minimum).

� NOKIA Part number 3HE16005AA, NSP Service Assurance Feature Package with

3,278 license points (at a minimum).

� NOKIA Part number 3HE10161AA, NSP Software Release Subscription for 3 years

(to end no earlier than 9/16/2026).

� HP Hardware Support through NOKIA for 5 years.

Each location shall receive two new servers to replace the existing single units.

6.1.1 Network Interfaces and IP Addressing

Unless otherwise not supported, the new servers’ network interfaces shall be configured in the same manner and addressing scheme as the existing servers to maintain communications with network elements and management systems as well as to avoid disruption for end users accessing the platforms.

Network patch cables shall be labeled before removal of the existing hardware to ensure they are plugged into the proper ports on the new servers when installed.

All relevant IP addressing, router configurations and other similar sensitive information will be provided to the Contractor awarded this project following the award announcement of the successful bidder. The awarded Contractor shall coordinate exchange of this

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1 information with the FDOT, including any additional information required to complete the work.

NOTE: If additional IP addresses are required to support the implementation of the new NSP servers (e.g., addresses needed for VM instances, server heartbeat messaging, etc.), the Contractor shall coordinate with the FDOT for these address requirements and assignments.

6.1.2 Out of Band Hardware Management Interface

The servers shall be equipped with an out of band (OOB) management interface.

The Contractor shall configure the OOB interface to communicate with NSP and/or the

Telenium network management systems to alert on hardware condition and health metrics.

6.2 Operating System Software

The servers shall be licensed for the RedHat Enterprise Linux (RHEL) operating system release 8.6 (current release) and Kernel-based virtual machine hypervisor.

6.3 NSP Software and Feature Packages and Parameters (as sized by NOKIA)

The following information and configuration parameters were previously vetted and supplied by NOKIA as an NSP hardware platform that will replace FDOT’s existing servers. The Contractor shall conform to the list below when furnishing and configuring the new NSP servers.

NSP Release 23.4

Customer Name Florida Department of Transportation

Customer Network Name FDOT NSP-MD R23.4

Customer Network Region NAR

Customer Network Location Florida

What platform will NFM-P be deployed on?

nspServer

Deployment Size Production - Medium

Environment Type NSP Server

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

NFM-P Redundancy Type Geographic Redundancy

Auxiliary Database Redundancy Model (If Applicable)

Default (Matches NFM-P Redundancy)

Is NFM-T/WS-NOC integration needed? Yes

NFM-P Release 23.4

NFM-P Network Size Medium

Custom NFM-P Network Elements No

Bill Of Materials Yes

BoM Type Brownfield

RHEL QCOW2s needed? No

Additional QCOW2s needed. 0

License Points 0

Wireless License Points 0

Existing License Points 3278

Existing Wireless License Points 0

HA LPs in the Existing Network? Yes

Existing Software Suite NFM-P Standard

Extended NE Software Support 0

Licensed AA Residential Subscribers 0

Licensed AA Mobile Subscribers 0

Licensed AA Business Subscribers 0

Resource Control Class 1 Nodes 0

Resource Control Class 2 Nodes 0

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

Resource Control Class 3 Nodes 0

Resource Control Class 4 Nodes 0

CDRC 10G Links 0

400ZR Links 0

Baseline Analytics Size none

NSP Indicators Size Small

Additional active MDM instances 0

NSP Platform Yes

Classic Mediation Yes

Model Driven Mediation Yes

Standard Routers Yes

MDM Telemetry Yes

T-BTS NEs No

Network Infrastructure Management Yes

Service Activation and Configuration Yes

Service Assurance Yes

Network Operations Analytics No

Transport Slice Operations No

3GPP Packet Core Management No

Force Include Intent Manager No

Force Include Work Flow Manager No

Original Service Fulfillment No

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

Intent Based Service Fulfillment Yes

Basic Management Network Infrastructure Management

Yes

Device Configuration Network Infrastructure Management

Yes

IGP Topology Network Infrastructure Management

Yes gRPC Telemetry Yes gNMI ON_CHANGE Yes

Simplified RAN Transport No

Telemetry No

Control and Visualization Starter No

Path Control and Optimization No

Enhanced Optimization No

NSP Flow Collector No

Simulation No

Multi-layer Discovery and Visualization No

Optical NEs managed by Optical Controllers

No

Optical NEs managed by MDM Adaptors No

Multi-layer Control Coordination No

IP and Physical Link Failure Simulation No

NSP Baseline Analytics No

Performance Indicators and Alerts Network Infrastructure Management

Yes

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

NSP Software Development Kit No

Intent Based Networking Framework No

Workflow Automation Engine No

Horizontal Scalability of Classic Mediation

No

NSP High Availability No

NSP Disaster Recovery Yes

Logging and Monitoring Yes

Number of vCPAAs 2

NSP Flow Collector No

AA Cflowd Records No

System Cflowd (IPFix) Records No

CGNat Cflowd Records No

NSP Analytics No

Application Assurance configuration None

Network and Service configuration None

6.4 Databases

In the interest of saving historical alarm and performance data, the Contractor shall preserve and migrate the databases on the existing servers to the new servers.

6.5 Model Driven Mediation

The Contractor shall set up and configure the new NSP servers to support the new Model

Driven Mediation architecture to enhance functionality and prepare the servers for future releases of NSP software.

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

6.6 NFM-P License Points

As required, the Contractor shall be responsible for furnishing additional license points to cover the additional new NSP management modules as described below.

The existing servers are licensed for 3,278 license points, of which 253 license points are unconsumed and reserved for future use. The Contractor shall ensure that at a minimum, 3,278 license points are provided with the new servers, and no less than 253 license points remain available for future use.

6.7 New NSP Management Modules to be Installed

6.7.1 Service Assurance Feature Package (FP)

The Contractor shall add the Service Assurance FP and adequate license points to the new NSP VM platforms to provide the features and management capabilities afforded by this NSP module.

6.7.2 Virtual Control Plane Assurance Analyzer (vCPAA) Module

The Contractor shall add the virtual Control Plane Assurance Analyzer module and adequate license points to the new NSP VM platforms to provide the features and management capabilities afforded by this NSP module.

6.8 Secure Shell Protocol (SSH)

All servers shall be configured with SSH enabled and listening. The Contractor shall provide root login credentials to the FDOT for remote access to the new server hardware.

6.9 Workaround to Support Backup of MPRe 9500 SA Radios

Due to the documented NSP Limitation, the Contractor shall implement the following workaround to mitigate issues with NFM-P taking automatic configuration backups from and performing software upgrades to MPRe radios and Microwave Service Switches

(MSS) devices.

Documented workaround: SFTP backup and software upgrade on MPRe and

MSS-1c fails if the SSH version on the NFM-P is greater than or equal to 7.4 (SSH-

2.0-OpenSSH_7.4). The workaround is to connect/add a server which has SSH version less than 7.4.

[NSPD-223698]

Addendum 1

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

6.10 Login Credentials

To minimize disruption of services and end-user access, all user accounts, credentials, and/or login information shall be replicated on the new servers to match the existing servers being replaced. Existing server login credentials will be supplied by FDOT to the Contractor immediately following the Notice to Proceed.

6.11 Other Required Application Software

The Contractor shall furnish and install any remaining application software required on the new servers to maintain complete and original or enhanced functionality of the servers’ intended uses. All furnished and installed application software shall be supplied by the Contractor and be of the most recent generally available stable release.

6.12 Required Ancillary Equipment

6.12.1 -48V DC to 115V AC Inverters and Rack Mount Trays

The Contractor shall furnish and install nine (9) -48V DC to 115V AC power inverters (part number ICT1500-48SWTC); four to be installed at the Wilson Rd site, and five to be installed at the McArthur site. Each inverter shall be connected to each server’s power supply. Each inverter’s DC input shall be connected to the site’s DC battery plant distribution breaker panel.

The Contractor shall also furnish and install five (5) rackmount trays for the inverters (part number ICT-RM2U). Two inverters shall be mounted per rack mount tray.

One mount tray at the McArthur site will hold one inverter for the SFTP proxy server.

6.12.2 SFTP Proxy Server

To implement the NSP Limitation Workaround as described in Section 6.9, the Contractor shall furnish and install a new Dell Precision 3930 rack mountable desktop-class PC running Ubuntu Server 20.04 LTS 64-bit (or newer). The workstation shall have 32 GB RAM and a 1 TB SSD hard drive as minimum specifications. The SFTP/SSH daemon installed on this server shall NOT exceed release 7.4, and ideally should be version

6.9. This SFTP proxy server shall be installed at the McArthur location.

The NSP/NFM-P shall be configured to use this “proxy” SFTP/SSH server for collecting daily configuration backups of network elements. The actual configuration backup files retrieved by NFM-P shall be stored on the NSP/NFM-P servers and NOT on the proxy SFTP/SSH server.

To ensure proper functionality, the SFTP/SSH “proxy” server shall be configured in the same IP subnet as the NSP servers. The Contractor shall be responsible for any NOKIA equipment delta configurations to support the addition of this proxy SFTP/SSH server.

The Dell Precision 3930 rack-mountable workstation shall be AC powered via a -48V DC to 120V AC power inverter, as shown in the technical drawings package.

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Addendum 1

7. POST-INSTALLATION INSPECTION AND VERIFICATION

7.1 General

Following installation, a visual inspection shall be performed by the FDOT Project

Manager or their designee.

The Contractor shall notify the FDOT Project Manager at least seven calendar days prior to the desired inspection date. During the inspection, the FDOT Project Manager or their designee(s) shall verify that the new servers have been satisfactorily installed and all systems function as intended.

Items to be inspected shall include, but not be limited to:

� Visual inspection of:

o Server physical installation.

o Cable management and labelling.

� Server Configuration o NSP/NFM-P application functions and system functions.

8. ACCEPTANCE

Upon completion of the visual inspections and application performance verification testing by the Department, the Department will accept the work described herein. Acceptance shall not constitute any waiver of the Department's rights to warranty and/or warranty maintenance.

9. MAINTENANCE

The new NSP server equipment shall be maintained under the FDOT’s Maintenance and

Software Subscription Plan with Nokia of America Corp. (FDOT Purchase Order

EP66009).

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

A-1

SHEET NO.

NSP Servers Upgrade

KEY SHEET

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

SITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx

FLORIDA DEPARTMENT OF TRANSPORTATION

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501

CONTRACT PLANS RECORD

REV.DATE DESCRIPTION REV.DATE DESCRIPTION

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

PENSACOLA

TALLAHASSEE

JACKSONVILLE

TAMPA

NAPLES

FT LAUDERDALE

MIAMI

KEY WEST

ORLANDO

LAKE

CITY

Appendix a

STATEWIDE FION NSP SERVERS UPGRADE

Intelligent transportation systems plans

NOTE: THESE PLANS ARE NOT DRAWN TO SCALE

INDEX OF PLANS

SHEET NO. SHEET DESCRIPTION

A-1 NSP SERVERS UPGRADE KEY SHEET

B-1 WILSON ROAD SITE LAYOUT

B-2 WILSON ROAD FLOOR PLAN

B-3 WILSON ROAD RACK PROFILE

B-4 WILSON ROAD DC DISTRIBUTION PANELS

C-1 MCARTHUR INTERCHANGE SITE LAYOUT

C-2 MCARTHUR DOT FLOOR PLAN

C-3 MCARTHUR DOT RACK PROFILE

C-4 MCARTHUR DOT DC DISTRIBUTION PANELS

GOVERNING STANDARDS AND SPECIFICATIONS:

FLORIDA DEPARTMENT OF TRANSPORTATION,

DESIGN STANDARDS CURRENT EDITION,

AND STANDARD SPECIFICATIONS FOR ROAD AND

BRIDGE CONSTRUCTION CURRENT EDITION,

AS AMENDED BY CONTRACT DOCUMENTS. FDOT PROJECT MANAGER: KENNETH SHIVER

0 30 60 miles

LOCATIONS OF PROJECT

WILSON ROAD:

4945 WILSON RD

SANFORD, FL 32771

ASR: 1306728

COORDINATES: 28°48'02.8" N, 81°20'40.1" W

MCARTHUR INTERCHANGE:

FLORIDA TURNPIKE MP 58

5100 W. SUNRISE BLVD

FORT LAUDERDALE, FL 33313

ASR: 1049428

COORDINATES: 26°08'15.0" N, 80°13'03.0" W

ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

B-1

Wilson ROAD

SITE layout

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

WILSON RO AD

SITE NAME FINANCIAL PROJECT IDCOUNTY

SEM INOLE

\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx

FLORIDA DEPARTMENT OF TRANSPORTATION

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501

CONTRACT PLANS RECORD

REV.DATE DESCRIPTION REV.DATE DESCRIPTION

NOTE: THESE PLANS ARE NOT DRAWN TO SCALE

WILSON ROAD (DIRT)

L/A ROW

GRASS

GRASS

FENCE

ELECTRICAL

PULLBOX

ELECTRICAL PULLBOX

JUNCTION BOX

LIGHTING LOAD

CENTER

PULLBOX

FHP SPLICE

BOX

F.O.C.

CONDUIT

(FDOT D5)

FENCE

4800 WILSON ROAD

RETENTION POND

FDOT

SPLICE

BOX

BURIED 2000 GALLON LPG TANK

ROLLING

GATE

LEG A 80º

LEG B 200º

LEG C 320º

DELAND

200' & 170'

9.7º

ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

B-2

Wilson ROAD

FLOOR PLAN

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

WILSON RO AD

SITE NAME FINANCIAL PROJECT IDCOUNTY

SEM INOLE

\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx

FLORIDA DEPARTMENT OF TRANSPORTATION

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501

CONTRACT PLANS RECORD

REV.DATE DESCRIPTION REV.DATE DESCRIPTION

NOTE: THESE PLANS ARE NOT DRAWN TO SCALE

M D

P M

.D

ABSOLYTE GNB 90G15

BATTERY PLANT

A T

S

A C

A C

C U

M M

IN

S

C

N L

P G

A S

G E

N E

R A

T O

R

K W

/ 5

K V

A

-4

V D

C R

A C

K

B B

-1

N O

K

IA

R A

C K

B B

-1

F D

O T

F

IB

E

C K

B B

-1

N O

K

IA

R A

D

IO

C K

B B

-6

F U

T U

R E

H A

R R

IS

B B

-5

H A

R R

IS

B B

-8

H A

R R

IS

B B

-7

F U

T U

R E

F D

O T

B B

-3

F U

T U

R E

F D

O T

B B

-2

-4

V

C

X

P A

N S

IO

N

R A

C K

B B

-4

NSP SERVERS TO

BE INSTALLED

HERE.

ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

Secondary Distribution

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501 B-3

SHEET NO.

Wilson Road

RACK PROFILE

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

SITE NAME FINANCIAL PROJECT IDCOUNTY

CONTRACT PLANS RECORD

REV.DATE

DESCRIPTION REV.DATE DESCRIPTION

SEM INOLEWILSON RO AD

-48VDC / NMS RACK

NSP-1-1 INVERTERS

NSP-1-1 SERVER

NSP-1-2 INVERTERS

NSP-1-2 SERVER

A

B

C

D

A. ICT -48V DC TO 120V AC

INVERTER SHELF #1 (TWO INVERTERS)

B. NOKIA NETWORK SERVICES

PLATFORM SERVER #1

C. ICT -48V DC TO 120V AC

INVERTER SHELF #2 (TWO INVERTERS)

D. NOKIA NETWORK SERVICES

PLATFORM SERVER #2

EXISTING FDOT EQUIPMENT

FURNISHED AND INSTALLED BY CONTRACTOR

LEGEND:

SCALE IS APPROXIMATE

0.0 ft. 0.9 ft. 1.5 ft. 3.0 ft.

WEB AUTHORIZER

SERVER

BB-4

ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501 B-4

SHEET NO.

Wilson Road

DC Distribution panels

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

SITE NAME FINANCIAL PROJECT IDCOUNTY

SEM INOLE

LEGEND:

WILSON ROAD

DC DISTRIBUTION PANEL SCHEDULES

WILSON RO AD

SECONDARY DC DISTRIBUTION PANEL TOP VIEW (REAR)

A3 A2 A1A4A7 A6 A5A8A9B3 B2 B1B4B7 B6 B5B8B9

SECONDARY DC DISTRIBUTION PANEL TOP VIEW

TO INVERTERS

PRIMARY DISTRIBUTION PANEL SCHEDULE

SECONDARY DISTRIBUTION PANEL SCHEDULE

ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

C-1

McArthur INTERCHANGE

SITE Layout

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

SITE NAME FINANCIAL PROJECT IDCOUNTY

BRO WARD

\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx

FLORIDA DEPARTMENT OF TRANSPORTATION

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501

CONTRACT PLANS RECORD

REV.DATE DESCRIPTION REV.DATE DESCRIPTION

NOTE: THESE PLANS ARE NOT DRAWN TO SCALE

LP

MCARTHUR

TURNPIKE SHELTER

FENCE

LODESTAR

TENANTS

CAMERA POLE

A 10º

C 250º

B 130º

POMPANO BEACH

160'

22.8º

ANDYTOWN

181' & 136'

272.1º

OKEECHOBEE

190' & 140'

212.2º

MCARTHUR DOT

SHELTER

MCARTHUR INT ERCHANGE ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

C-2

Mcarthur DOT

Floor Plan

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

MCARTHUR INT ERCHANGE

SITE NAME FINANCIAL PROJECT IDCOUNTY

BRO WARD

\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx

FLORIDA DEPARTMENT OF TRANSPORTATION

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501

CONTRACT PLANS RECORD

REV.DATE DESCRIPTION REV.DATE DESCRIPTION

UHF RADIO

RACK

SU02

BJ-3

UHF RADIO

RACK

SU01

BJ-4

47MHZ

RACK

BJ-1

ITS WAN

RACK

BJ-6

RACK

BJ-7

CHANNEL

BANK RACK

BJ-10

TPK NOKIA

RADIO RACK

BJ-11

NEW

BATTERY

RACK 1

NEW

BATTERY

RACK 2

-48VDC

RECTIFIER

BJ-5

0 1.5 2.5 5

SCALE IS APPROXIMATE

I75.3

NOKIA

RADIO RACK

BJ-13

2'-5"

2'-8"

MDF

Tower

Light

2'-6"

NMS RACK

BJ-9

LEGEND:

NOTE:

THIS RACK MAY NOT INITIALLY EXIST IN THE INDICATED LOCATION DUE

TO THE SCHEDULE OF OTHER PROJECTS. SHOULD THIS BE THE CASE

PRIOR TO INSTALLATION OF THE NEW NSP SERVERS, THE FDOT SHALL

HAVE A RACK MADE AVAILABLE IN THE INDICATED LOCATION FOR

INSTALLATION OF THE NSP SERVERS AND DC INVERTER EQUIPMENT.

THE CONTRACTOR SHALL INSTALL THE EQUIPMENT RELATED TO THIS

SCOPE OF SERVICES AS INDICATED, UNDERSTANDING THAT THE OTHER

EQUIPMENT WILL BE INSTALLED BY OTHERS AT A LATER TIME.

NSP SERVERS TO

BE INSTALLED

HERE.

ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

TELENIUM SERVER

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501 C-3

SHEET NO.

MCARTHUR DOT

RACK PROFILE

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

SITE NAME FINANCIAL PROJECT IDCOUNTY

BRO WARDMCARTHUR INT ERCHANGE

-48VDC RECTIFIER / NMS RACK

NSP-2-1 INVERTERS

NSP-2-1 SERVER

NSP-2-2 INVERTERS

NSP-2-2 SERVER

AUXILIARY SFTP/SSH

SERVER

A

B

C

LEGEND:

SCALE IS APPROXIMATE

0.0 ft. 0.9 ft. 1.5 ft. 3.0 ft.

SFTP SERVER

INVERTER

F

A. ICT -48V DC TO 120V AC

INVERTER SHELF #1 (TWO INVERTERS)

B. NOKIA NETWORK SERVICES

PLATFORM SERVER #1

C. ICT -48V DC TO 120V AC

INVERTER SHELF #2 (TWO INVERTERS)

D. NOKIA NETWORK SERVICES

PLATFORM SERVER #2

E. AUXILIARY SFTP/SSH

SERVER

F. ICT -48V DC TO 120V AC

INVERTER SHELF (ONE INVERTER) FOR SFTP

PROXY SERVER

BJ-5

ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services

605 SUWANNEE ST. MS 90

TALLAHASSEE, FL 32399-0450

PH.(850)-410-5600

FAX.(850)-410-5501 C-4

SHEET NO.

McArthur DOT

DC Distribution panels

STATE OF FLORIDA

DEPARTMENT OF TRANSPORTATION

SITE NAME FINANCIAL PROJECT IDCOUNTY

BRO WARD

LEGEND:

MCARTHUR DOT

DC DISTRIBUTION PANEL SCHEDULES

PRIMARY DISTRIBUTION PANEL SCHEDULE SECONDARY DISTRIBUTION PANEL SCHEDULE

MCARTHUR INT ERCHANGE ADDENDUM 1

SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE

DOT-ITB-24-9034-SD

Exihibit A - Scope of Services