This document is an Addendum for an Invitation to Bid (ITB) issued by the Florida Department of Transportation (FDOT) for the upgrade of their Nokia Network Services Platform (NSP) servers. The addendum revises the timeline, scope of services, and provides additional questions and answers.
The scope of work involves furnishing and installing new server hardware and operating system software to replace the existing end-of-life servers at two FDOT sites - the Wilson Road tower site in Sanford, FL and the McArthur Interchange tower site in Plantation, FL. The new servers will run NSP release 23.4 and include additional software modules and license points. The Contractor will be responsible for migrating the existing databases, configuring the new servers, and implementing a workaround for backing up certain network elements. The revised timeline provides updated due dates, with bids due on November 16, 2023 and the public opening on November 20, 2023. The contract will be awarded to the successful bidder, with no mention of any renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.pdf | ||
| 9034 Questions and Answers Part 2.pdf | ||
| Solicitation Document 9034.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA DEPARTMENT OF TRANSPORTATION
Procurement Office
605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450
Phone: (850) 414-4477
ADDENDUM NO. 1 DATE: November 8, 2023
BID No.: DOT-ITB-24-9034-SD
BID Title: Nokia Network Services Platform Upgrade
OPENING DATE: Monday, November 20, 2023, @ 11:00 AM EST
Notice is hereby given of the following changes to the above-referenced SOLICITATION:
• Revised Timeline Attached Below
• Part I – Questions and Answers attached below (additional questions received after the original date for questions and answers through November 13, 2023, will be advertised within VIP via a Part II – Questions and Answers document.
• Revised Scope of Services attached below. The original Scope of Services located within the solicitation should be deleted and replaced with the attached
Revised Scope of Services
Bidders/Proposers must acknowledge receipt of this Questions and Answers Document by completing and returning to the Procurement Office, by no later than the time and date of the bid/proposal opening. Failure to do so may subject the bidder/proposer to disqualification.
Sally Dobson, Procurement Agent
Bidder/Proposer
Address
Submitted by (Signature)
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
605 Suwannee Street, MS 20
REVISED TIMELINE
ACTION / LOCATION DATE LOCAL TIME
DEADLINE FOR TECHNICAL QUESTIONS - 11-01-2023 05:00 PM
There is no deadline for administrative questions. 11-13-2023
BIDS DUE (ON OR BEFORE) - 11-16-2023 09:00 AM
Florida Department of Transportation 11-20-2023 Central Procurement Office Sally Dobson, Procurement Agent Phone: (850) 414-4477 CO.Purch@dot.state.fl.us
PUBLIC OPENING - 11-16-2023 11:00 AM
Florida Department of Transportation 11-20-2023 Central Procurement Office Attn: Sally Dobson, Procurement Agent- 605 Suwannee Street Tallahassee, FL 32399-0450
POSTING OF INTENDED DECISION/AWARD - 11-21-2023
11-27-2023
605 Suwannee Street, MS 20
QUESTIONS AND ANSWERS
Question 1 Are there any special access restrictions such as time or escort requirements for the Wilson Road or
McArthur sites?
Answer 1 Access is available Monday through Friday, 8 a.m. - 5 p.m., local time. Escort is not required if contractor has personnel that successfully passed the SLERS background check, otherwise, FDOT escort will be provided as reasonably required.
Question 2 Have rack locations/space been identified for the new servers and rectifiers?
Answer 2 Rack elevation drawings are provided in the drawing package. Please refer to Addendum #1.
Question 3 We see the McArthur site locations is changing. Is the Wilson Road location unchanged?
Answer 3 There are changes to the floor plan and rack layouts at both McArthur and Wilson Road locations. These are reflected in the drawing package. Please refer to Addendum #1.
Question 4 Will the new servers have new IP addresses available in order to facilitate migration?
Answer 4 Two servers will need new IP address and will be provided by the FDOT. Two servers will re-use the existing server's IP addresses. The information will be provided to the awarded contractor.
Question 5 Will FDOT be configuring the necessary IP environment or is this a contractor requirement?
Answer 5 The IP environment will be ready to support the installation of the new equipment. FDOT will perform any required configuration changes with the assistance of NOKIA support.
Question 6 Will remote access be available to servers to allow remote configuration and test?
Answer 6 The FDOT can provide SSL secure remote access to contractor personnel that complete the necessary background check and training.
Question 7
Are the HP servers AC powered, hence the inverters? Do you intend the Dell severs to be DC powered or powered by inverters?
Answer 7
NOKIA has informed the FDOT that they currently do not support NSP servers with DC power supplies. Therefore, the NOKIA-supported HP AC-powered servers are required to utilize inverters. The work-around SFTP server based on a Dell rack-mount workstation is also AC powered and will require an inverter. Please refer to Addendum #1.
Question 8
Can you elaborate on 6.11? Are there any expectations of additional software or application requirements?
Answer 8 It is the responsibility of the contractor to provide a complete and functioning installation.
Section 6.11 is included to cover any unknowns that may be required for full functionality of the NSP applications.
Question 9
Are there specific software applications that have been tested to meet the requirements of 6.12.2 or is it anticipated that the contractor will identify or develop these services?
Answer 9
This section describes a known NSP limitation with respect to SFTP and the NOKIA-provided workaround to be implemented. If more specific information is required, we recommend contacting NOKIA support. It is not expected that the contractor will require to develop these services as off the shelf SFTP components can be used.
EXHIBIT A
INVITATION TO BID
SCOPE OF SERVICES
FOR
NOKIA SERVICES PLATFORM (NSP)
NETWORK MANAGEMENT SERVERS UPGRADE
\\DOTSCOTEO01.DOT.STATE.FL.US\TRAFFIC_OPS_DATA\8. TSMO\TELCOM\FION\NOKIA MAINTENANCE SUPPORT\NSP SERVERS UPGRADE\NOKIA NSP SERVER
UPGRADES - 20230629 - FINAL.DOCX
Addendum 1
November 8, 2023
Exihibit A - Scope of Services Rev. 11.08.2023
DOT-ITB-24-9034-SD
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
Addendum 1
1. OVERVIEW
2. ACRONYMS
3. TERMS
4. SITES OF WORK
4.1 Site 1
4.2 Site 2
5. SCOPE OF WORK AND SERVICES
5.1 Responsibilities of the Contractor
5.1.1 EMPLOYEE BACKGROUND INVESTIGATION AND I.D. BADGES
5.2 Notice to Proceed
5.3 Migration Plan Submittal
5.4 Relocation of Standby Server to McArthur Central Office
5.4.1 Reconfiguration of 7705 SAR-18 Routers
6. SERVER HARDWARE, SOFTWARE AND ANCILLARY EQUIPMENT
6.1 Servers
6.1.1 Network Interfaces and IP Addressing
6.1.2 Out of Band Hardware Management Interface
6.2 Operating System Software
6.3 NSP Software and Feature Packages and Parameters (as sized by NOKIA)
6.4 Databases
6.5 Model Driven Mediation
6.6 NFM-P License Points
6.7 New NSP Management Modules to be Installed
6.7.1 Service Assurance Feature Package (FP)
6.7.2 Virtual Control Plane Assurance Analyzer (vCPAA) Module
6.8 Secure Shell Protocol (SSH)
6.9 Workaround to Support Backup of MPRe 9500 SA Radios
6.10 Login Credentials
6.11 Other Required Application Software
6.12 Required Ancillary Equipment
6.12.1 -48V DC to 115V AC Inverters and Rack Mount Trays
6.12.2 SFTP Proxy Server
7. POST-INSTALLATION INSPECTION AND VERIFICATION
7.1 General
8. ACCEPTANCE
9. MAINTENANCE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
1. OVERVIEW
This document provides the technical specifications and requirements to upgrade server hardware at the Florida Department of Transportation’s (FDOT) two sites running Nokia
Services Platform (NSP) release 20.6 Service Pack 6 to new server hardware running
NSP release 23.4.
FDOT requires the server hardware and operating system and application software be upgraded at two sites: the Wilson Road tower site in Sanford, FL, and the McArthur
Interchange tower site in Plantation, FL.
This scope of services describes the work required to upgrade these systems.
2. ACRONYMS
FDOT Florida Department of Transportation
ITS Intelligent Transportation Systems
NFM-P Nokia Functions Manager – Packet
NSP Nokia Services Platform
OAMP Operations, Administration, Management and Provisioning
OOB Out of Band
RAID Redundant Array of Inexpensive Disks
3. TERMS
Department: Florida Department of Transportation
Traffic Engineering and Operations Office; ITS Section
605 Suwannee Street, MS 90
Tallahassee, Florida 32399-0450
Contractor: Nokia of America Corp.
3100 Olympus Blvd, Suite 100
Dallas, TX 75019
Ph: 1-770-289-8571
Contact: Randy Williams
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
FDOT Project Manager: Kenneth Shiver
FDOT Traffic Systems Management and Operations
ITS Section
605 Suwannee Street, MS 90
Tallahassee, Florida 32399-0450
V: (850) 410-5608, F: (850) 410-5501
Kenneth.Shiver@dot.state.fl.us
Project Consultant: David Heupel, Sr. ITS Analyst IV
FDOT Traffic Systems Management and Operations
605 Suwannee Street, MS 90
Tallahassee, Florida 32399-0450
V: (850) 410-5618 david.heupel@dot.state.fl.us
4. SITES OF WORK
4.1 Site 1
Wilson Road Tower Site
4975 Wilson Rd
Sanford, FL 32771
Figure 1: District 5 RTMC and Wilson Road Tower Site
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
4.2 Site 2
McArthur Interchange Tower Site
Central Office RF Shelter
5100 W Sunrise Blvd
Plantation, FL 33313
Figure 2: McArthur Interchange Tower Site
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
Figure 3: McArthur Interchange Compound (Central Office RF Shelter highlighted pink).
5. SCOPE OF WORK AND SERVICES
The Contractor shall furnish and install the new equipment including hardware, RAID configuration, operating system and all applicable software installations, and number of needed physical network interfaces on both servers for replacement of the existing server hardware.
To preserve historical network alarms and performance information, the Contractor shall migrate the databases from the existing primary NSP server to the new servers.
The services performed by the Contractor shall result in the replacement of the outdated hardware and software with new equipment and operating systems/software to maintain complete and/or provide enhanced functionality of the system as it exists today.
The Contractor shall remove and dispose of the replaced servers at both sites following installation and acceptance of the new servers. Once the old servers are removed from
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1 service following turn-up of the new server hardware, the Contractor shall wipe the old servers’ hard drives according to the U.S. Department of Defense 5220.22-M data erasure standard and return the hard drives to the FDOT for final destruction.
5.1 Responsibilities of the Contractor
The Contractor shall furnish and install for the FDOT, server hardware suitable for running
Nokia Services Platform (NSP) Release 23.4 in a virtualized environment.
The Contractor shall provide a turnkey installation of all software, licenses, new management software modules and license “points” as specified below, labor for installation of software and hardware, turn-up, and full commissioning of the new NSP servers and software.
The Contractor shall be responsible for any additional work and/or components required for a complete and functional installation.
The Contractor shall install all hardware in accordance with good engineering practices, including adhering to any FDOT-provided installation drawings, plans, cabling diagrams, labeling, electrical wiring, and grounding information.
5.1.1 Employee Background Investigation And I.D. Badges
Maintenance to secure facilities is part of this contract. Therefore, the Contractor’s and any sub-contractor’s personnel will be required to provide employees and agents that can, as a minimum requirement, be authorized security clearance by the Florida Department of Law Enforcement (FDLE) to enter secure Law Enforcement sites such as the Florida
Highway Patrol (FHP) facilities and sites where Law Enforcement systems are collocated with the Department’s FION infrastructure or the FION fixed site equipment.
Background checks will be conducted by law enforcement for all employees and agents of the Contractor and any sub-contractor that performs or supervises work under this contract. Any new employee will be denied access to these facilities unless and until a background investigation has been completed for this individual or they are accompanied by someone who possesses such clearance. The Contractor will be responsible for publishing and providing photo I.D. badges to all employees given security clearance by the Department. Contractor employees not wearing current photo I.D. badges shall be denied access to secure sites.
All I.D. badges must include, as a minimum, the full name of the employee, employer, employer address and phone number, FDOT Contract number, signature, and expiration date. The expiration date on the badge must be the expiration date of this Contract. Only personnel that have been background checked and approved by the Department Project
Manager in writing can be issued this identification badge. New badges must be issued in the event the Department extends the Contractor’s contract beyond the end date.
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
The Department reserves the right to prevent or limit site access to any person that has either not submitted to a background investigation or that the background investigation has revealed that there is a security risk with that person. The Contractor can submit, in writing to the Department Project Manager, a request to allow a Contractor’s employee who does not have security clearance to enter a secure site provided this employee is accompanied by another employee that does have security clearance with the understanding that the Contractor will be responsible for each of the Contractor’s employees and the security cleared employee will be revoked clearance if the Department finds that the cleared employee is allowing non-cleared personnel to enter secure sites without the written approval of the Department Project Manager.
The link below outlines the requirements for obtaining the necessary clearance.
https://www.dms.myflorida.com/content/download/108048/608496/SOP_8.pdf
Contractor’s personnel can initiate the screening process by sending an email to the
Project Consultant who will direct the Contractor’s personnel to individuals who can assist with the background screening and CJIS security training processes.
5.2 Notice to Proceed
The Contractor shall not perform any work until a Notice to Proceed (NTP) is received from the FDOT Project Manager or their designee.
5.3 Migration Plan Submittal
The Contractor shall submit to the FDOT, a Migration Plan detailing the processes and procedures that will be performed to install the software, migrate existing data and install/migrate the systems to the new server hardware.
The Contractor shall not perform any work until the Migration Plan is approved in writing by the FDOT.
5.4 Relocation of Standby Server to McArthur Central Office
The existing standby server is located at the McArthur Interchange (Turnpike) shelter. As part of this scope, the Contractor shall install the new standby server at the McArthur
Central Office shelter and shall interface it to the existing 7705 SAR-18 router. Both shelters are located in the same compound.
5.4.1 Reconfiguration of 7705 SAR-18 Routers
Due to the relocation of the NSP server, and the addition of a proxy SFTP/SSH server, the 7705 SAR-18 router at each shelter (McArthur Interchange and McArthur Central
Office) will require delta configuration.
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
The Contractor shall be responsible for performing delta configuration of the 7705 SAR-
18 routers at these and any other FDOT network locations, as required, to fully support the relocation of the standby NSP server and the addition of the proxy SFTP/SSH server.
6. SERVER HARDWARE, SOFTWARE AND ANCILLARY EQUIPMENT
This section describes the equipment to be upgraded.
6.1 Servers
There are a total of two existing NSP servers, one at each of the aforementioned sites.
The existing NSP servers are end of life and end of support. The new replacement servers shall be installed to support a virtualized NSP environment for network management.
The Contractor shall furnish and install:
� NOKIA Part number 3HE17440BA, NSP Server with RHEL 8.6, Qty 4.
� NOKIA Part number 3HE16004AA, NSP Service Activation + Configuration Feature
Package with 3,278 license points (at a minimum).
� NOKIA Part number 3HE16005AA, NSP Service Assurance Feature Package with
3,278 license points (at a minimum).
� NOKIA Part number 3HE10161AA, NSP Software Release Subscription for 3 years
(to end no earlier than 9/16/2026).
� HP Hardware Support through NOKIA for 5 years.
Each location shall receive two new servers to replace the existing single units.
6.1.1 Network Interfaces and IP Addressing
Unless otherwise not supported, the new servers’ network interfaces shall be configured in the same manner and addressing scheme as the existing servers to maintain communications with network elements and management systems as well as to avoid disruption for end users accessing the platforms.
Network patch cables shall be labeled before removal of the existing hardware to ensure they are plugged into the proper ports on the new servers when installed.
All relevant IP addressing, router configurations and other similar sensitive information will be provided to the Contractor awarded this project following the award announcement of the successful bidder. The awarded Contractor shall coordinate exchange of this
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1 information with the FDOT, including any additional information required to complete the work.
NOTE: If additional IP addresses are required to support the implementation of the new NSP servers (e.g., addresses needed for VM instances, server heartbeat messaging, etc.), the Contractor shall coordinate with the FDOT for these address requirements and assignments.
6.1.2 Out of Band Hardware Management Interface
The servers shall be equipped with an out of band (OOB) management interface.
The Contractor shall configure the OOB interface to communicate with NSP and/or the
Telenium network management systems to alert on hardware condition and health metrics.
6.2 Operating System Software
The servers shall be licensed for the RedHat Enterprise Linux (RHEL) operating system release 8.6 (current release) and Kernel-based virtual machine hypervisor.
6.3 NSP Software and Feature Packages and Parameters (as sized by NOKIA)
The following information and configuration parameters were previously vetted and supplied by NOKIA as an NSP hardware platform that will replace FDOT’s existing servers. The Contractor shall conform to the list below when furnishing and configuring the new NSP servers.
NSP Release 23.4
Customer Name Florida Department of Transportation
Customer Network Name FDOT NSP-MD R23.4
Customer Network Region NAR
Customer Network Location Florida
What platform will NFM-P be deployed on?
nspServer
Deployment Size Production - Medium
Environment Type NSP Server
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
NFM-P Redundancy Type Geographic Redundancy
Auxiliary Database Redundancy Model (If Applicable)
Default (Matches NFM-P Redundancy)
Is NFM-T/WS-NOC integration needed? Yes
NFM-P Release 23.4
NFM-P Network Size Medium
Custom NFM-P Network Elements No
Bill Of Materials Yes
BoM Type Brownfield
RHEL QCOW2s needed? No
Additional QCOW2s needed. 0
License Points 0
Wireless License Points 0
Existing License Points 3278
Existing Wireless License Points 0
HA LPs in the Existing Network? Yes
Existing Software Suite NFM-P Standard
Extended NE Software Support 0
Licensed AA Residential Subscribers 0
Licensed AA Mobile Subscribers 0
Licensed AA Business Subscribers 0
Resource Control Class 1 Nodes 0
Resource Control Class 2 Nodes 0
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
Resource Control Class 3 Nodes 0
Resource Control Class 4 Nodes 0
CDRC 10G Links 0
400ZR Links 0
Baseline Analytics Size none
NSP Indicators Size Small
Additional active MDM instances 0
NSP Platform Yes
Classic Mediation Yes
Model Driven Mediation Yes
Standard Routers Yes
MDM Telemetry Yes
T-BTS NEs No
Network Infrastructure Management Yes
Service Activation and Configuration Yes
Service Assurance Yes
Network Operations Analytics No
Transport Slice Operations No
3GPP Packet Core Management No
Force Include Intent Manager No
Force Include Work Flow Manager No
Original Service Fulfillment No
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
Intent Based Service Fulfillment Yes
Basic Management Network Infrastructure Management
Yes
Device Configuration Network Infrastructure Management
Yes
IGP Topology Network Infrastructure Management
Yes gRPC Telemetry Yes gNMI ON_CHANGE Yes
Simplified RAN Transport No
Telemetry No
Control and Visualization Starter No
Path Control and Optimization No
Enhanced Optimization No
NSP Flow Collector No
Simulation No
Multi-layer Discovery and Visualization No
Optical NEs managed by Optical Controllers
No
Optical NEs managed by MDM Adaptors No
Multi-layer Control Coordination No
IP and Physical Link Failure Simulation No
NSP Baseline Analytics No
Performance Indicators and Alerts Network Infrastructure Management
Yes
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
NSP Software Development Kit No
Intent Based Networking Framework No
Workflow Automation Engine No
Horizontal Scalability of Classic Mediation
No
NSP High Availability No
NSP Disaster Recovery Yes
Logging and Monitoring Yes
Number of vCPAAs 2
NSP Flow Collector No
AA Cflowd Records No
System Cflowd (IPFix) Records No
CGNat Cflowd Records No
NSP Analytics No
Application Assurance configuration None
Network and Service configuration None
6.4 Databases
In the interest of saving historical alarm and performance data, the Contractor shall preserve and migrate the databases on the existing servers to the new servers.
6.5 Model Driven Mediation
The Contractor shall set up and configure the new NSP servers to support the new Model
Driven Mediation architecture to enhance functionality and prepare the servers for future releases of NSP software.
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
6.6 NFM-P License Points
As required, the Contractor shall be responsible for furnishing additional license points to cover the additional new NSP management modules as described below.
The existing servers are licensed for 3,278 license points, of which 253 license points are unconsumed and reserved for future use. The Contractor shall ensure that at a minimum, 3,278 license points are provided with the new servers, and no less than 253 license points remain available for future use.
6.7 New NSP Management Modules to be Installed
6.7.1 Service Assurance Feature Package (FP)
The Contractor shall add the Service Assurance FP and adequate license points to the new NSP VM platforms to provide the features and management capabilities afforded by this NSP module.
6.7.2 Virtual Control Plane Assurance Analyzer (vCPAA) Module
The Contractor shall add the virtual Control Plane Assurance Analyzer module and adequate license points to the new NSP VM platforms to provide the features and management capabilities afforded by this NSP module.
6.8 Secure Shell Protocol (SSH)
All servers shall be configured with SSH enabled and listening. The Contractor shall provide root login credentials to the FDOT for remote access to the new server hardware.
6.9 Workaround to Support Backup of MPRe 9500 SA Radios
Due to the documented NSP Limitation, the Contractor shall implement the following workaround to mitigate issues with NFM-P taking automatic configuration backups from and performing software upgrades to MPRe radios and Microwave Service Switches
(MSS) devices.
Documented workaround: SFTP backup and software upgrade on MPRe and
MSS-1c fails if the SSH version on the NFM-P is greater than or equal to 7.4 (SSH-
2.0-OpenSSH_7.4). The workaround is to connect/add a server which has SSH version less than 7.4.
[NSPD-223698]
Addendum 1
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
6.10 Login Credentials
To minimize disruption of services and end-user access, all user accounts, credentials, and/or login information shall be replicated on the new servers to match the existing servers being replaced. Existing server login credentials will be supplied by FDOT to the Contractor immediately following the Notice to Proceed.
6.11 Other Required Application Software
The Contractor shall furnish and install any remaining application software required on the new servers to maintain complete and original or enhanced functionality of the servers’ intended uses. All furnished and installed application software shall be supplied by the Contractor and be of the most recent generally available stable release.
6.12 Required Ancillary Equipment
6.12.1 -48V DC to 115V AC Inverters and Rack Mount Trays
The Contractor shall furnish and install nine (9) -48V DC to 115V AC power inverters (part number ICT1500-48SWTC); four to be installed at the Wilson Rd site, and five to be installed at the McArthur site. Each inverter shall be connected to each server’s power supply. Each inverter’s DC input shall be connected to the site’s DC battery plant distribution breaker panel.
The Contractor shall also furnish and install five (5) rackmount trays for the inverters (part number ICT-RM2U). Two inverters shall be mounted per rack mount tray.
One mount tray at the McArthur site will hold one inverter for the SFTP proxy server.
6.12.2 SFTP Proxy Server
To implement the NSP Limitation Workaround as described in Section 6.9, the Contractor shall furnish and install a new Dell Precision 3930 rack mountable desktop-class PC running Ubuntu Server 20.04 LTS 64-bit (or newer). The workstation shall have 32 GB RAM and a 1 TB SSD hard drive as minimum specifications. The SFTP/SSH daemon installed on this server shall NOT exceed release 7.4, and ideally should be version
6.9. This SFTP proxy server shall be installed at the McArthur location.
The NSP/NFM-P shall be configured to use this “proxy” SFTP/SSH server for collecting daily configuration backups of network elements. The actual configuration backup files retrieved by NFM-P shall be stored on the NSP/NFM-P servers and NOT on the proxy SFTP/SSH server.
To ensure proper functionality, the SFTP/SSH “proxy” server shall be configured in the same IP subnet as the NSP servers. The Contractor shall be responsible for any NOKIA equipment delta configurations to support the addition of this proxy SFTP/SSH server.
The Dell Precision 3930 rack-mountable workstation shall be AC powered via a -48V DC to 120V AC power inverter, as shown in the technical drawings package.
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Addendum 1
7. POST-INSTALLATION INSPECTION AND VERIFICATION
7.1 General
Following installation, a visual inspection shall be performed by the FDOT Project
Manager or their designee.
The Contractor shall notify the FDOT Project Manager at least seven calendar days prior to the desired inspection date. During the inspection, the FDOT Project Manager or their designee(s) shall verify that the new servers have been satisfactorily installed and all systems function as intended.
Items to be inspected shall include, but not be limited to:
� Visual inspection of:
o Server physical installation.
o Cable management and labelling.
� Server Configuration o NSP/NFM-P application functions and system functions.
8. ACCEPTANCE
Upon completion of the visual inspections and application performance verification testing by the Department, the Department will accept the work described herein. Acceptance shall not constitute any waiver of the Department's rights to warranty and/or warranty maintenance.
9. MAINTENANCE
The new NSP server equipment shall be maintained under the FDOT’s Maintenance and
Software Subscription Plan with Nokia of America Corp. (FDOT Purchase Order
EP66009).
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
A-1
SHEET NO.
NSP Servers Upgrade
KEY SHEET
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx
FLORIDA DEPARTMENT OF TRANSPORTATION
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501
CONTRACT PLANS RECORD
REV.DATE DESCRIPTION REV.DATE DESCRIPTION
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
PENSACOLA
TALLAHASSEE
JACKSONVILLE
TAMPA
NAPLES
FT LAUDERDALE
MIAMI
KEY WEST
ORLANDO
LAKE
CITY
Appendix a
STATEWIDE FION NSP SERVERS UPGRADE
Intelligent transportation systems plans
NOTE: THESE PLANS ARE NOT DRAWN TO SCALE
INDEX OF PLANS
SHEET NO. SHEET DESCRIPTION
A-1 NSP SERVERS UPGRADE KEY SHEET
B-1 WILSON ROAD SITE LAYOUT
B-2 WILSON ROAD FLOOR PLAN
B-3 WILSON ROAD RACK PROFILE
B-4 WILSON ROAD DC DISTRIBUTION PANELS
C-1 MCARTHUR INTERCHANGE SITE LAYOUT
C-2 MCARTHUR DOT FLOOR PLAN
C-3 MCARTHUR DOT RACK PROFILE
C-4 MCARTHUR DOT DC DISTRIBUTION PANELS
GOVERNING STANDARDS AND SPECIFICATIONS:
FLORIDA DEPARTMENT OF TRANSPORTATION,
DESIGN STANDARDS CURRENT EDITION,
AND STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION CURRENT EDITION,
AS AMENDED BY CONTRACT DOCUMENTS. FDOT PROJECT MANAGER: KENNETH SHIVER
0 30 60 miles
LOCATIONS OF PROJECT
WILSON ROAD:
4945 WILSON RD
SANFORD, FL 32771
ASR: 1306728
COORDINATES: 28°48'02.8" N, 81°20'40.1" W
MCARTHUR INTERCHANGE:
FLORIDA TURNPIKE MP 58
5100 W. SUNRISE BLVD
FORT LAUDERDALE, FL 33313
ASR: 1049428
COORDINATES: 26°08'15.0" N, 80°13'03.0" W
ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
B-1
Wilson ROAD
SITE layout
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
WILSON RO AD
SITE NAME FINANCIAL PROJECT IDCOUNTY
SEM INOLE
\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx
FLORIDA DEPARTMENT OF TRANSPORTATION
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501
CONTRACT PLANS RECORD
REV.DATE DESCRIPTION REV.DATE DESCRIPTION
NOTE: THESE PLANS ARE NOT DRAWN TO SCALE
WILSON ROAD (DIRT)
L/A ROW
GRASS
GRASS
FENCE
ELECTRICAL
PULLBOX
ELECTRICAL PULLBOX
JUNCTION BOX
LIGHTING LOAD
CENTER
PULLBOX
FHP SPLICE
BOX
F.O.C.
CONDUIT
(FDOT D5)
FENCE
4800 WILSON ROAD
RETENTION POND
FDOT
SPLICE
BOX
BURIED 2000 GALLON LPG TANK
ROLLING
GATE
LEG A 80º
LEG B 200º
LEG C 320º
DELAND
200' & 170'
9.7º
ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
B-2
Wilson ROAD
FLOOR PLAN
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
WILSON RO AD
SITE NAME FINANCIAL PROJECT IDCOUNTY
SEM INOLE
\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx
FLORIDA DEPARTMENT OF TRANSPORTATION
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501
CONTRACT PLANS RECORD
REV.DATE DESCRIPTION REV.DATE DESCRIPTION
NOTE: THESE PLANS ARE NOT DRAWN TO SCALE
M D
P M
.D
ABSOLYTE GNB 90G15
BATTERY PLANT
A T
S
A C
A C
C U
M M
IN
S
C
N L
P G
A S
G E
N E
R A
T O
R
K W
/ 5
K V
A
-4
V D
C R
A C
K
B B
-1
N O
K
IA
R A
C K
B B
-1
F D
O T
F
IB
E
C K
B B
-1
N O
K
IA
R A
D
IO
C K
B B
-6
F U
T U
R E
H A
R R
IS
B B
-5
H A
R R
IS
B B
-8
H A
R R
IS
B B
-7
F U
T U
R E
F D
O T
B B
-3
F U
T U
R E
F D
O T
B B
-2
-4
V
C
X
P A
N S
IO
N
R A
C K
B B
-4
NSP SERVERS TO
BE INSTALLED
HERE.
ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
Secondary Distribution
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501 B-3
SHEET NO.
Wilson Road
RACK PROFILE
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SITE NAME FINANCIAL PROJECT IDCOUNTY
CONTRACT PLANS RECORD
REV.DATE
DESCRIPTION REV.DATE DESCRIPTION
SEM INOLEWILSON RO AD
-48VDC / NMS RACK
NSP-1-1 INVERTERS
NSP-1-1 SERVER
NSP-1-2 INVERTERS
NSP-1-2 SERVER
A
B
C
D
A. ICT -48V DC TO 120V AC
INVERTER SHELF #1 (TWO INVERTERS)
B. NOKIA NETWORK SERVICES
PLATFORM SERVER #1
C. ICT -48V DC TO 120V AC
INVERTER SHELF #2 (TWO INVERTERS)
D. NOKIA NETWORK SERVICES
PLATFORM SERVER #2
EXISTING FDOT EQUIPMENT
FURNISHED AND INSTALLED BY CONTRACTOR
LEGEND:
SCALE IS APPROXIMATE
0.0 ft. 0.9 ft. 1.5 ft. 3.0 ft.
WEB AUTHORIZER
SERVER
BB-4
ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501 B-4
SHEET NO.
Wilson Road
DC Distribution panels
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SITE NAME FINANCIAL PROJECT IDCOUNTY
SEM INOLE
LEGEND:
WILSON ROAD
DC DISTRIBUTION PANEL SCHEDULES
WILSON RO AD
SECONDARY DC DISTRIBUTION PANEL TOP VIEW (REAR)
A3 A2 A1A4A7 A6 A5A8A9B3 B2 B1B4B7 B6 B5B8B9
SECONDARY DC DISTRIBUTION PANEL TOP VIEW
TO INVERTERS
PRIMARY DISTRIBUTION PANEL SCHEDULE
SECONDARY DISTRIBUTION PANEL SCHEDULE
ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
C-1
McArthur INTERCHANGE
SITE Layout
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SITE NAME FINANCIAL PROJECT IDCOUNTY
BRO WARD
\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx
FLORIDA DEPARTMENT OF TRANSPORTATION
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501
CONTRACT PLANS RECORD
REV.DATE DESCRIPTION REV.DATE DESCRIPTION
NOTE: THESE PLANS ARE NOT DRAWN TO SCALE
LP
MCARTHUR
TURNPIKE SHELTER
FENCE
LODESTAR
TENANTS
CAMERA POLE
A 10º
C 250º
B 130º
POMPANO BEACH
160'
22.8º
ANDYTOWN
181' & 136'
272.1º
OKEECHOBEE
190' & 140'
212.2º
MCARTHUR DOT
SHELTER
MCARTHUR INT ERCHANGE ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
C-2
Mcarthur DOT
Floor Plan
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
MCARTHUR INT ERCHANGE
SITE NAME FINANCIAL PROJECT IDCOUNTY
BRO WARD
\\dotscoteo01\Traff ic_Ops_Data\8. TSMO\Telcom\FION\Noki a M aintenance Support \NSP Servers Upgrade\NSP Upgrade - Technicial P lans - 20231106.vsdx
FLORIDA DEPARTMENT OF TRANSPORTATION
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501
CONTRACT PLANS RECORD
REV.DATE DESCRIPTION REV.DATE DESCRIPTION
UHF RADIO
RACK
SU02
BJ-3
UHF RADIO
RACK
SU01
BJ-4
47MHZ
RACK
BJ-1
ITS WAN
RACK
BJ-6
RACK
BJ-7
CHANNEL
BANK RACK
BJ-10
TPK NOKIA
RADIO RACK
BJ-11
NEW
BATTERY
RACK 1
NEW
BATTERY
RACK 2
-48VDC
RECTIFIER
BJ-5
0 1.5 2.5 5
SCALE IS APPROXIMATE
I75.3
NOKIA
RADIO RACK
BJ-13
2'-5"
2'-8"
MDF
Tower
Light
2'-6"
NMS RACK
BJ-9
LEGEND:
NOTE:
THIS RACK MAY NOT INITIALLY EXIST IN THE INDICATED LOCATION DUE
TO THE SCHEDULE OF OTHER PROJECTS. SHOULD THIS BE THE CASE
PRIOR TO INSTALLATION OF THE NEW NSP SERVERS, THE FDOT SHALL
HAVE A RACK MADE AVAILABLE IN THE INDICATED LOCATION FOR
INSTALLATION OF THE NSP SERVERS AND DC INVERTER EQUIPMENT.
THE CONTRACTOR SHALL INSTALL THE EQUIPMENT RELATED TO THIS
SCOPE OF SERVICES AS INDICATED, UNDERSTANDING THAT THE OTHER
EQUIPMENT WILL BE INSTALLED BY OTHERS AT A LATER TIME.
NSP SERVERS TO
BE INSTALLED
HERE.
ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
TELENIUM SERVER
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501 C-3
SHEET NO.
MCARTHUR DOT
RACK PROFILE
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SITE NAME FINANCIAL PROJECT IDCOUNTY
BRO WARDMCARTHUR INT ERCHANGE
-48VDC RECTIFIER / NMS RACK
NSP-2-1 INVERTERS
NSP-2-1 SERVER
NSP-2-2 INVERTERS
NSP-2-2 SERVER
AUXILIARY SFTP/SSH
SERVER
A
B
C
LEGEND:
SCALE IS APPROXIMATE
0.0 ft. 0.9 ft. 1.5 ft. 3.0 ft.
SFTP SERVER
INVERTER
F
A. ICT -48V DC TO 120V AC
INVERTER SHELF #1 (TWO INVERTERS)
B. NOKIA NETWORK SERVICES
PLATFORM SERVER #1
C. ICT -48V DC TO 120V AC
INVERTER SHELF #2 (TWO INVERTERS)
D. NOKIA NETWORK SERVICES
PLATFORM SERVER #2
E. AUXILIARY SFTP/SSH
SERVER
F. ICT -48V DC TO 120V AC
INVERTER SHELF (ONE INVERTER) FOR SFTP
PROXY SERVER
BJ-5
ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
605 SUWANNEE ST. MS 90
TALLAHASSEE, FL 32399-0450
PH.(850)-410-5600
FAX.(850)-410-5501 C-4
SHEET NO.
McArthur DOT
DC Distribution panels
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SITE NAME FINANCIAL PROJECT IDCOUNTY
BRO WARD
LEGEND:
MCARTHUR DOT
DC DISTRIBUTION PANEL SCHEDULES
PRIMARY DISTRIBUTION PANEL SCHEDULE SECONDARY DISTRIBUTION PANEL SCHEDULE
MCARTHUR INT ERCHANGE ADDENDUM 1
SCOPE OF SERVICES FOR NOKIA NSP SERVERS UPGRADE
DOT-ITB-24-9034-SD
Exihibit A - Scope of Services
File details come from the government source that posted it. Updated .