Addendum 1.pdf
PDF 117 KB Posted
- Solicitation number
- RFB 785 2300000319 3
- Issued by
- Jessamine County, Kentucky
About this file
This Addendum 1 document issued December 13, 2022, by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, modifies Invitation to Bid No. RFB-162-23 for sanitary sewer repairs at McCracken Regional Juvenile Detention Center in Paducah, Kentucky. The addendum revises the project phasing schedule to consolidate the originally planned eight construction phases into two primary phases. Phase 1 combines the original Phases 1 through 4 and involves replacement of the entire main sewer line with the owner relocating residents from Pods 100 and 500, while the contractor provides temporary walkway support over open trenches to maintain resident access from Pods 200, 300, and 400. Phase 2 consolidates the original Phases 5 through 8 and requires replacement of main sections in the remaining areas with residents relocated from Pods 200, 300, and 400, including any work associated with Alternate 1 if accepted.
The addendum grants the contractor permission to use the outdoor recreation area as a materials laydown and storage area, subject to coordination with the owner, and requires the contractor to match existing flooring in areas where patching is necessary. No attachments are included with this addendum, and no specific pricing, timeline, or award information is detailed in this document modification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.pdf | ||
| Final_RFB_785_2300000319_1_SO_FORM.PDF | ||
| Final_RFB_785_2300000319_3_SO_FORM.PDF | ||
| Final_RFB_785_2300000319_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-162-23
FOR: SANITARY SEWER REPAIRS
MCCRACKEN REGIONAL JUVENILE DETENTION CENTER
PADUCAH, KENTUCKY
DATE: December 13, 2022
RFB-785-2300000319
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: 1.01 Refer to Section 10000 – Special Conditions, Article 4 – Project Phasing and Drawing P1.1. The Contractor shall revise the Phasing of the project to combine Phase 1, Phase 2, Phase 3, and Phase 4 into a single construction Phase 1. The Owner will relocate residents out of Pod 100 and Pod 500 to allow replacement of the entire main at one time. The Contractor shall provide temporary walkway support over open trenches in the hallway to allow residents access from Pods 200, 300, and 400 to the remainder of the building.
1.02 Refer to Section 10000 – Special Conditions, Article 4 – Project Phasing and Drawing P1.1. The Contractor shall revise the Phasing of the project to combine Phase 5, Phase 6, Phase 7, and Phase 8 into a single construction Phase 2. The Owner will relocate residents out of Pods 200, 300, and 400 to allow replacement of the main sections at one time. If Alternate 1 is accepted, it shall also be replaced within this Phase of Construction.
1.03 Refer to Section 10000 – Special Conditions, Article 6. The Contractor shall be permitted to use the outdoor recreation area as a laydown and materials storage area. The Contractor shall coordinate use with the Owner.
1.04 Refer to Drawing P1.1. The Contractor shall match the existing flooring where patching is required.
Attachments:
1. None
END OF ADDENDUM
Invitation to Bid No. RFB-162-23 For: SANITARY SEWER REPAIRS
MCCRACKEN REGIONAL JUVENILE DETENTION
CENTER
Kyla Satterly, Statewide Procurement Analyst II Division of Engineering and Contract Administration
SANITARY SEWER REPAIRS
MCCRACKEN REGIONAL JUVENILE DETENTION CENTER
MARCUM NO. 22562
ADDENDUM 1.00
DECEMBER 13, 2022
The following Addendum Items shall be made part of the Contract Documents for the referenced project.
1.01 Refer to Section 10000 – Special Conditions, Article 4 – Project Phasing and
Drawing P1.1. The Contractor shall revise the Phasing of the project to combine
Phase 1, Phase 2, Phase 3, and Phase 4 into a single construction Phase 1.
The Owner will relocate residents out of Pod 100 and Pod 500 to allow replacement of the entire main at one time. The Contractor shall provide temporary walkway support over open trenches in the hallway to allow residents access from Pods 200, 300, and 400 to the remainder of the building.
1.02 Refer to Section 10000 – Special Conditions, Article 4 – Project Phasing and
Drawing P1.1. The Contractor shall revise the Phasing of the project to combine
Phase 5, Phase 6, Phase 7, and Phase 8 into a single construction Phase 2.
The Owner will relocate residents out of Pods 200, 300, and 400 to allow replacement of the main sections at one time. If Alternate 1 is accepted, it shall also be replaced within this Phase of Construction.
1.03 Refer to Section 10000 – Special Conditions, Article 6. The Contractor shall be permitted to use the outdoor recreation area as a laydown and materials storage area. The Contractor shall coordinate use with the Owner.
1.04 Refer to Drawing P1.1. The Contractor shall match the existing flooring where patching is required.
Attachments:
1. None
END OF ADDENDUM 1.00
| Addendum 1 |
| 2022-12-13 Addendum 1 |
File details come from the government source that posted it. Updated .