Addendum 1.pdf
PDF 98 KB Posted
- Attached to
- Juliette Substation Expansion Project
- Solicitation number
- 2462A
- Issued by
- Santa Clara County, San Diego City, California
About this file
This document is an Addendum (Number 1) for the Juliette Substation Expansion project issued by the City of Santa Clara Electric Utility Department for Contract Number 2462A, dated October 15, 2025. The addendum provides additional project specification documentation, including various technical documents such as Juliette Substation SVP Design Standards, DC Battery Monitoring System specifications, geotechnical reports, existing foundation drawings, substation equipment specifications, laydown and storage area details, and supplementary materials like LED light manufacturer specification sheets and signage information.
Bidders are required to acknowledge receipt of this addendum by inserting the addendum number and date on their bid proposal, with a warning that failure to do so may result in disqualification of the bid as non-responsive. The addendum explicitly states that in case of any conflicts among drawings, specifications, and the addendum itself, the addendum shall take precedence. The document was issued by the City of Santa Clara on September 26, 2025, and is signed by Chris Karwick, the Assistant Director, indicating official authorization and transmission of the project addendum.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JULIETTE SUBSTATION EXPANSION
City of Santa Clara Electric Utility Department
Addendum Number: 1
ADDENDUM #1
Project: JULIETTE SUBSTATION EXPANSION
Invitation for Contract Number 2462A
Date: October 15, 2025
CONTRACT NO. 2462A
TO ALL BIDDERS:
The following changes, deletions, additions, and/or clarifications shall be made to the drawings and specifications for the work of the above Project:
SPECIFICATIONS:
Adding complete project specification documentation
60718386 Juliette Substation IFB_2025-09-03 Juliette Substation SVP Design Standards SDC-5617 DC Battery Monitoring System RO dis Juliette Substation Expansion Appendices Juliette Substation Expansion - Geotechnical Report
Juliette - Existing Foundation Drawings 33 99 00 General Substation Equipment-R1 Juliette Laydown and Storage Area UG1000 R6 - Released -N52 (30x60) Box 2525-35 JUL-PCB testing LED Light Manufacturer Specification Sheet Juliette - Signage
This addendum is part of the Contract Documents and in case of a conflict among drawings, specifications, and this addendum, the addendum shall govern.
Issued: 9/26/2025 1 of 2 Addendum#1
JULIETTE SUBSTATION EXPANSION CONTRACT NO. 2462A
Bidders shall acknowledge receipt of this addendum by inserting the addendum number and date and signing where indicated on the BID PROPOSAL. Failure to do so may subject bidder to disqualification based upon a non-responsive bid.
Issued by; the ity of Santa Clara
I I.
•Chris Karwick, Assistant Director
Issued: 9/26/2025
2 of 2 Addendum#1