Addendum - 1.pdf
PDF 177 KB Posted
- Attached to
- 21-136-S Hazard Fuels Management
- Solicitation number
- S-P00140-00000459
- Issued by
- Lane County, Oregon
About this file
This document is an Addendum to the solicitation for the Hazard Fuels Management project, 21-136-S, issued by the Eugene Water & Electric Board (EWEB). The addendum modifies the bidding document by changing the language in Section 1.16 regarding the method of award. Award will now be made to the lowest responsive and responsible bidder for the total of the lots selected, and EWEB reserves the right to withdraw any item(s) from award consideration. The closing date and time for bids remains unchanged. Bidders must acknowledge receipt of this addendum by signature and returning a copy with their response or by circling the addendum number on the bid form.
The related state and local contract opportunity is for Hazard Fuels Management project 21-136-S, with EWEB requesting bids from contractors. Bids are due by 2:00 PM on August 24, 2021 and will not be accepted after this date and time. The contract will be awarded to one or more bidders to provide the required services, with EWEB reserving the right to withdraw any items from the award. The project involves work in Lane County and the City of Eugene, Oregon.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum - 3.pdf | ||
| 21-136-S Hazard Fuels Managment Solicitation 1.doc.pdf | ||
| Addendum 2.pdf | ||
| 21-106-GS Seeds Seedlings and Erosion Control.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 4-21-20
August 13, 2021
ADDENDUM # 1
Hazard Fuel Management 21-136-S
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
Description of Change(s)
1. In section 1.16 of Solicitation: Language has been changed to
1.16 METHOD OF AWARD
Award shall be made to the lowest responsive and responsible bidder for the total of the lots selected for award.
Award may be made to one or more bidders. EWEB reserves the right to withdraw any item(s) from award consideration if it is in the best interest of EWEB to do so.
CLOSING DATE AND TIME
Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR BY CIRCLING THE ADDENDUM
NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Gina Dally Contract Specialist
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________ Date __________________________
End of Addendum
File details come from the government source that posted it. Updated .