Addendum 1.pdf
PDF 112 KB Posted
- Attached to
- Frisco Groundwater Well Development Study
- Solicitation number
- RFP_2025_01_13
- Issued by
- Sedgwick County, Colorado
About this file
This is Addendum No. 1 to the Request for Proposal (RFP) documents for the Frisco Groundwater Well Development Study, issued by the Town of Frisco, Colorado on January 21, 2025. The addendum modifies the original RFP to incorporate a previously completed municipal well site evaluation from 2008 by Leonard Rice Engineers (LRE), which identified five potential well sites. The updated RFP now requires proposers to review the existing 2008 study, utilize it to assist with the new well study, and add any new data obtained after 2008. The project scope involves drilling and sampling four test wells, with key dates including a proposal deadline of February 3, 2025 at 5:00 pm, proposal award on February 10, 2025, feasibility study completion by March 10, 2025, test well drilling in March and April 2025, and a test well report and preliminary design due in August 2025.
The addendum includes specific modifications to the original RFP, such as adding two new potential well site locations (Site B from the 2008 LRE Study and an existing abandoned well near 3rd Ave and Tenmile Creek), and expanding the project goals to explicitly require review and incorporation of the previous well study. The changes are anticipated to reduce efforts required for the Phase 1 study and potentially accelerate the project schedule. An additional attachment, Exhibit C - 2008 Leonard Rice Engineers Municipal Well Site Evaluation, will be included with the RFP documents to provide background information for proposers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum to RFP Documents Frisco Groundwater Well Development Study January 21, 2025
Addendum No. 1
This addendum summarizes additions and/or changes made to the RFP documents.
Description: It was discovered recently that a previous well study was completed by the Town in 2008. The changes below are made to incorporate the discovery of the previous well study. The existing well study is anticipated to reduce the efforts required for the Phase 1 study portion of the project and accelerate the schedule.
The following additions and/or changes to the RFP documents for the Frisco Groundwater Well Development Study shall be made:
Section/Sheet Modification
2. Background (Pg 3)
Add the following after the third paragraph of Section 2 “In 2008, the Town of Frisco worked with Leonard Rice Engineers (LRE) on a municipal well site evaluation. The evaluation identified five potential well sites and recommended a test drilling and sampling program at these five sites. The Town of Frisco did not proceed with the recommended drilling and sampling program.”
2. Background (Pg 3)
Add the following to bulleted list of locations at the end of Section 2:
• Site B as shown on the 2008 LRE Study
• Existing abandoned well near 3rd Ave and Tenmile Creek
3. Project Goals & Scope of Work (Pg 4)
Under Item 3 of Scope of Work, add the following item to the list:
• Review the existing 2008 municipal well site evaluation. Utilize the existing evaluation to assist with the new well study. Add to the existing study with any new data obtained after 2008.
Reference the existing study and confirm its findings or make alternative recommendations. The existing study may be incorporated or attached to the updated study.
3. Project Goals & Scope of Work (Pg 5)
Under Item 4 of Scope of Work, add the following:
“Proposers shall assume that four test wells shall be drilled and sampled.”
4. Schedule (Pg 5)
Delete the schedule in Section 4 in its entirety and replace with the following:
• Advertisement of RFP January 13, 2025
• Questions Due January 23, 2025
• Proposal Deadline February 3, 2025, 5:00 pm
• Proposal Award February 10, 2025
• Feasibility Study March 10, 2025
• Test Well Drilling March & April 2025
• Test Well Report & Preliminary Design August 2025
10. Attachments (Pg 8)
Add the following “Exhibit C - 2008 Leonard Rice Engineers Municipal Well Site Evaluation”