Addendum_1.pdf
PDF 5 MB Posted
- Solicitation number
- 0000033003
- Issued by
- Los Angeles County, California
About this file
This document is an Addendum related to an Invitation for Bids for a state and local contract opportunity between the California Department of General Services Real Estate Services Division and the Department of State Hospitals for the Central Utility Plant Interconnect at the Metropolitan State Hospital in Norwalk, Los Angeles County, California (Project No. 13292).
The key details include the change in the bid due date from November 14, 2024 to November 21, 2024, and the bid opening date from November 15, 2024 to November 22, 2024. The scope of work involves the demolition of the existing 66kV outdoor substation and 12kV switchgear, and the installation of new 5kV switchgear, utility metering, battery, and other electrical equipment. The contractor must also provide a schedule for shutdowns that minimizes impacts to the hospital's operations. The project is a readvertisement of a previous project that did not receive any bids. The required contractor's license is a C-10 or B, and there are requirements for Disabled Veteran Business Enterprise (DVBE) participation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFBI_4.pdf | ||
| 13292_-_RFBI_2.pdf | ||
| RFBI_3.pdf | ||
| 13292_-_Pre_Bid_Sign_In_Sheets.pdf | ||
| RFBI_5.pdf | ||
| 13292_-_Bid_Package_R3.pdf | ||
| 13292_-_Approved_Drawings_with_Issue_Date_R3.pdf | ||
| 13292_-_Project_Manual_Book_I.R3.pdf | ||
| 13292_-_RFBI_1.pdf | ||
| 13292_-_Project_Manual_Book_II_R3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
RESDMSTR: 12/23/2021 00 91 13 - 1 of 2 000000000013292
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
Date: November 8, 2024 DOCUMENT 00 91 13
ADDENDUM No. 1 TO THE CONTRACT DOCUMENTS
New Bid Due Date - November 21, 2024
CENTRAL UTILITY PLANT INTERCONNECT DSH – METROPOLITAN
DEPARTMENT OF STATE HOSPITALS
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVE NORWALK, LOS ANGELES COUNTY, CALIFORNIA
PROJECT NO. 000000000013292
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM ON BID FORM AND
REVISE THE CONTRACT DOCUMENTS AS FOLLOWS:
BIDDING REQUIREMENTS
1. DOCUMENT 00 11 00 - INVITATION TO BID
A. DELETE DOCUMENT 00 11 00 INVITATION TO BID AND
ADD DOCUMENT 00 11 00 Addendum 1 dated November 08, 2024 making the following changes:
CHANGE bid due date from November 14, 2024 to November 21, 2024.
CHANGE bid opening date from November 15, 2024 to November 22, 2024.
2. DOCUMENT 00 41 00 – BID FORM
A. CHANGE bid due date from November 14, 2024 to November 21, 2024.
Revised Bid Forms will not be issued to Bidders. Bidders shall change date on originally issued
Bid Forms.
DRAWINGS
ADD the following attached Addendum No. 1 Drawing Sheets, dated 11-08-24; showing revised minor scope changes.
1. SHEET T 1.0
ADD HCAI OSP NUMBBER AND HCAI/OSHPD LEVEL 5
DELETE The existing 66kV outdoor substation including all ancillaries.
ADDENDUM NO. 1
RESDMSTR: 12/23/2021 00 91 13 - 2 of 2 000000000013292
2. SHEETS T4.0
A. Updated scale.
B. Relocated manhole location.
3. SHEET E1.0
A. Overhead lines of 66kV and 12kV including poles are no longer part of this project.
It will be responsibility of SCE to demolish in separate contract.
B. Relocated manhole location
4. SHEET E1.1
DELETE Note: See E4.0, Detail 6
5. SHEET E1.2
B. Revised underground layout.
6. SHEET E1.3
B. Revised underground routing.
7. SHEETS E2.0
A. Relocated manhole location.
8. SHEET E4.0
DELETE Detail #5: 66kV/12kV Poles to be demolished by Southern California Edison DELETE Detail #5: 66kV Substation to be demolished by Southern California Edison
END OF ADDENDUM NO. 1
ATTACHMENTS:
Document 00 11 00, Invitation for Bids, pages 1 through 4.
Addendum No. 1 Drawing Sheets: T1.0, T4.0, E1.0, E1.1, E1.2, E1.3, E2.0, E4.0
INVITATION FOR BIDS
00 11 00 - 1
Addendum No. 1 – November 8, 2024
RESDMSTR: 05/01/2024 000000000013292
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
DOCUMENT 00 11 00
INVITATION FOR BIDS
SEALED BIDS: DGS will receive sealed bids at 707 Third Street, West Sacramento, California 95605, before 2:00 P.M., November 21, 2024. Bids received after this date/time will not be considered received on time.
A public bid opening will be held on November 22, 2024 at 2:00 P.M. at 707 Third Street, 5th floor reception area, West Sacramento, CA 95605. If bidders choose to attend the bid opening, to maintain proper social distancing, the bid opening may be held in the atrium. At the public bid opening, all bids received before 2:00 P.M., November 21, 2024 will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be made available immediately after the bid opening is completed and it will be emailed to invited bidders.
The bid opening may be attended virtually via the following link:
Teams Meeting Link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzNlNTk5MTQtNDZmZC00NmQ2LTg2NTQtNTA5YzNmNjM5Yjlk%40thread.v2/0 ?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5- 37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d Teams Meeting ID: 267 375 199 918 Teams Passcode: DDNSVu
HAND DELIVERED BIDS: Shall be placed in the DGS/OBAS Bid/Proposal Drop Box located in the lobby at 707 3rd Street in West Sacramento. The Drop Box will be opened at 2:00 p.m. Tuesday through Thursday and bids/proposals in the box will be certified as being received before 2:00 p.m.
that day.
If mailing bids, ensure the outside of the mailing reads:
ATTENTION: HECTOR CAVAZOS
CENTRAL UTILITY PLANT INTERCONNECT DSH – METROPOLITAN
METROPOLITAN STATE HOSPITAL
NORWALK, LOS ANGELES COUNTY, CALIFORNIA
DO NOT OPEN
DEPARTMENT OF GENERAL SERVICES
OFFICE OF BUSINESS AND ACQUISTION SERVICES
707 3RD STREET, MS 508, WEST SACRAMENTO, CA 95605
The bids shall include all Work pursuant to the Drawings and Project Manual, and Addenda as may be issued prior to bid opening date.
Scope of Work: Major components of Project Work consist of demolition of existing 66kv outdoor substation including all ancillaries and the 12kv switchgear inside the co-generation plant. Provide new 5kv switchgear (with provision for future automation and controls) and utility metering section. Provide battery, battery charger, enclosure, and battery calculation. Provide from spare circuit breaker of new switchgear temporary power supply to feed the existing “MCC-A” located in Co-Gen Building while the new feed is in construction. Provide new equipment pad for Southern California Edison equipment and new 5kv switchgear equipment, including underground conduit. Demolish the existing Transformer “A” https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzNlNTk5MTQtNDZmZC00NmQ2LTg2NTQtNTA5YzNmNjM5Yjlk%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzNlNTk5MTQtNDZmZC00NmQ2LTg2NTQtNTA5YzNmNjM5Yjlk%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzNlNTk5MTQtNDZmZC00NmQ2LTg2NTQtNTA5YzNmNjM5Yjlk%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzNlNTk5MTQtNDZmZC00NmQ2LTg2NTQtNTA5YzNmNjM5Yjlk%40thread.v2/0?context=%7b%22Tid%22%3a%22ea45f7b1-07d7-49a8-b8f5-37136ec9382d%22%2c%22Oid%22%3a%223b64f837-4256-46bc-9349-e8174cd968a7%22%7d
00 11 00 - 2 located outdoor and intercept the pathway and provide new 5kv conductor to re-feed the existing 5kv “MCC-A”. Provide methods and schedule of shutdown to DSH – Metropolitan State Hospital (MSH) for approval. The schedule of shutdown shall have minimal impact to the operation of the facility.
Readvertisement: This is a readvertisement of a Project for which no bids were opened on September 6, 2024 and no contract was awarded. No revisions were made to scope of original work and Drawings and Project Manual, including Addenda, remain same as originally issued with exception of new bid opening date. New Bid Forms will be posted to the Event Details in the Cal eProcure website.
License: Contractors' State License Classification required to bid Project is C-10 or B.
Certificate of Reported Compliance (CRC) – Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract.
More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation
Generative Artificial Intelligence (GenAI) Disclosure: The State of California seeks to realize the potential benefits of Generative Artificial Intelligence through the development and deployment of GenAI tools, while balancing the risks of these new technologies. Bidders must notify the State in writing if their solution or service includes, or makes available, any GenAI technology, including GenAI from third parties or subcontractors. The State has developed a form STD 1000 GenAI Disclosure & Factsheet to be completed by the Bidder. Failure to disclose GenAI to the State and submit the form STD 1000 GenAI Disclosure & Factsheet will result in disqualification of the Bidder and may void any resulting contract. The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure. Upon receipt of a Bidder GenAI Disclosure & Factsheet, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids that present an unacceptable level of risk to the State.
Generative Artificial Intelligence (GenAI) Disclosure & Factsheet (STD 1000) can be viewed and downloaded at the following internet site: https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf
Completed form STD 1000 Generative Artificial Intelligence (GenAI) Disclosure & Factsheet must be included in the bid submission, as part of Project Manual Document 00 41 00 “Bid Form”. If the GenAI Disclosure & Factsheet is not submitted by the bidder, the bid shall be deemed nonresponsive.
DOJ Custodian of Record (COR) Requirement: As a condition of Contract award, at the time of Contract award Contractor is required to furnish to State evidence that the Contractor’s organization has a Department of Justice (DOJ)-confirmed Custodian of Records (COR) for background checks.
Alternatively, at the time of award the Contractor may furnish to State evidence or proof of mailing (via USPS Registered Mail or tracking information) that Contractor submitted an application for processing to DOJ to obtain a COR in accordance with DOJ requirements.
For bidders without a DOJ-Confirmed Custodian of Record at the time of Contract award but who provide evidence of a submitted application at the time of Contract award, an allowance of 30 calendar days from NTP shall be included in the baseline schedule for processing of the Contractor’s Custodian of Record and completion of onsite construction staff background checks (FBI and/or DOJ). State shall not be responsible for any Contractor costs caused by any delays in establishing a Custodian of Record.
Information regarding Custodian of Records program is available at https://oag.ca.gov/fingerprints/custodian https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf https://oag.ca.gov/fingerprints/custodian
00 11 00 - 3
Availability of Funds: Award of this contract is subject to the availability of funds through the State’s normal budget process and/or transfer of funds to the Department of General Services through the Architecture Revolving Fund.
Pre-bid Site Inspection: Bids will only be accepted from those Contractors having attended the MANDATORY pre-bid site inspection tour on October 16, 2024, at 10:00 A.M, at which time representatives of the State and prospective bidders shall meet at Metropolitan State Hospital, 11401 Bloomfield Ave. Norwalk, CA. 90650, at area of work (East of Balsam St. and Fifth St. intersection). The State’s requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered.
Attendance for the entire inspection is required in order for new bidders to be eligible to submit a bid. Previous potential bidders who attended the two previous pre-bid walks and who provide proof of attendance are not required to attend this October 16, 2024 pre-bid walk in order to bid.
Executive Order N-6-22: The Bidder must be advised of Executive Order N-6-22 Russia Sanctions. On March 4, 2022, Governor Gavin Newsom issued Executive Order (EO) N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, Bidder represents that it is not a target of Economic Sanctions. Should the State determine Bidder is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Bidder’s bid any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
Drawings and Project Manual: Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov/. Click on “Start Search.” In the Event name field, enter the project number and click search. While viewing the Event Details, click on “View Event Package” to view bid forms.
It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation.
Drawings and Project Manual may also be viewed through Builders' Exchanges.
Bid: Submit on lump sum basis with Allowances as set forth in Bid Forms.
DVBE: Participation in Disabled Veterans Business Enterprises (DVBE) program may be required for this project. Refer to Project Manual Document 00 21 00, Project Manual Document 00 22 10 and Bid Forms for requirements. Bidders are advised to commence the required DVBE procedures immediately upon receipt of drawings and project manual.
DVBE Bid Incentive: The DVBE Incentive program is being applied on this project. Refer to Project Manual Document 00 21 00, Article 18.5.
Small Business Preference: Refer to Project Manual Document 00 21 00, Article 5.5
Non-Small Business Subcontractor Preference: Refer to Project Manual Document 00 21 00, Article 5.6 http://www.caleprocure.ca.gov/ https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx
00 11 00 - 4
Bonds: Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.
Non-Discrimination Program (Gov. Code, Section 12990): Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.
Labor Code: Pursuant to Labor Code, Section 1774, the Contractor to whom the contract is awarded, and any subcontractor under him, shall pay not less than the specified general prevailing rates of per diem to all workers employed in the execution of the contract. Pursuant to Labor Code, Section 1770 et seq., the Department of Industrial Relations (DIR) has ascertained general prevailing rate of per diem wages in the locality in which the work is to be performed. Copies of the general prevailing rate of per diem wages are available from the Department of Industrial Relations, Labor Statistics & Research Division, P.O. Box 420603, San Francisco, CA 94142, (415) 703-4780; or general prevailing rate of per diem may be accessed on the internet at Department of Industrial Relations website (https://www.dir.ca.gov) for the August 2024 published general prevailing rate of per diem wages for this contract. Copies of the general prevailing rate of per diem wages are on file at DGS’ principal office, which shall be made available to any interested party on request. Note that when the general prevailing rate of per diem determination shows an expiration date (noted by a double asterisk**), to expire during the term of the contract, the Contractor must call or write the DIR to obtain the new rates and incorporate them in this contract for submittal of bid. The Contractor is responsible to comply with the Labor Code Sections and general prevailing rate of per diem determinations, including all the guidelines and the fine print in the general prevailing rate of per diem determinations. Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.
Labor Compliance Monitoring and Enforcement: This project is subject to monitoring and enforcement by the Department of Industrial Relations (DIR), Compliance Monitoring Unit. All Contractors and subcontractors, regardless of tier, shall be required to comply with the Monitoring and Enforcement Program, including, but not limited to, contractor registration, submittal of electronic certified payroll reports directly to the DIR as applicable and cooperation with on-site monitoring by DIR personnel. Refer to Labor Code 1771.4 et seq. and the General Conditions of the Contract for Construction, Document 00 72 00, Article 3.3.3 for more information.
END OF DOCUMENT
https://www.dir.ca.gov/
11401 BLOOMFIELD AVENUE, NORWALK, CALIFORNIA 90650
PROJECT ADDRESS :
PREPARED FOR:
DEPARTMENT OF STATE HOSPITALS
DEMOLISH 12KV SWITCHGEAR INSIDE THE CO-GENERATION PLANT.
PROVIDE NEW 5KV SWITCHGEAR AND UTILITY METERING SECTION. NEW 5KV
SWITCHGEAR SHALL HAVE PROVISION FOR FUTURE AUTOMATION AND CONTROLS.
PROVIDE BATTERY, BATTERY CHARGER, ENCLOSURE, AND BATTERY
CALCULATION.
PROVIDE FROM SPARE CIRCUIT BREAKER OF NEW SWITCHGEAR TEMPORARY
POWER SUPPLY TO FEED THE EXISTING "MCC-A" LOCATED IN CO-GEN BUILDING
WHILE THE NEW FEED IS ON CONSTRUCTION.
PROVIDE EQUIPMENT PAD FOR SCE EQUIPMENT AND NEW 5KV SWITCHGEAR
EQUIPMENT, AND UNDERGROUND CONDUIT.
DEMOLISH THE EXISTING TRANSFORMER "A" LOCATED OUTDOOR AND INTERCEPT
THE EXISTING PATHWAY AND PROVIDE NEW 5KV CONDUCTOR TO RE-FEED THE
EXISTING 5KV "MCC-A".
PROVIDE METHODS AND SCHEDULE OF SHUTDOWN TO DSH- METROPOLITAN
STATE HOSPITAL (MSH) FOR APPROVAL. THE SCHEDULE OF SHUTDOWN SHALL
HAVE MINIMAL IMPACT TO THE OPERATION OF THE FACILITY.
1. 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, TITLE 24 C.C.R.
2. 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
3. 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
4. 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
5. 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
6. 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
7. 2022 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R.
8. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11,
TITLE 24 C.C.R.
9. 2022 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R.
10. TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS.
11. HCAI/OSHPD LEVEL 5 - ACUTE PSYCHIATRIC HOSPITAL
N N
NOT TO SCALEN NOT TO SCALE
NOT TO SCALE
Imperial Hwy
NORWALK
Bloom field Ave
Norwalk Blvd
Telegraph Rd.
Studebaker Rd
Florence Ave. Telegraph Rd.
Rosecrans Ave.
SANTA ANA FW
Y N
Pioneer Blvd
G reenstone Ave
Firestone Blvd
NORWALK
STA FE
SPRING
WHITTIERBELL
DOWNEY
BELLFLOWER
GARDENS
PROJECT
LOCATION
PROJECT
LOCATION
SCOPE OF WORKAPPLICABLE CODES
SITE MAP
PROJECT INFORMATION
LOCATION MAP VICINITY MAP
DSH - METROPOLITAN
CUP INTERCONNECT - CENTRAL PLANT
PROJECT LOCATION
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
T1
C O
VE
R
S H
EE
T
- C
EN
TR
AL
P
LA
N T
- 2
4-
-0 8.
dw g
D
AT
E/
TI
M E:
N ov
4, 3:
PM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
PROJECT SUMMARY
THE PROJECT CONSISTS OF THE INSTALLATION OF AN ELECTRICAL INTERCONNECT
TO PROVIDE POWER TO CENTRAL UTILITY PLANT (CUP). THE CUP CURRENTLY
UTILIZES A 66KV SUPPLY FROM SOUTHERN CALIFORNIA EDISON. DSH RECENTLY
ACQUIRED THE CUP FROM PREVIOUS LEASE AND IS OPERATING THE CUP ON A
LIMITED BASIS. DSH-METROPOLITAN DOES NOT PLAN TO GENERATING ELECTRICITY
NOR SEND POWER TO THE GRID, THERE IS NO LONGER ANY NEED FOR THE 66KV
SUPPLY NOR SOUTHERN CALIFORNIA EDISON SIGGEN SUBSTATION.
DEPARTMENT OF STATE HOSPITALS
11401 South Bloomfield Avenue Norwalk, California 90650
JOSHUA KAISER
Chief Construction Officer
(916) 248-0015 Email: joshua.kaiser@dsh.ca.gov.
BRIAN HUDSON
DSH Overall CM Lead
(682) 777-0906 Email: Brian.Hudson@dsh.ca.gov.
ALEX VAN ELDEN
(949) 391-5066 Email: Alexander.VanElden@dsh.ca.gov.
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE, NORWALK,
CALIFORNIA 90650 LOS ANGELES COUNTY
TITLE SHEET,
APPLICABLE CODES
AND SCOPE OF WORK
T1.0
OSFM PERMIT#: 23-6278
HCAI COMPLIANCE
NEW EQUIPMENT SHALL COMPLY WITH HCAI REQUIREMENT.
METAL CLAD SWITCHGEAR OSP-0046
METAL ENCLOSED SWITCHGEAR OSP-0037
BATTERY CHARGER OSP-0131
BATTERY RACK OSP-0264
PANG HER
Assoc. Construction Analyst
(916) 915-8293 Email: Pang.Her@dsh.ca.gov.
PAUL SMITH
Chief of Plant Operations
(562) 651-4376 EXT. 8094
Cell: (562) 292-4755 Email: Paul.Smith@dsh.ca.gov.
NATALIE GARCIA
Assistant Hospital Administrator
(562) 521-1417 Main Office: (562) 651-4376 Email: Natalie.Garcia@dsh.ca.gov.
J.C. Chang & Associates, Inc. Engineers, Architects and Planners 385 Van Ness Way, Suite 208 Torrance, California 90501
(310) 212-7644
PREPARED BY:
(REFER TO OSFM PERMIT#: 24-0864 FOR SWITCHGEAR BUILDING)
1 11/08/24 ADDENDUM #1
l l
EXISTING CONCRETE SLAB OVER
UNDERGROUND #2 FUEL OIL
STORAGE TANK
TRANSFORMER
PIPE
BRIDGE
(E) MANHOLE "MHAA"
(E) CHW SUPPLY AND RETURN
PIPING AND FUEL PIPE
BOLLARD
(TYP)
(E)TUNNEL EXHAUST FAN TO REMAIN
30' TYP.4.7
4.4
101F
102F
107J-A
107J-B
6J
-A
DRAINAGE
SUMP WITH
PUMP
104L A&B
104LJ2 A&B 104LJ1 A&B
112J
104F 103F
109-J
105F
105F
ADMINISTRATION,
MAINTENANCE, &
CONTROL ROOM
BLOCK
106L-B
106L-A
LUBE OIL
COOLER
6J
-B
HYDRAULIC
STARTER
SKID
110J A&B
110JD1
110JL1
TURBINE
LUBE OIL
COOLER
SKID
101L
120J-A
120J-B
119J-A 119J-B
101D
111L-C
CHILLER
WASTER WATER CLARIFIER
101J-A&B
101JD1
101JD2
111L-A
MOTOR
111L-B
MOTOR CHILLER SHELL
103J
105J-B
105J-ALUBE OIL
CONSOLE
SPACE RESERVED FOR SWITCHGEAR
101L
FLUE GAS
ANALYZER PANEL
EJECTOR, GLAND CONDENSER,
EXTRACTION VALVE PLATFORM
OIL
RETURN
101LD3
101LD2
101LD1
102D 104J-B
104J-A
105LJ1
105LF1
105LJ2
105LF2
105LJ3
105LF3
101C
BALSAM STREET
30' TYP.
' T
YP
. 1
' T
YP
105'-7"
32'-9"
35'
'-9
'-1
32'-3"
FUTURE
ABOVEGROUND
TANK
FUEL
POLISHER
FUTURE
DAYTANK
FUTURE
2,500KW
FUTURE
NGR NGR
FUTURE SWITCHGEAR
WITH MASTER
CONTROLLER
FUTURE GENERATOR
AREA NOT PART OF THIS
CONTRACT
BOLLARD
(TYP)
SCALE
CUP BUILDING CODE ANALYSES FLOOR PLAN
TRUE
NORTH
PLAN
NORTH1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
T4
C O
-G
EN
B U
IL
D
IN
G
C O
D E
AN
AL
YS
IS
.d w g D
AT
E/
TI
M
E:
N ov
4, 1:
AM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
CODE ANALYSES CUP BUILDING:
EXISTING BUILDING TYPE: II-B (8" CMU BLOCK WALLS WITH STEEL DECK/ROOF)
OCCUPANCY: F-1 OCCUPANCY
HEIGHT: EXISTING 46' AFG
SPRINKLERED: YES
NUMBER OF STORIES: 1
AREA: F-1 OCC = 19,147 SF (1ST LEVEL)
AREA: B OCC = 2,260 SF (2ND LEVEL)
PER CHAPTER 5 CBC
II-B/F-1 OCC SPRINKLERED 62,000 SF ALLOWED > 19,147 SF OK
II-B/F-1 OCC SPRINKLERED 92,000 SF ALLOWED > 2,260 SF OK
II-B/B AND F-1 OCC SPRINKLERED 3 STORIES (75 FEET) ALLOWED > 1 STORY (46 FEET) OK
PER CHAPTER 6 CBC
II-B BEARING WALL: 0 RATING REQUIRED = OK
II-B INTERIOR WALLS AND, ROOF 0 RATING REQUIRED = OK
II-B/F-1 OCCUPANCY DISTANCE TO FIRE SEPARATION BETWEEN 10 FEET AND
30 FEET = 0 RATING = OK
1. CLOSEST IMAGINARY PL IS 15 FT.
CODE ANALYSES CONT:
PER CHAPTER 10 CBC
FUNCTION OF SPACE: MECH/ELECTRICAL ROOM OL = 78
1. OCCUPANCY F-1 = 19147/300 = 63 PER PLAN. B OCCUPANCY = 2260/150 = 15 OCC
2. 63 > 49 OCC. TWO EXIT DOOR REQUIRED WITH PANIC HARDWARE (5 DOORS PROVIDED)
3. 15 OCC < 49 HOWEVER, OFFICE ON 2ND FLOOR THEREFORE TWO EXITS REQUIRED (2 EXITS PROVIDED)
4. F-1 OCC W/ SPRINKLER SYSTEM MAX.100 FT TO EXIT ACCESS. EXIT ACCESS < 250 FT = OK
5. B OCC W/ SPRINKLER SYSTEM 30 FT TO EXIT ACCESS. EXIT ACCESS < 300 FT = OK.
FIRE SEPERATION DISTANCE LINE
CODE ANALYSIS NOTES:
30 FEET FIRE SEPARATION DISTANCE UNLESS NOTED
OTHERWISE.
IM
P
E R
IA
L
H W
Y
BLOOMFIELD AVENUEBLOOMFIELD AVENUE
10,274 10,274
9,0009,000
9,371 9,371
2,695 2,439
10,501
8,200
7,933
8,977
8,977
7,933
8,200
10,501
10,501
8,200
7,933
8,97710,501
8,200
7,933
8,977
17,235
17,235 17,235
17,235
NORWALK BOULEVARD
80 Stalls
St al ls
18 Stalls
58 Stalls
S ta lls
S ta lls
101102
408/416
406/414
402/410
417 419
418 420
CTW
BLDG.
A
A
BLDG.
S.N.F.
404/412
KEY PLAN
SCALE:N.T.S.
EXIT PATH < 250'
NOTE:
THIS IS SHOWN FOR REFERENCE ONLY. NO
CHANGE IS PROPOSED FOR BUILDING LOCATION OR
EXISTING FIRE SEPARATION DISTANCE.
LEGEND:
CUP BUILDING
CODE ANALYSES
FLOOR PLAN
T4.0
0 5 10 15 FEET 30
1" = 15'
OH OH OH OH OH OH
OH
O H
66KV 66KV 66KV 66KV 66KV 66KV
12KV
66KV
12KV
12KV
TO BE DEMOLISHED BY SOUTHERN CALIFORNIA
EDISON (SCE) INCLUDING POLES.
(E) 12KV OVERHEAD LINE
TO REMAIN
(D)66KV POLE
O H
OH
O H
OH
O H
O H
OH
IM
P
E R
IA
L
H W
Y
BLOOMFIELD AVENUEBLOOMFIELD AVENUE
COGENERATIONCO-GEN.
TRANSPORTATIONTRANS.
VOCATIONAL REHABILITATION
HOUSEKEEPING
ADMINISTRATION
OFFICE OF STATE ARCHITECT
GARAGE
RESIDENCE NUMBER
EMPLOYEE
BUILDING
OCCUPATIONAL THERAPY
WAREHOUSE
SHELTER
VOC. REHAB.
HSEKP.
ADMIN.
OSA
G R#
EMP.
BLDG.
O.T.
W S
ABBREVIATIONS & SYMBOLS
PATIENT SUPPORT MODULESP.S.M.
10,274 10,274
9,0009,000
9,371 9,371
2,695 2,439
10,501
8,200
7,933
8,977
8,977
7,933
8,200
10,501
10,501
8,200
7,933
8,97710,501
8,200
7,933
8,977
17,235
17,235 17,235
17,235
(Lower)
WATER TANKS
IRRIGATION PUMP HOUSE
WATER SOFTENER BUILDING DOMESTIC PUMP HOUSE
DEVICE
BACKFLOW
COMMINUTOR
BUILDING
CTE CHILLER
P.S.M.
COURT
TENNIS
DOM.IRR.
M
ET
AL
PRO
PERTY LIN
E
PR
O
PE
RT
Y
LI
N E
PROPERTY LINE
FD. SERV. WHSE.
LUMBER SHED
GAS PUMP
EN
GI
N.
S
SS
S
S
S
DC
U
TRANS.
GA
RA
GE
PLUMBER
OFFICES
PLANT OP'S.
RECEIVING
STORES /
CAR PORT
CARPENTER
PA
IN
T
MASON
ST
OR
SH
EE
T
EL
EC
T.
W
EL
D.
O .T
O .T
O.T. SOUTH
O.T. NORTH
EM
P.
B
LD
G.
EMP. BLDG. 3
RE
CY
CL
IN
G
S
S
G
#18
G
#19
#16
G
#14
#13
313/315
G
G
EM
P.
B
LD
G.
EMP. BLDG. 1
#1
#15S
LA
UN
DR
Y
KITCHEN
OFFICE
TRUST
S
201/203
2/2
5/2
0/2
9/2
3/2
STORAGE
CHILL WATERBARBER/
W3
COOLING TOWER
#6
#8#7
HSEKP.WHSE 1
PROPERTY
HALL
JAMES
306-308
HOUSE
BOILER
E1
309-311 (CPS)
W2NORTH YARD
PCB SHED
HOMES
#10
G
G
G
#11
#12
#20
PUMP HOUSE
(ABANDONED)
CO
ND
OM
IN
IU
M
CO
M
PL
EX
FASHION CNT.
STORAGE
PROPERTY LINE
PROPERTY LINE
PR
O
PE
RT
Y
LI
N E
PROPERTY LINE
PR
O
PE
RT
Y
LI
N E
OASIS
P.S.M.
#17
VOLLEYBALL
BASKETBALL
GR
AS
S
AR
EA
SALLYPORT
VISITOR CENTER
ADMIN.
CLINICAL
BLDG.
CE
NT
ER
STUDIO
ART
WAREHOUSE
REHAB.
HOMES
HOMES
CENTER
305/307
BIRCH GROVE
CEDAR STREET
ELM STREET
POST
WELLNESS
GR
ND
LOCK
WASH.
WAREHOUSE
KITCHEN
CENTRAL
(Omitted)
CLINIC
D-57 (Upper)
BEAUTY SHOP
CE
NT
ER
FA
SH
IO
N
FSHN. CNT.
STORE
RELIGIOUS
CENTER
NORWALK BOULEVARD
80 Stalls
St al ls
18 Stalls
58 Stalls
S ta lls
S ta lls
#5
BUILDING
CO-GEN.
S.N.F.
TRAILER
101102
HOSP.
OFFICE
POLICE
407/415
405/413
CTE
BLDG.
401/409
408/416
406/414
402/410
417 419
418 420
YOUTH
ADMINISTRATION
BUILDING
CTW
BLDG.
A
A
A
BLDG.
S.N.F.
TRUST
OFFICE
BLDG.
LIBRARY
404/412
403/411
6/
P.S.M.
(D)12KV POLE
OVERALL ELECTRICAL SITE PLAN
TRUE
NORTH
PLAN
NORTH1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
E1
O
VE
R
AL
L
SI
TE
P
LA
N
-1
1-
.d w g D
AT
E/
TI
M
E:
N ov
4, 3:
PM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
KEYNOTES:
SEE E1.1, E1.2, & E1.3 FOR BUILDING & SUBSTATION LAYOUT SCOPE
OF WORK.
OVERALL
ELECTRICAL
SITE PLAN
E1.0
SCALE: 0 40020 FEET200
1" = 200'
1 11/08/24 ADDENDUM #1
TR-A
66/12KV ELECTRICAL SUBSTATION
TO BE DEMOLISHED BY SOUTHERN
CALIFORNIA EDISON (SCE)
(E)
COGENERATION
BUILDING
TRANSFORMER
PIPE
BRIDGE
BALSAM STREET
(E) UNDERGROUND
CONDUIT BETWEEN
12KV SWITCHGEAR
AND OUTDOOR
SUB-STATION
PROTECT (E)GROUND
OF TRANSFORMER "A"
FOR FUTURE USE
(E) UNDERGROUND
GROUNDING
(E) CHW SUPPLY AND RETURN
PIPING AND FUEL PIPE
UNDERGROUND
TUNNEL
(D)SCE TRANSFORMER
(E) SS
(D)BUILDING
(ELECTRIC
GEAR)
EXISTING CONCRETE SLAB
OVER UNDERGROUND #2 FUEL
OIL STORAGE TANK
(E) MANHOLE "MHAA"
(E)12KV OVERHEAD LINE
(D)12KV POLE WITH AIR
BREAK SWITCH, REFER
TO SCE DRAWING
(D)SCE PAD-MOUNTED
GEAR, PMU-5
(E) HV2-1, HV1-1, HV3-1, HV4-1
(E) HV1-15, CK-2, HV2-2, HV1-2,
HV3-2, HV4-2
(E) CK-3, F4-2
(E)CK-1 AND FUTURE CONDUITS
PROTECT IN PLACE
(E)
MANHOLE
"MHA"
(E)CUP 200KW EMERGENCY
GENERATOR LOCATION
(E)A/G PULLBOX2
TR-3TR-2
(E)GROUNDING
CONNECTION NOT
VERIFIED (TYP)
SCALE
ELECTRICAL SITE PLAN - DEMOLITION PLAN
TRUE
NORTH
PLAN
NORTH1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
E1
EL
EC
TR
IC
AL
S
IT
E
PL
AN
-1
1-
.d w g D
AT
E/
TI
M
E:
N ov
4, 3:
PM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
SEE ENLARGED PLAN ON
SHEET E2.0 DETAIL 1 & 2
COORDINATE WITH SCE FOR THE DEMOLITION OF EXISTING GUY.
COORDINATE WITH SCE FOR THE DEMOLITION OF (E) SCE
EQUIPMENT. REFER TO SCE DRAWING. PROVIDE COVER PLATE
ON THE OPENINGS AFTER THE REMOVAL OF EQUIPMENT.
DEMOLISHED EXISTING SWITCHGEAR BUILDING INCLUDING THE
ABANDONED SWITCHGEAR EQUIPMENT.
(E)MV PULLBOX TO PROTECT AND REMAIN IN PLACE.
DEMO WORK KEYNOTES:
ELECTRICAL
SITE PLAN
DEMOTION PLAN
E1.1
1 11/08/24 ADDENDUM #1
0 5 10 15 FEET 30
1" = 15' l
(E) SS
EXISTING CONCRETE SLAB OVER
UNDERGROUND #2 FUEL OIL
STORAGE TANK
BALSAM STREET
G
(E) MANHOLE "MHAA"
12KV OVERHEAD LINE
(E)UNDERGROUND CONDUIT
BETWEEN 12KV SWITCHGEAR
AND OUTDOOR SUB-STATION
(E) UNDERGROUND CONDUIT(E) HV1-15, CK-2, HV2-2, HV1-2, HV3-2, HV4-2
(E) CK-3, F4-2
(E)CK-1 AND SPARE CONDUITS.
ROUTING ARE NOT VERIFIED.
(E)MANHOLE "MHA"
(E) CHW SUPPLY AND RETURN
PIPING AND FUEL PIPE
UNDERGROUND
TUNNEL
(TYP)
(E) TUNNEL EXHAUST FAN TO REMAIN
(E) 5KV, NEMA 3R
SPLICE BOX TO
REMAIN
(E) UNDERGROUND
CONDUIT
(N)(4)4"C - ABOVEGROUND CONDUITS
5 6
"MHAA-1"
4'x6'-6"x5'-6"
13 14
(8)5"C
(E)75KVA TRANSFORMER
(E)MV PB
(E)MCC
(E)MV DISCONNECT SWITCHES
(E)TRANSFORMER "TGB"
(E)45KVA TRANSFORMER
(E)LIGHTING PANEL "A"
(E)PANEL "B"
(E)BATTERY &
BATTERY CHARGER
(E)LOCAL DIST. PANEL (LDP)
(E)ALARMTRONICS
FUTURE PARALLELING
SWITCHGEAR WITH MASTER
CONTROLLER
(4) 5"C
(4)2"C (2)2"C
(2)2"C3
3 3
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
E1
EL
EC
TR
IC
AL
S
IT
E
PL
AN
N
EW
W
O R
K_
EN
LA
R
G
ED
-1
1-
.d w g D
AT
E/
TI
M
E:
N ov
4, 3:
PM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
KEYNOTES:
GENERAL NOTES: (APPLICABLE TO EXTERIOR WORK)
1. THE EXISTING CONDITIONS OF BELOW GROUND PIPING AND UTILITIES SUCH AS GAS
MAINS, WATER MAINS, SANITARY SEWERS, POWER AND COMMUNICATIONS CONDUITS
AND OTHER UTILITIES ARE TAKEN FROM EXISTING RECORD DRAWINGS AND VERIFIED
BY FIELD OBSERVATION. THE LOCATION OF THESE UTILITIES IS APPROXIMATE ONLY.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXACT
LOCATION AND DEPTH OF BELOW GROUND PIPING AND UTILITIES IN THE IMMEDIATE
VICINITY OF SUBSURFACE WORK, WHETHER SHOWN ON THE DRAWING OR NOT.
CONTRACTOR SHALL RETAIN THE SERVICES OF AN UNDERGROUND UTILITY
LOCATING COMPANY. UTILIZE GROUND PENETRATING RADAR AND OTHER UTILITY
LOCATING DEVICES TO DETERMINE THE LOCATION AND DEPTH OF ALL
UNDERGROUND IMPROVEMENTS WITHIN APPROXIMATELY 20' OF ALL NEW WORK.
PAINT MARK ALL UTILITY LOCATIONS ON THE PAVEMENT SURFACE. THIS TASK SHALL
BE COMPLETED PRIOR TO ANY EXCAVATING.
2. PRIOR TO STARTING TRENCHING, POTHOLE TO VERIFY THE DEPTH OF EXISTING
PIPES WHICH ARE TO JOIN OR CROSS NEW PIPING OR CONDUITS. ADJUST DEPTH OF
NEW PIPE CONDUIT AS REQUIRED TO CROSS EXISTING UTILITIES. NOTIFY ENGINEER
OF ANY DISCREPANCIES OR INTERFERENCES PRIOR TO LAYING ANY PIPE.
3. PRIOR TO STARTING TRENCHING, VERIFY LOCATION AND WORKING CONDITION OF
THE ASSOCIATED WATER VALVES WHICH NEED TO BE EXERCISED DUE TO THE
WATER SHUTDOWN ASSOCIATED WITH THE SCOPE OF WORK. NOTIFY ENGINEER IF
THERE ARE ANY DISCREPANCIES WITH THE VALVES.
4. EXISTING UNDERGROUND UTILITIES SHOWN HEREIN HAVE BEEN LOCATED FROM
VARIOUS SOURCES OF VARYING RELIABILITY, INCLUDING SURFACE EVIDENCE AND
AVAILABLE RECORDS, AND ARE SHOWN FOR INFORMATION ONLY. THE CONTRACTOR
IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL EXISTING UTILITIES
AND FOR THE PROTECTION OF AND REPAIR OF DAMAGE TO THEM.
5. ALL WORK RELATED TO SCE EQUIPMENT AND UNDERGROUND WORK SHALL BE
INSTALLED IN ACCORDANCE WITH SCE ESR AND UGS MANUAL. IT SHOULD BE
ACCEPTED BY SCE INSPECTION TEAM. SEE ATTACHED SCE DRAWING FOR
ADDITIONAL INFORMATION.
6. CONTACT DIG ALERT (811) 48 HOURS PRIOR TO EXCAVATION.
SCALE
TRUE
NORTH
PLAN
NORTH1
3,750KVA TRANSFORMER PAD, SEE DETAIL 6/E4.1
PROVIDE ONE ROUND OF SLACK CONDUCTOR.
REMOVE AND REPLACE AC PAVING FOR ELECTRICAL CONDUIT TRENCH.
SEE DETAIL 2/E4.0, 2/E4.1
VACUUM FAULT INTERRUPTER (VFI) EQUIPMENT PAD, SEE DETAIL 7/E4.1.
BYPASS EQUIPMENT PAD, SEE DETAIL 5/E4.1.
3-WAY RAG EQUIPMENT PAD, SEE DETAIL 5/E4.1.
CAPACITOR EQUIPMENT PAD, SEE DETAIL 8/E4.1.
(E) EQUIPMENT PAD TO REMAIN. COVER TRENCH SIMILAR TO EXISTING
COVER PLATE ONCE THE REMOVAL OF (E)EQUIPMENT IS COMPLETED.
(E)SCE 12KV UNDERGROUND CONDUIT NOT VERIFIED. CONDUIT SHALL
BE ABANDONED IN PLACE ONCE THE UPGRADE IS COMPLETED.
NEW 5KV, 1200A, 3Ø, SCE METERING EQUIPMENT SHALL BE IN
COMPLIANCE WITH ESR REQUIREMENT. SUBMIT SHOP DRAWING TO SCE
FOR APPROVAL. SEE DETAIL #2, E4.2 FOR EQUIPMENT PAD DETAIL.
18" X 18" X 6" NEMA 3R PULL BOX (LOW VOLTAGE - POWER).
18" X 18" X 6" NEMA 3R PULL BOX (SIGNAL).
1 1/2"Ø AND 2"Ø PVC (POWER), SEE DETAIL 5/E4.2.
(2)2"Ø PVC (SIGNAL), SEE DETAIL 5/E4.2.
SEE DETAIL 2/E4.2 EXCEPT CONDUIT IS 4" DIAMETER.
(E)SCE 5KV UNDERGROUND CONDUITS AND THE ROUTING ARE NOT
VERIFIED. CONDUITS SHALL BE PLUG AND ABANDONED IN PLACE ONCE
THE UPGRADE IS COMPLETED.
(1)5"C, SEE DETAIL 4/E4.2
(2)5"C, SEE DETAIL 9/E4.2
(4)5"C, SEE DETAIL 8/E4.2
24"D X 36"W X 48"H HV PULL BOX
REPAIR DAMAGE ASPHALT WALKWAY DUE TO NEW UNDERGROUND
CONDUIT. EXTEND WIDTH OF ASPHALT WALKWAY FOR 48".
REFER WITH SCE DRAWING FOR ADDITIONAL INFORMATION ON POLE
RISER REQUIREMENT.
12" X 22" UNDERGROUND PULLBOX, SEE DETAIL 4/E4.3. PROVISION FOR
FUTURE GENERATOR AREA INTERFACE.
REMOVE AND REPLACE AC PAVING FOR ELECTRICAL CONDUIT TRENCH.
SEE DETAIL 2/E4.0 BUT 8 CONDUITS.
SEE DETAIL 8/E4.2 BUT 10 CONDUITS
REMOVABLE BOLLARD, TYPICAL OF 2, SEE DETAIL 2/E4.3
FIXED BOLLARD, DETAIL 4/E4.1, NOT TO EXCEED 4'-6" APART, TYPICAL.
REMOVE AND REPLACE AC PAVING FOR ELECTRICAL CONDUIT TRENCH.
FUTURE GENERATOR POWER CONDUITS, SEE DETAIL 2/E4.0.
0 FEET8
1" = 8'-0"
4 16
ELECTRICAL SITE
PLAN - ENLARGED
E1.2
ELECTRICAL SITE PLAN - ENLARGED
(E) SS
(E)
COGENERATION
BUILDING
EXISTING CONCRETE SLAB OVER
UNDERGROUND #2 FUEL OIL
STORAGE TANK
TRANSFORMER
PIPE
BRIDGE
BALSAM STREET
G
(E) MANHOLE "MHAA"
R=5'-0"
(TYP)
"MHAA-2"
DETAIL#1/E4.0
12KV OVERHEAD LINE
G10D
(E)UNDERGROUND CONDUIT
BETWEEN 12KV
SWITCHGEAR AND OUTDOOR
SUB-STATION
VERIFY ON SITE THE DEPTH
AND ROUTING
(E) GROUND OF
TRANSFORMER "A"
TO RE-USE
(E)UNDERGROUND
GROUNDING
(E) UNDERGROUND CONDUIT(E)HV1-15, CK-2, HV2-2,
HV1-2, HV3-2, HV4-2
(E)CK-3, F4-2
(E)MV PB
(E)MANHOLE "MHA"
(E) CHW SUPPLY AND RETURN
PIPING AND FUEL PIPE
UNDERGROUND
TUNNEL
1' -6
5' -0
(E)TUNNEL EXHAUST FAN TO REMAIN
(E)5KV, NEMA
3R SPLICE
BOX TO
REMAIN
(E)UNDERGROUND
CONDUIT
"MHAA-1"
DETAIL#5/E4.3
3'-0"
4' -0
2'
-6
(8)5"C
5 6
1 8
4'-0"
29 (TYP.)
FUTURE
ABOVEGROUND
TANK
FUEL
POLISHER
FUTURE
FUTURE
DAYTANK
NGR NGR
FUTURE PARALLELING
SWITCHGEAR WITH MASTER
CONTROLLER
2,500KW
FUTURE
2,500KW
FUTURE
(4)5"C
FUTURE GENERATOR
AREA NOT PART OF THIS
CONTRACT
11'-8"
6' -0
5'-9"
4'-7"
4' -6
4'-0"
'-0
(4)5"C
SCALE
ELECTRICAL SITE PLAN - UNDERGROUND NEW WORK
TRUE
NORTH
PLAN
NORTH1
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
E1
EL
EC
TR
IC
AL
S
IT
E
PL
AN
N
EW
W
O R
K
- 2
4-
-0
8.
dw g D
AT
E/
TI
M
E:
N ov
4, 3:
PM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
SEE ENLARGED PLAN ON
SHEET DETAIL 1 & 2/E2.0
KEYNOTES:
3,750KVA TRANSFORMER PAD, SEE DETAIL 6/E4.1.
PROVIDE ONE ROUND OF SLACK CONDUCTOR.
REMOVE AND REPLACE AC PAVING FOR ELECTRICAL
CONDUIT TRENCH. SEE DETAIL 2/E4.0, 2/E4.1.
VACUUM FAULT INTERRUPTER EQUIPMENT PAD, SEE DETAIL
7/E4.1
BYPASS EQUIPMENT PAD, SEE DETAIL 5/E4.1
3-WAY RAG EQUIPMENT PAD, SEE DETAIL 5/E4.1
CAPACITOR EQUIPMENT PAD, SEE DETAIL 8/E4.1
(E)EQUIPMENT PAD TO REMAIN. COVER TRENCH SIMILAR TO
EXISTING COVER PLATE ONCE THE REMOVAL OF
(E)EQUIPMENT IS COMPLETED.
GROUNDING TEST WELL, SEE DETAIL 4/E4.0.
#4/0 BARE COPPER CONDUCTOR BURIED 48" BELOW FINISH
GRADE.
5/8"Ø X 8' GROUNDING ROD, SEE DETAIL 4/E4.0 WITHOUT TEST
WELL
CONNECTION TO REBARS AND MAIN GROUNDING SHALL BE
BY EXOTHERMIC WELDING, USE #2/0 BARE COPPER WIRE
E1.3
ELECTRICAL
SITE PLAN -
UNDERGROUND
NEW WORK
1 11/08/24 ADDENDUM #1
(4)5"C
SEE ENLARGED PLAN ON
SHEET E2.0 DETAIL 4 & 5.
0 5 10 15 FEET 30
1" = 15'
SEE ENLARGED PLAN ON
SHEET DETAIL 3/E2.0
DEMOLISH POWER AND CONTROL CONDUCTOR
FROM 12KV SWITCHGEAR. CONDUIT SHALL BE
PLUG & FLUSH IN CONCRETE PAD.
(E) GROUNDING
DEMOLISH TRANSFORMER
TR-A AND PAD
DEMO OR SECURE BELOW GRADE GROUNDING
CONDUCTOR NO LONGER REQUIRED
(E) CONDUIT TO INTERCEPT AND RE-USE.
PROTECT
(E) GROUND
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
(E) PULL BOX
(E) ELECTRIC EQUIPMENT
TO REMAIN (TYP)
1 1/2"C -2#8+2#10+
2#10 GND
(4)4"C ABOVE GROUND
(E) PANEL "A"
(E) 5KV SWITCHGEAR
4.5
3.7
SWITCHGEAR
ROOM
STAIR #2
12KV SWITCHGEAR TO BE
DEMOLISHED INCLUDING
ASSOCIATED EQUIPMENT
SUCH AS BATTERY,
BATTERY CHARGER, ETC.
(E) MCC-A
STAIR #1
U.P.S. ROOM
PARTS/TOOLS
STORAGE
STORAGE
ROOM
REPAIR
SHOP
DEMOLISH (E) UNDERGROUND
CONDUIT AND CONDUCTOR.
CONDUIT SHALL BE CUT 6"
MINIMUM BELOW FINISH FLOOR.
G G G G G G
STUB-UP GROUNDING
TO BE DEMOLISHED
(TYP)
(E)GROUND RING TO
REMAIN AND PROTECT
IN PLACE.
SLURRY SEAL ABOVE DUCTBANK WHEN
ROUTING UNDER RETAINING WALL
FOOTING. SEE E4.1 DETAIL 1.
TO MANHOLE
"MHAA-1"
SEE E1.2
5' -0
" 7'-2"
INTERCEPT (E) CONDUIT AND PROVIDE
NEW CONDUCTOR, SEE SLD.
EQUIPMENT
GROUNDING
(E)LPA. PROVIDE 20A, 1P
CB KAIC RATING SHALL
MATCH EXISTING
3/4"C-3#12 CUPSW-1 HEATER
WEATHERPROOF SEAL THE PENETRATION
GROUND REBARS
TERMINATE CONDUIT 2' FROM
EQUIPMENT PAD, CAP & SECURE
(E) GROUNDING NEW LOAD INTERRUPTING
SWITCH "CUPSW-1"
PROVIDE #2/0 BARE COPPER GROUND
CONDUCTOR AND EXOTHERMICALLY
WELD WITH THE MAIN GROUNDING RING
ED.6D
ED.6D
ED.6D
4.5
3.7
ED.6D
SWITCHGEAR
ROOM
STAIR #2
(E) MCC-A
STAIR #1
U.P.S. ROOM
PARTS/TOOLS
STORAGE
STORAGE
ROOM
REPAIR
SHOP
(E) CONDUIT TO
BE RE-USED
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
E2
EN
LA
R G
ED
P
LA
N
-1
1-
.d w g D
AT
E/
TI
M
E:
N ov
4, 3:
PM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
NEW WORK KEYNOTES:
1 PROVIDE (1)2P, 40A (BATTERY CHARGER) AND (1)1P, 20A
(HEATER) FOR NEW OUTDOOR SWITCHGEAR.
MAIN SWITCHGEAR BUILDING
TRUE
NORTH
PLAN
NORTH3 SCALE: 0 FEET8
1/8" = 1'-0"
4 16
TRANSFORMER AREA - DEMOLITION PLAN
TRUE
NORTH
PLAN
NORTH1 SCALE: 0 FEET8
1/8" = 1'-0"
4 16
UNDERGROUND PULL SECTION (UGPS)
MAIN BREAKER
SCE METERING
HV1
HV2
CENTRAL KITCHEN BREAKER
HV3
HV4
TRANSITION SECTION
KEYNOTES:
SWITCHGEAR ROOM - DEMOLITION PLAN
TRUE
NORTH
PLAN
NORTH4 SCALE: 0 FEET8
1/8" = 1'-0"
4 16
TRANSFORMER AREA - NEW WORK PLAN
TRUE
NORTH
PLAN
NORTH2 SCALE: 0 FEET8
1/8" = 1'-0"
4 16
SWITCHGEAR ROOM - NEW WORK PLAN
TRUE
NORTH
PLAN
NORTH5 SCALE: 0 FEET8
1/8" = 1'-0"
4 16
GM BREAKER
HV4 AT BREAKER
SPARE
CIRCUIT BREAKER G-3 (FUTURE)
GEN #2 CONTROL SECTION
CIRCUIT BREAKER G-2
CIRCUIT BREAKER G-1
MASTER CONTROL PANEL
GEN #1 CONTROL SECTION
ENLARGED PLAN
E2.0
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
No.
JCCA #: 23793-5
00000000000XXXX
METROPOLITAN STATE HOSPITAL
11401 BLOOMFIELD AVENUE
NORWALK, CALIFORNIA 90650
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DSH-M CUP
INTERCONNECT
DSH
01/12/2024
SA
FI
LE
: L :\2
3\
3-
C U
P In te rc on ne ct , D
SH
-M
\C
AD
\2
5_
E4
D
ET
AI
LS
-1
1-
.d w g D
AT
E/
TI
M
E:
N ov
4, 1:
AM
JCCA
V2 PLAN CHECK SUBMITTAL
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
HJL ZML RN
Issue Date Description
RESERVED
NOT TO SCALE
NOT TO SCALE
WARNING
TAPE
3"
NATIVE BACKFILL
MATERIAL SHALL BE 90%
COMPACTION
CARLON
SNAP-N-STAC
SPACER LOCATED
EVERY 10'
CONDUIT
TYPE EB 35
PVC (TYP)
3' -6
3" 3"
REPAIR ASPHALT PAVEMENT.
SEE E4.1 DETAIL 2.
CAST IN PLACE
CONCRETE
ENCASEMENT
(2000) PSI) 12
2 NTS
UNDERGROUND ELECTRICAL CONDUIT
6"
6"6"
6' -8
5'-0"5'-0"
6"
5' -6
8" 6"
8"
REVERSABLE
FRAME
1" PICK HOLE
3'-1 3/4"
1/
8" 5"
3'-2"
1"
3'-0" 3'-9 1/4"
GENERAL INFORMATION
· ALL MATERIALS USED IN MANUFACTURING
SHALL CONFORM TO ASTM A48-83 CLASS
· 30. FRAME & COVER BEARING SURFACES
MACHINED TO ASSURE CLOSE, QUIET FIT.
· STANDARD COVER MEETS H-20 WHEEL
LOADING. STANDARD COVER MARKINGS
· LABEL:"ELECTRIC"
DESIGN FOR H-20-44 BRIDGE LOADING.
ASSEMBLY TO BE PLACED ON A 6" BASE OF
CRUSHER RUN FOR EASE OF INSTALLATION
AND EVEN LOAD DISTRIBUTION.
1 NTS
4'-0"x4'-0"x5'-6" MANHOLE DETAIL - JENSEN PRECAST
12"Ø SUMP KNOCKOUT
GROUNDING TEST WELL
NOT TO SCALE4
CL
5/8"Øx8' LENGTH COPPER
GROUND ROD
GROUND LEVEL
UNDERGROUND PULLBOX
DRAINAGE STEEL FRAME
1'x1'x2' DEEP DRAINAGE SUMP WITH 3/4" DIA.
PEA GRAVEL WRAPPED IN FILTER FABRIC
CABLE SUPPORT
5kV CONDUCTOR
CABLE CLEAT
EPVRT-04 OR
AS REQUIRED
HILTI KB-3 EXPANSION
ANCHOR 3/8"Ø x 4-1/2" WITH
MINIMUM EMBEDMENT OF
3-1/2".
12" DIA.
SUMP
CONDUCTOR
IN
PLAN
OUT
UNISTRUT SUPPORT
AND UNISTRUT FITTINGS
COMPLETE WITH BOLTS
WASHER AND WING NUT
36" CLEAR OPENING
FRAME & COVER MODEL
B-5520
5'-6" 4'-0"
4'-0"
#2 (TYP. FOR 8
EQUALLY SPACED)
(N) MANHOLE COVER
ASSEMBLY SEE DETAILS
FOR SPECIFICATIONS
AND DIMENSIONS
12"
MIN
12"
MIN (N) EXTERNAL
CONC. COLLAR
SLOPE TO DRAIN
MIN 2% ALL AROUND
SAWCUT (E) AC
FULL DEPTH
(E) AC (WHERE OCCURS)
#4 (TYP. FOR 4)
ADJOINED TO EXIST ASPHALT
NOT TO SCALE3
AND COVER ASSEMBLY
MANHOLE FRAME
RESERVED
6" BASE OF CRUSHER RUN
(E) SOIL
PREVENT LOSS OF
DENSITY ON (E) BASE
AND SUBGRADE
ERITECH INSPECTION WELLS
PART NUMBER T416B OR EQUAL
GROUND LEVEL
GROUNDING
ELECTRODE
CONDUCTOR
EXOTHERMIC
WELDING (TYP.)
5/8"Ø x 8' COPPER
GROUND ROD
10"Ø
/4
13"Ø
TO GROUNDING GRID/
GROUNDING ROD
TO EQUIPMENT
GROUND BUS
MECHANICALLY
CONNECTED
ELECTRICAL
DETAILS
E4.0
5" 5"
5"5"
1 1
| 241107_13292-00 91 13 - Addendum Rev. 12.23.2021.pdf |
| Pages from 13292_-_Project_Manual_Book_I.R3.pdf |
| Pages from 241107_13292-00 91 13 - Addendum Rev. 12.23.2021_1 (002).pdf |
File details come from the government source that posted it. Updated .