This document is an Addendum to an Invitation for Bid (IFB) for the Ridgway SP - G Loop Electrical project in Ouray County, Colorado. The addendum clarifies contractor questions and provides revisions to the specifications and drawings, including changes to pipe and conduit requirements. The project involves furnishing and installing electrical infrastructure at Ridgway State Park. The bid opening date is March 19, 2024 at 1:30 p.m. An optional pre-bid meeting was held on March 6, 2024, and site visits can be arranged with the Project Manager or Park Manager. The estimated value of the project exceeds $750,000. There are no union requirements, and no provisions for material cost increases between award and notice to proceed. Schedule 40 PVC pipe and Pure-Core HDPE pipe are specified for the project.
The document provides detailed technical specifications for the pipe and fittings, including requirements for handling, installation, pressure testing, and sterilization. Compensation will be per the bid schedule, with no separate measurement for pipe and connecting hardware. The IFB is being issued by the Colorado Parks and Wildlife (CPW) department.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ridgway G Loop Electrical_Drawings.pdf | ||
| SBP-6.14 BidBond.docx | DOCX document | |
| APPENDIX.pdf | ||
| Pre-Bid Meeting Agenda_G Loop.pdf | ||
| Pre-Bid Attendance List_G Loop Electric.pdf | ||
| Ridgway G Loop Electrical.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
Ridgway SP – G Loop Electrical
March 13, 2024
IFB1 NUMBER: 2024*0150
Bid Opening Date: March 19, 2024 at 1:30 p.m.
CLARIFICATIONS:
Contractor Questions and Responses:
These questions and answers have been provided to offer clarity to the bidding documents.
The project should be bid as the original drawings and specifications have been advertised.
An optional Pre-Bid Meeting was held at the Ridgway State Park Visitor Center on March 06, 2024. The Pre-Bid Meeting Agenda and Sign-In Sheet have been posted to the State VSS web site.
Anyone not in attendance may schedule a site visit by contacting the Project Manager or Park Manager in advance of visiting the site:
Project Manager: Patrick McKeever – 970-250-5600, patrick.mckeever@state.co.us Park Manager: John Freeborn – 970-626-5822 x17, john.freeborn@state.co.us
The following are answers to questions asked about the project:
1. Are there any other options for Buy American on the electrical gear? Electrician is telling me that the pedestals could potentially be two years out. Is this just something we would need to bid it as is, then supply other options?
Contractor shall bid the project in conformance with Build America, Buy America requirements. There may be instances where an award qualifies, in whole or in part, for an existing DOI general applicability waiver or when necessary, recipients may apply for, and the Department of the Interior (DOI) may grant, a waiver from these requirements, subject to review by the Made in America Office.
2. Is there any way to change the submittal to email? We are essentially cutting off two days from the bid time to ensure that they get to Denver in time.
No, only sealed, hard copy bids will be accepted at CPW headquarters in Denver.
mailto:patrick.mckeever@state.co.us mailto:john.freeborn@state.co.us
3. Please confirm that the contractor is to carry the cost of the transformers, not the park.
Contractor shall purchase, deliver and install the transformers.
4. Are we to reuse the corporation stop at the water main or purchase new ones?
Contractor shall furnish and install a new corporation stop at the water main, unless the CPW Project Manager approves the reuse of the existing corporation stop. For bidding purposes, assume all corporation stops will be replaced.
5. What is the start date for construction?
The Contractor shall be allowed from the date of approval of contract documents to submit shop drawings and product approvals and order and delivery of materials. The Notice to Proceed letter (CONTRACT START DATE) will be issued by the CPW Project Manager on a mutually agreeable date with the contractor, depending on material lead times and delivery, weather, Park operations, etc.
6. What is the estimated value for this project?
The CPW estimated value of this project is in excess of $750,000.00.
7. Are there union requirements for this project?
There are no union requirements for this project.
8. As there is quite a bit of time between award and NTP … will there be any provision for material cost increases between bid and notice to proceed?
There are no provisions for cost increases between Award and Notice to Proceed, however CPW does allow for payment for materials on hand as stated in the General Conditions for Capital Construction:
“PAYMENT FOR MATERIAL ON HAND
(a) Partial payments may be made to the extent of the delivered cost of materials to be incorporated in the work as evidenced by certified invoices, when produced on the project, delivered on the project or stored in acceptable storage places in the State of Colorado in which case the Contractor must furnish evidence to the Project Manager that such materials are stored subject to or under the control of the Division. Payment for such materials will not relieve the Contractor of responsibility for loss or damage of the stored materials.”
9. For the water tap saddles do you know the mainline size and type?
Original design drawings (attached) show 3” PVC main line, but contractor should confirm size and type of material before construction.
10. If we elect to bore the electrical instead of trenching what is the spec for the flexible duct/conduit.
If contractor elects to directionally drill electrical conduit pipe, pipe size and material shall be approved by CPW Project Manager, and have an equivalent internal diameter as specified pipe.
11. For the sewer services is schedule forty pvc pipe acceptable?
Schedule 40 PVC pipe shall be used as shown on drawings and stated in Addendum 1.
SPECIFICATIONS:
REMOVE: Existing Specification SECTION 02610 – PIPE AND FITTINGS in its entirety.
REPLACE: Attached revised Specification SECTION 02610 – PIPE AND FITTINGS.
DRAWINGS:
REMOVE: Drawing 14 of 17 – Site Details 1 in its entirety.
REPLACE: Attached revised Drawing 14 of 17 – Site Details 1.
catlinj Text Box
ADDENDUM #1
02610-1
SECTION 02610 - PIPE AND FITTINGS
1. SCOPE OF WORK:
Furnish all labor, materials and equipment required to complete the work of the noted Sections of this Division described herein and on the drawings.
2. WORK INCLUDED:
The work shall include, but is not necessarily limited to, the furnishing and installation of all components required for a complete installation.
3. MEASUREMENTS:
I. Quantities shall not be measured for pipe and connecting hardware, but shall be included in the related construction or as noted in the Bid Schedule.
4. SUBMITTALS:
Refer to Section 01300 - Submittals, for requirements.
5. PIPE INSPECTION AND INSTALLATION:
II. Placement:
Lay pipe with spigot ends directed down-grade unless otherwise directed. Lay pipe, fittings and accessories with proper equipment and in a manner to prevent damage.
Any defective pipe materials found during the inspection, prior to placing within the trench, shall be replaced.
All foreign matter or dirt shall be removed from the interior of the pipe before lowering into position in the trench. Pipe shall be kept clean during and after completion of laying.
Clean the sealing surfaces of the pipe immediately before assembly, and assembly shall be made as recommended by the manufacturer. Check the completed piping to assure joints are intact.
Prior to the placement of earth fill or other material around the pipe, observe pipe for leakage. Repair any leaks. Repeat the procedure until the pipe is watertight (The pipe joints shall show no leakage).
When pipe laying is not in progress, seal the open ends of installed pipe to prevent entrance of water into the line. Whenever water is excluded from the interior of the pipe, place enough backfill on the pipe to prevent floating. Remove any pipe that has floated from the trench and restore the bedding. No pipe shall be laid when the trench conditions or the weather are unsuitable for proper installation as determined by the Project Manager.
02610-2
III. Handling:
A. Handle pipe carefully to avoid damage to pipe, joints, and coatings. The
Owner will reject all damaged pipe. The manufacturer shall package the pipe in a manner designed to deliver the pipe to the project neatly, intact, and without physical damage. The transportation carrier shall use appropriate method and intermittent checks to insure the pipe is properly supported, stacked, and restrained during transport such that the pipe is not physically damaged.
B. Pipe shall be stored on a clean, level location. Materials may not be stored directly on ground. If necessary, the pipe may be stacked in accordance with the pipe manufacturer's recommendations. The handling of the pipe shall be done in such a manner that it is not damaged by dragging over sharp objects or cut by chokers or lifting equipment.
C. PVC pipe shall not be exposed to ultraviolet light longer than six (6) months. Any discoloration of the pipe material will be evidence of ultraviolet damage and shall reason for rejection and removal from the project.
IV. Pressure Testing:
A. If testing is required by the Project Manager, perform testing in the presence of the Project Manager prior to backfilling. Furnish water for testing.
B. Place sufficient backfill prior to filling with water and testing to prevent lifting of the pipe. If it is necessary to partially backfill the line prior to testing to hold the line in place, the initial backfill shall cover only the body of the pipe with joints and connections left uncovered for inspection. When local conditions require that the trenches be backfilled immediately after the pipe has been laid, the testing may be carried out after backfilling has been completed, but before placement of permanent surface.
C. Fill each section of the pipe slowly with water and expel air by means of taps at high points. Apply the specified test pressure by means of pump connected to the pipe in an approved manner. Maintain the test pressure by additional pumping if necessary for the specified time during which the system and exposed pipe, valves and fittings, shall be carefully examined for leakage.
Repair or remove and replace all defective elements and repeat the test until all visible leakage has been stopped and the allowable leakage requirements have been met. Monitor pressure drops and inspect the pipeline in its entirety while the maximum working pressure is maintained.
D. Simultaneous pressure and leakage tests may be conducted, or separate pressure and leakage tests may be performed on the installed system on the criteria specified in Table I.
02610-3
TABLE 1 -- WATER SYSTEM TEST METHODS
Procedure Pressure Duration of Test
Simultaneous pressure and leakage tests
Normal operating pressure * at lowest elevation plus 50 psi or Pressure rating of pipe plus 50 psi, whichever is least
Two hours
Separate pressure test
Normal operating pressure at lowest elevation plus 50 psi or Pressure rating of pipe plus 50 psi, whichever is least
One hour
Separate leakage test
Average test pressure of segment tested
Two hours
* Highest normal operating pressure for this water line will be ** psi.
E. Furnish the gauges and measuring device for the leakage test, pump, pipe, connections and all other necessary apparatus, and furnish the necessary personnel to conduct the test. The duration of each leakage test shall be two hours, unless otherwise specified, and during the test the main shall be subjected to the quantity of water that must be supplied into the newly laid pipe, or any specified leakage test pressure after the pipe has been filled with water and the air in the pipeline has been expelled. No installation will be accepted if the leakage is greater than determined by the formula:
P D N = L
L is the allowable leakage, in gallons per hour; N is the number of joints in the length of pipeline tested; D is the nominal diameter of the pipe, in inches;
and P is the average test pressure during the leakage test, in pounds per square inch gauge.
F. Filling:
The line shall be slowly filled with water with adequate provision made for the release of air to bleed all entrapped air during the process. The pressure shall be slowly built up to the maximum design working pressure.
Pressurization should take a minimum of ten (10) minutes for pipes four (4) inches and smaller in a test section of 1,000 feet and proportionally longer for increased diameters and lengths.
V. Sterilization:
A. General
Flush and sterilize the completed waterline with chlorine before acceptance for domestic service in the presence of the Project Manager.
02610-4
Chlorinate the finished pipeline upon completion of hydrostatic testing.
B. Health and Procedure Standards:
Flushing and sterilization of line shall be performed in accordance with the requirements of the Colorado State Board of Health, and AWWA C 601 for the chlorinating agent and the method of application.
C. Equipment, Materials and Procedure:
Furnish all equipment, material, qualified personnel and water for sterilization and flushing of waterline.
Liquid chlorine or Hypochlorite (H.T.H.) may be used, and shall conform to Federal Specifications O-C-114, Type II, Grade B.
If chlorine tablets are used for disinfection, tablets shall be attached to the inside top of each section of pipe with Loctite Permatex No. 1 just prior to the pipe installation in the trench.
The number of 5-g tablets required for each pipe shall be 0.0012d²L rounded to the next higher integer.
The pipe shall remain full of chlorinated water for 24 hours. After the 24-hour period the water shall be tested by the local county health authority or their designated representative to insure a residual chlorine content of not less than 25 mg/1. Thoroughly flush the pipeline to remove the chlorinated water.
D. Care shall be taken in flushing the pipeline to prevent property damage and danger to the public.
Samples of water may be collected for bacteriological examination and residual chlorine content before the pipe is put into service.
6. MATERIALS AND INSTALLATION:
VI. Pipe:
A. Pressure Pipe:
1. HDPE pipe shall be Pure-Core SDR 9 pipe manufactured by JM Eagle or approved equal.
2. Pipe shall be made in accordance with ASTM D2239 and ASTM D2737 and meet the requirements of AWWA C901 and PE 3408 meeting cell class 343546E.
B. Gravity Pipe:
1. PVC pipe shall be manufactured by Certainteed, Diamond Plastics Corp., J-M Manufacturing, Ipex Inc., or approved equal.
catlinj
02610-5
2. The pipe shall be Schedule 40 PVC pipe iron pipe size DR25. Pipe and fittings shall be rated for 165 psi minimum service. Schedule pipe requirements shall meet ASTM D 1785 using PVC 1120, 1220 or 2120.
Socket type fittings for solvent welded joints shall conform to ASTM D 2467 for Schedule 80, ASTM D 2466 for Schedule 40 and ASTM D 2464 for the threaded type. The solvent cement shall comply with ASTM D 2564.
2. Pipe and fittings shall be made from Class 12454-A or 12454-B virgin compounds in accordance with ASTM D 1784 and meet the requirements of AWWA C900.
B. Joints:
1. Bell and Spigot: Pipe joints, complying with ASTM D 3139, shall be made using an integral bell with an elastomeric gasket push-on type joint or using machined couplings of a sleeve type with rubber ring gaskets and machined pipe ends to form a push-on type joint. Rubber ring gaskets shall conform to ASTM F 477. Adequate gasket lubricant shall be furnished for all of the pipe and fittings connections.
2. Solvent Weld: The joints shall meet ASTM D 2672. Only for approved indoor applications.
II. Associated Fittings and Adapters:
A. Compression Couplings: APAC, Dresser, Romac compression coupling, or approved equal. The coupling shall be of the type necessary for connecting the type and diameters of pipe required.
B. PVC Fittings: Unless otherwise noted on drawings or in the specifications, fittings for PVC pipe shall be PVC and certified for the pressure rating of the associated pipe. Elbow fittings shall be standard angles, a combination of standard angles, or angles fabricated to the nearest one degree for PIP, IPS, and sewer pipes.
C. Unions: Unions shall be rated for Schedule 80 PVC materials and fittings and comply with ASTM D 1784 for PVC Type 1, Grade 1. Threaded fittings shall conform to ASTM D 2464.
III. Buried Detection Tape:
The waterline detection tape shall be "Magnatex" detectable underground warning tape by Empire Level (www.empirelevel.com), or approved equal. The tape shall consist of a flexible plastic sheath, permanently color coded (impregnated) APWA Blue containing a solid aluminum foil core. The tape legend shall read "Buried Water Line Below" upon the 2 inch wide material.
End of Section
AutoCAD SHX Text
WIDTH VARIES
AutoCAD SHX Text
EXCAVATED TRENCH
AutoCAD SHX Text
2' MIN
AutoCAD SHX Text
NEW ELECTRICAL CONDUIT ON NATIVE MATERIAL FOUNDATION
AutoCAD SHX Text
PLACE FLOW FILL
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
4" HOT MIX ASPHALT PATCH MEETING CDOT REQUIREMENTS.
AutoCAD SHX Text
NATIVE MATERIAL FOUNDATION
AutoCAD SHX Text
TYPICAL CONDUIT TRENCH DETAIL
AutoCAD SHX Text
UNDER DRIVE SURFACE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
2' MIN
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
1" CURB VALVE (WITH DRAIN) & VALVE BOX (TYP)
AutoCAD SHX Text
DRAIN & HYDRANT - PLAN
AutoCAD SHX Text
DRAIN AND HYDRANT - SECTION
AutoCAD SHX Text
PRECAST CONC RING & GRAVEL SPLASH PAD
AutoCAD SHX Text NEW YARD HYDRANT, BAKER 'MONITOR MAGNUM' FROST-PROOF MODEL OR APPROVED EQUIVALENT
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
PRECAST CONC RING & GRAVEL SPLASH PAD. SEE PLAN.
AutoCAD SHX Text 1" BRASS BALL VALVE & CURB STOP STYLE C.I. VALVE BOX WITH STEM (TYP) (MUELLER OR APPROVED EQUIV).
AutoCAD SHX Text
1" BRASS HYDRANT ELBOW
AutoCAD SHX Text
1" PURE-CORE HDPE PIPE
AutoCAD SHX Text
1" 'PURE-CORE' PIPE(10' MAX. LENGTH)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text NOTE: WHERE CONCRETE REMOVAL IS NECESSARY, REPLACE WITH 4" THICK COLORED CONCRETE OVER COMPACTED SUBGRADE. CONCRETE SHALL BE 4,500 PSI MIN. COMPRESSIVE STRENGTH, DAVIS COLORS #5844, 'WESTERN GOLD'.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
DRAFTER:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
CHIEF ENGR.:
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
RIDGWAY STATE PARK
AutoCAD SHX Text
FINAL
AutoCAD SHX Text
G LOOP ELECTRICAL
AutoCAD SHX Text
JOC
AutoCAD SHX Text 03/24
AutoCAD SHX Text
JOC
AutoCAD SHX Text 03/24
AutoCAD SHX Text
C24RG1
AutoCAD SHX Text
SITE DETAILS 1
AutoCAD SHX Text
AutoCAD SHX Text
OF 17
AutoCAD SHX Text
TYPICAL CONDUIT TRENCH DETAIL N.T.S.
AutoCAD SHX Text
CORPORATION STOP AND TAPPING SADDLE
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDENDUM #1
AutoCAD SHX Text 03/13/24
AutoCAD SHX Text joc catlinj