addendum-1-bid-3032-25.pdf

PDF 144 KB Posted

Attached to
CONTRACT: DRY SYSTEM FIRE PROTECTION DESIGN AND BUILD SERVICES
Solicitation number
Bid 3032-25
Issued by
Rockingham County, New Hampshire

About this file

This is Addendum #01 to Bid Invitation 3032-25 issued by the State of New Hampshire, Division of Procurement and Support Services, for Dry System Fire Protection Design and Build Services at the New Hampshire Fish and Game Department's Region 3 facility in Durham. The addendum clarifies that the pre-bid walkthrough is scheduled for April 21, 2025 at 10:00 AM, superseding the previously listed date of September 24, 2024 at 9:00 AM. Bids are due on May 2, 2025 at 10:00 AM. The project involves design and installation of a new dry pipe sprinkler system across approximately 7,500 square feet of heated occupied spaces and attic areas, with contractors required to perform flow tests, obtain permits from the State Fire Marshal's Office, submit professionally engineered plans, and coordinate installation with minimal disruption to facility operations. The contract term is approximately three months from June 30, 2025 through September 26, 2025, with potential extension for up to three additional months.

Bidders must submit lump sum proposals covering all labor, materials, start-up, and required training, with the option to provide both a base bid using the existing air compressor and an alternate bid involving nitrogen generator replacement. The state has included a $15,000 project allowance for modifications or unforeseen conditions and reserves the right to add or delete locations or equipment during the contract period. Vendors are required to provide comprehensive insurance coverage including commercial general liability, workers' compensation, and builder's risk insurance. All changes noted in this addendum supersede previously submitted documents and must be included with bid submissions. The purchasing agent for this solicitation is C. Ryan Fuller, and bidders are directed to visit the New Hampshire Department of Administrative Services website for complete bid documents and addendums.

View the file

Other files

File Type Posted
Addendum_1_bid_3032_25.pdf PDF
attachment_2_bid_3032_25.pdf PDF
bid_3032_25.pdf PDF
attachment_1_bid_3032_25.pdf PDF
bid-3032-25-award.pdf PDF
attachment-1-bid-3032-25.pdf PDF
bid-3032-25.pdf PDF
attachment-2-bid-3032-25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF NEW HAMPSHIRE

DIVISION OF PROCUREMENT AND SUPPORT SERVICES

BUREAU OF PURCHASE AND PROPERTY

STATE HOUSE ANNEX

25 CAPITOL STREET

CONCORD, NEW HAMPSHIRE 03301-6398

Date of Change: April 18, 2025

ADDENDUM # 01 TO BID INVITATION 3032-25

DATE AND TIME OF BID CLOSING: 5/2/2025 10:00 AM

FOR: Dry System Fire Protection Design and Build Services

Question 1: The timeline states that the pre-bid walkthrough is 4/21/2025 at 10:00AM, but the Site Examination section lists the pre-bid walkthrough as 9/24/2024 at 9:00AM. Please confirm the pre-bid walkthrough date and time.

State Response: The pre-bid walkthrough is scheduled for 4/21/2025 at 10:00AM.

PURCHASING AGENT: C. RYAN FULLER

Email: NH.Purchasing@das.nh.gov

NOTE: ALL CHANGES TO BID SOLICITATION NOTED IN ADDENDUMS WILL SUPERSEDE

PREVIOUSLY SUBMITTED DOCUMENTS AND MUST BE SUBMITTED WITH THE BID. ALL OTHER

SPECIFICATIONS REMAIN UNCHANGED AND VALID.

RESPONDENT BUSINESS NAME: ______________________________________________________________

ADDRESS: __________________________________________________________________________________

PRINT NAME: __________________________________SIGNATURE: ________________________________

TEL. NO.____________________________ EMAIL ADDRESS: _______________________________________

Please visit: https://das.nh.gov/purchasing/vendorresources.aspx (click on “Bid and Proposals”) for complete bid and addendums.

mailto:NH.Purchasing@das.nh.gov https://das.nh.gov/purchasing/vendorresources.aspx

File details come from the government source that posted it. Updated .