About this file

This document package includes installation drawings and specifications for ceiling lifts to be installed at the VA Bronx Emergency Department as part of a renovation and modernization project. The drawings show the proposed layout of ceiling tracks, trolleys, and related components across ten rooms. Product information is provided for Arjo ceiling lifts that can support loads up to 600 pounds. The installation requirements specify structural capacity for ceiling and floor loading, electrical specifications, clearance needs, and responsibility for modifications. Bidders must review and sign off on the drawings and conditions to confirm the installation plan prior to ordering and installation.

The related federal opportunity is a solicitation amendment extending the bid due date to August 10, 2022 for project 526-15-112 to renovate and modernize the ER at the VA Bronx facility. The amendment provides clarification to the statement of work, responses to bidder questions, the Arjo installation drawings, and a revised bid sheet to price the base work and an add alternate for exterior canopy work. Interested contractors must acknowledge review of all amendment documents and attachments to be deemed responsive. The work is being conducted by the Department of Veterans Affairs Veterans Health Administration VISN 2.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTOR :

REPRESENTATIVE :

DATE (DD-MMM-YYYY) :

REFERENCE # : PAGE :

INSTALLATION DRAWING

1. The ceiling minimum structure capacity must be able to support the load specified on the installation drawing.

2. Electrical power source outlet already available by the facility at a maximum distance of 3 meters from charging station.

3. Any obstructions such as vents, pipes, lights and sprinklers that could possibly be in the path of the ceiling lifts to be removed or relocated by the facility prior to installation.

4. Modifications of door headers by the facility.

5. Arjo reserves the right to slightly modify the track layout if necessary.

6. See the "Agreed Conditions for the Installation of Ceiling Lifts" document included with this quote for important installation details.

7. Arjo will not be held responsible for any damages, inconvenience, resulting from hitting any non visible conduits during our installation process.

8. Signed drawings are required prior to ordering and installation of ceiling lifts. This signature of each drawings confirms agreement of all the conditions listed above.

IMPORTANT NOTES

MY SIGNATURE BELOW VERIFIES THAT I HAVE:

Reviewed all ____ pages, with a total quantity of ____ rooms, for the approbation of layout for each room and the approbation of structure for each room. I verify that the answers below are accurate to the best of my knowledge and I understand that the quote produced is dependent upon the conditions below as well as this full drawing set.

Is a load dock available? YES NO

Can facility accept shipment and store until install begins? YES NO

Will a drop trailer be needed? YES NO

Is parking available on site? Is there a fee involved? YES NO

Are there any installation time frame limitations?

What are they? YES NO

Is a level of infectious control required? YES NO

If YES, then what level ___________________________

CUSTOMER

APPROVAL: DATE:

REVISION(S) DATE(S) (D-M-Y)

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

ARJO

JAY TURCO

1 / 10

Legend

IV

(*) Symbol may vary depending of equipment type

Track

ServZone

Track with gate

X-Y Trolley (Suspended)

X-Y Trolley (Embedded)

Turntable (Auto/Manual)

Track with gate reverse

Wall post

Wall bracket

Wall post side

Track with service zone

Track with wall fixation

Track with T-junction

Exchanger

Swivel pole

IV track

Curtain track

Sprinkler

Smoke detector

Electrical outlet

Ceiling light

Ceiling vent

Access trap required

Existing access trap

Additional items

Motor/charger location

SPRINKLER SHIM

ECS-CSTAT

X-Y alim. type + options

140"H90

O

A L

H

LISTING OF ROOM NUMBER(S):

- ALL HARDWARE INCLUDED.

(ACCORDING TO STRUCTURE)

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael 1/4" = 1'

2 / 10

600LBS [272KG]

THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY

27.6 MPA [4000 PSI] MIN.

TILE

1C-414

A=108"

B=100"

D=4" ECS SYSTEM

Par

O

- ALL HARDWARE INCLUDED.

(ACCORDING TO STRUCTURE)

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael 1/4" = 1'

3 / 10

600LBS [272KG]

LISTING OF ROOM NUMBER(S):

THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY

27.6 MPA [4000 PSI] MIN.

TILE

1C-416

A=108"

B=100"

O

- ALL HARDWARE INCLUDED.

(ACCORDING TO STRUCTURE)

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael 1/4" = 1'

4 / 10

600LBS [272KG]

LISTING OF ROOM NUMBER(S):

THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY

27.6 MPA [4000 PSI] MIN.

TILE

1C-417

A=108"

B=100"

O

- ALL HARDWARE INCLUDED.

(ACCORDING TO STRUCTURE)

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael 1/4" = 1'

5 / 10

600LBS [272KG]

LISTING OF ROOM NUMBER(S):

THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY

27.6 MPA [4000 PSI] MIN.

TILE

1C-419

A=108"

B=100"

O

- ALL HARDWARE INCLUDED.

(ACCORDING TO STRUCTURE)

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael 1/4" = 1'

6 / 10

600LBS [272KG]

LISTING OF ROOM NUMBER(S):

THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY

27.6 MPA [4000 PSI] MIN.

TILE

1C-421

A=108"

B=100"

CONCRETE SLAB

LIFT CAPACITY= 600 LBS

LIFT TRACK BY

ARJO

FINISH

CEILING

B

" MAX. DISTANCE

BETWEEN ANGLE

FITTING AND CEILING

14" MAX

10" MIN

EXISTING CONCRETE

SLAB 5"

BRACE

D

EQUAL +2" OF

CENTERLINE

OF STRUT

2 7 9 11

BRACE

"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE

CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE

ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."

" MIN.

EMBEDMENT TYP.

INCLUDED

WITH KBTZ

121212

S

L

I

D

E

B

R

A

C

E

M

X

S

X

U

N

I

S

T

R

U

T

P

X

Item # Part # Description Qty

000.00394 THREADED ROD 3/8-16 X 10' ZINC 13

000.00402 LOCKNUT STOVER 3/8-16 ZINC 14

000.00405 NUT 3/8-16 ZINC 35

000.00424 HILTI STRUT SADDLE NUT 3/8-16 1

000.04430 FLAT WASHER M10 ZINC 5

200.11140 CEILING PLATE ø100MM 2

200.11170 BRACKET SHIM 12mm 1

304582 HILTI KBTZ 3/8 X 3 3/4 3

700.11100 TRACK BRACKET KWIKTRAK 1

P1068 UNISTRUT ANGLE 2

000.04435 TAB WASHER M10 1

1-5/8 x 10' SLOTTED CHANNEL

000.00426 HILTI CHANNEL NUT 3/8-16 2

000.00425 LOCKWASHER 3/8" 3

000.04875 FLAT WASHER M12 7

000.00357 BOLT 3/8" - 16 X 1" 2

16 311492 20"

- ALL HARDWARE INCLUDED.

(ACCORDING TO STRUCTURE)

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael N/A

7 / 10

600LBS [272KG]

750LBS [340KG]

- ALL HARDWARE INCLUDED.

(ACCORDING TO STRUCTURE)

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael N/A

8 / 10

600LBS [272KG]

750LBS [340KG]

LATERAL BRACE REQUIREMENTS REV-3

LEGEND

LATERAL

BRACE

TRACK

BRACKET

TRACK

BRACKET JOINT

LATERAL BRACE

LATERAL BRACE

LATERAL BRACE

FLAT WASHER M10

000.04430

LAG BOLT 3/8 X 2"

000.00699

UNISTRUT

000.0XXXX

SADDLE NUT

000.00424

FLAT WASHER M12

000.04875

FLAT WASHER M10

000.04430

LOCK WASHER 3/8

000.00425

BOLT 3/8-16 X 1"

000.00357

4 TRACKS SECTION

3 TRACK BRACKETS JOINT

9 LATERAL BRACES

1 TRACK SECTION

0 TRACK BRACKET JOINT

3 LATERAL BRACES

2 TRACKS SECTION

1 TRACK BRACKET JOINT

4 LATERAL BRACES

3 TRACKS SECTION

2 TRACK BRACKETS JOINT

6 LATERAL BRACES

- MINIMUM 3 LATERAL BRACES.

- NUMBER OF LATERAL BRACE = (NUMBER OF TRACK BRACKET JOINT X 2) + 2.

WOOD JOIST STEEL CONCRETE

HOLLOW CORE

ACCEPTABLE ANGLE

POSSIBLE ANCHOR LATERAL TO THE CEILING OR TO THE WALL

HILTI KHEZ 3/8 X 3 1/2

418058

LATERAL BRACE

HIT S SCREEN TUBE

00068613

HY150 MAX ADHESIVE

332230

3/8" HIT A ROD

00088978

FLAT WASHER M12

000.04875

FLAT WASHER M10

000.04430

NUT 3/8-16 ZINC

000.00405

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael N/A

9 / 10

600LBS [272KG]

750LBS [340KG]

MAX. STRUT BRIDGE "SPAN"

STRUT

LIFT CAPACITY

HS 158-12

P1000

HS 2716-12

P5500

P5501

P5001

P1001

P5000

600#

1'-8"

2'-0"

3'-3"

4'-0"

5'-4"

6'-4"

8'-6"

10'-4"

STRUT BRIDGE PER TABLE

BELOW (SLOT- FACE DOWN)

"SPAN"

REF. TABLE BELOW

DUCT, PIPE

OR OTHER

OBSTRUCTION

AS OCCURS

STRUT TO BUILDING STRUCTURE

REF. PLANS AND DETAILS

B

R

A

C

E

O

R

U

C

T

U

R

E

R

E

F

P

A

N

N

D

D

E

T

A

I

L

S

BRIDGE DETAIL

Item # Part # Description Qty

000.00394 THREADED ROD 3/8-16 X 10' ZINC 21

000.00405 NUT 3/8-16 ZINC 6

TYP. ROD

HANGER PER

PLANS AND

DETAILS

1 5/8" SQUARE X 1/4" FLAT PLATE

WASHER

"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE

CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE

ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."

000.00424 HILTI STRUT SADDLE NUT 3/8-16 23

000.00425 LOCKWASHER 3/8" 2

000.04875 FLAT WASHER M12 2

000.04430 FLAT WASHER M10 ZINC 2

VERIFY IN FIELD

QUANTITY OF ROOMS:

DRAWN BY :

REFERENCE # : PAGE :

SCALE :

DATE CREATED (DD-MMM-YYYY) :

SAFE WORKING LOAD BELOW LIFT:

WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION

VA BRONX

EMERGENCY DEPARTMENT

QC-09261820

26-SEP-2018

Michael N/A

10 / 10

Z

600LBS [272KG]

750LBS [340KG]

EMBEDDED X-Y CONFIG.

700-11228 - ECS to ECS wiring kit

FLUSH X-Y CONFIG.

STANDARD X-Y CONFIG.

WALL MOUNTED X-Y CONFIG.

ECS - ECS CHARGING

CONTACT BOX (3X)

ECS ON FIXED RAIL

ECS ON MOVING RAIL

V5 Duo

MS600 ecs

MS2 ecs

MS440

V5 Duo

MS600 ecs

MS2 ecs

MS440

V5 Duo

MS600 ecs

MS2 ecs

MS440

V5 Duo

MS600 ecs

MS2 ecs

MS440

File details come from the government source that posted it. Updated .