This document package includes installation drawings and specifications for ceiling lifts to be installed at the VA Bronx Emergency Department as part of a renovation and modernization project. The drawings show the proposed layout of ceiling tracks, trolleys, and related components across ten rooms. Product information is provided for Arjo ceiling lifts that can support loads up to 600 pounds. The installation requirements specify structural capacity for ceiling and floor loading, electrical specifications, clearance needs, and responsibility for modifications. Bidders must review and sign off on the drawings and conditions to confirm the installation plan prior to ordering and installation.
The related federal opportunity is a solicitation amendment extending the bid due date to August 10, 2022 for project 526-15-112 to renovate and modernize the ER at the VA Bronx facility. The amendment provides clarification to the statement of work, responses to bidder questions, the Arjo installation drawings, and a revised bid sheet to price the base work and an add alternate for exterior canopy work. Interested contractors must acknowledge review of all amendment documents and attachments to be deemed responsive. The work is being conducted by the Department of Veterans Affairs Veterans Health Administration VISN 2.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RENOVATE AND MODERNIZE E.R._REVISED SOW AND BID PRICING SHEET WITH DRAWINGS AND PHOTOS.pdf | ||
| ADDENDUM 1_REVISED SPECS_BANCROFT AE.pdf | ||
| RENOVATE AND MODERNIZE E.R._SITE VISIT SIGN IN SHEET_7.7.2022.pdf | ||
| RENOVATE AND MODERNIZE E.R._COMPILED LIST OF RFI AND VA RESPONSES_REV 2 7.27.22.pdf | ||
| AMENDMENT 1_CANOPY SCOPE AND DRAWING.pdf | ||
| RENOVATE AND MODERNIZE ER_IFB 36C24222B0004_AMENDMENT 0001.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTOR :
REPRESENTATIVE :
DATE (DD-MMM-YYYY) :
REFERENCE # : PAGE :
INSTALLATION DRAWING
1. The ceiling minimum structure capacity must be able to support the load specified on the installation drawing.
2. Electrical power source outlet already available by the facility at a maximum distance of 3 meters from charging station.
3. Any obstructions such as vents, pipes, lights and sprinklers that could possibly be in the path of the ceiling lifts to be removed or relocated by the facility prior to installation.
4. Modifications of door headers by the facility.
5. Arjo reserves the right to slightly modify the track layout if necessary.
6. See the "Agreed Conditions for the Installation of Ceiling Lifts" document included with this quote for important installation details.
7. Arjo will not be held responsible for any damages, inconvenience, resulting from hitting any non visible conduits during our installation process.
8. Signed drawings are required prior to ordering and installation of ceiling lifts. This signature of each drawings confirms agreement of all the conditions listed above.
IMPORTANT NOTES
MY SIGNATURE BELOW VERIFIES THAT I HAVE:
Reviewed all ____ pages, with a total quantity of ____ rooms, for the approbation of layout for each room and the approbation of structure for each room. I verify that the answers below are accurate to the best of my knowledge and I understand that the quote produced is dependent upon the conditions below as well as this full drawing set.
Is a load dock available? YES NO
Can facility accept shipment and store until install begins? YES NO
Will a drop trailer be needed? YES NO
Is parking available on site? Is there a fee involved? YES NO
Are there any installation time frame limitations?
What are they? YES NO
Is a level of infectious control required? YES NO
If YES, then what level ___________________________
CUSTOMER
APPROVAL: DATE:
REVISION(S) DATE(S) (D-M-Y)
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
ARJO
JAY TURCO
1 / 10
Legend
IV
(*) Symbol may vary depending of equipment type
Track
ServZone
Track with gate
X-Y Trolley (Suspended)
X-Y Trolley (Embedded)
Turntable (Auto/Manual)
Track with gate reverse
Wall post
Wall bracket
Wall post side
Track with service zone
Track with wall fixation
Track with T-junction
Exchanger
Swivel pole
IV track
Curtain track
Sprinkler
Smoke detector
Electrical outlet
Ceiling light
Ceiling vent
Access trap required
Existing access trap
Additional items
Motor/charger location
SPRINKLER SHIM
ECS-CSTAT
X-Y alim. type + options
140"H90
O
A L
H
LISTING OF ROOM NUMBER(S):
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael 1/4" = 1'
2 / 10
600LBS [272KG]
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
27.6 MPA [4000 PSI] MIN.
TILE
1C-414
A=108"
B=100"
D=4" ECS SYSTEM
Par
O
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael 1/4" = 1'
3 / 10
600LBS [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
27.6 MPA [4000 PSI] MIN.
TILE
1C-416
A=108"
B=100"
O
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael 1/4" = 1'
4 / 10
600LBS [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
27.6 MPA [4000 PSI] MIN.
TILE
1C-417
A=108"
B=100"
O
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael 1/4" = 1'
5 / 10
600LBS [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
27.6 MPA [4000 PSI] MIN.
TILE
1C-419
A=108"
B=100"
O
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael 1/4" = 1'
6 / 10
600LBS [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
27.6 MPA [4000 PSI] MIN.
TILE
1C-421
A=108"
B=100"
CONCRETE SLAB
LIFT CAPACITY= 600 LBS
LIFT TRACK BY
ARJO
FINISH
CEILING
B
" MAX. DISTANCE
BETWEEN ANGLE
FITTING AND CEILING
14" MAX
10" MIN
EXISTING CONCRETE
SLAB 5"
BRACE
D
EQUAL +2" OF
CENTERLINE
OF STRUT
2 7 9 11
BRACE
"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE
CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE
ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."
" MIN.
EMBEDMENT TYP.
INCLUDED
WITH KBTZ
121212
S
L
I
D
E
B
R
A
C
E
M
X
S
X
U
N
I
S
T
R
U
T
P
X
Item # Part # Description Qty
000.00394 THREADED ROD 3/8-16 X 10' ZINC 13
000.00402 LOCKNUT STOVER 3/8-16 ZINC 14
000.00405 NUT 3/8-16 ZINC 35
000.00424 HILTI STRUT SADDLE NUT 3/8-16 1
000.04430 FLAT WASHER M10 ZINC 5
200.11140 CEILING PLATE ø100MM 2
200.11170 BRACKET SHIM 12mm 1
304582 HILTI KBTZ 3/8 X 3 3/4 3
700.11100 TRACK BRACKET KWIKTRAK 1
P1068 UNISTRUT ANGLE 2
000.04435 TAB WASHER M10 1
1-5/8 x 10' SLOTTED CHANNEL
000.00426 HILTI CHANNEL NUT 3/8-16 2
000.00425 LOCKWASHER 3/8" 3
000.04875 FLAT WASHER M12 7
000.00357 BOLT 3/8" - 16 X 1" 2
16 311492 20"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael N/A
7 / 10
600LBS [272KG]
750LBS [340KG]
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael N/A
8 / 10
600LBS [272KG]
750LBS [340KG]
LATERAL BRACE REQUIREMENTS REV-3
LEGEND
LATERAL
BRACE
TRACK
BRACKET
TRACK
BRACKET JOINT
LATERAL BRACE
LATERAL BRACE
LATERAL BRACE
FLAT WASHER M10
000.04430
LAG BOLT 3/8 X 2"
000.00699
UNISTRUT
000.0XXXX
SADDLE NUT
000.00424
FLAT WASHER M12
000.04875
FLAT WASHER M10
000.04430
LOCK WASHER 3/8
000.00425
BOLT 3/8-16 X 1"
000.00357
4 TRACKS SECTION
3 TRACK BRACKETS JOINT
9 LATERAL BRACES
1 TRACK SECTION
0 TRACK BRACKET JOINT
3 LATERAL BRACES
2 TRACKS SECTION
1 TRACK BRACKET JOINT
4 LATERAL BRACES
3 TRACKS SECTION
2 TRACK BRACKETS JOINT
6 LATERAL BRACES
- MINIMUM 3 LATERAL BRACES.
- NUMBER OF LATERAL BRACE = (NUMBER OF TRACK BRACKET JOINT X 2) + 2.
WOOD JOIST STEEL CONCRETE
HOLLOW CORE
ACCEPTABLE ANGLE
POSSIBLE ANCHOR LATERAL TO THE CEILING OR TO THE WALL
HILTI KHEZ 3/8 X 3 1/2
418058
LATERAL BRACE
HIT S SCREEN TUBE
00068613
HY150 MAX ADHESIVE
332230
3/8" HIT A ROD
00088978
FLAT WASHER M12
000.04875
FLAT WASHER M10
000.04430
NUT 3/8-16 ZINC
000.00405
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael N/A
9 / 10
600LBS [272KG]
750LBS [340KG]
MAX. STRUT BRIDGE "SPAN"
STRUT
LIFT CAPACITY
HS 158-12
P1000
HS 2716-12
P5500
P5501
P5001
P1001
P5000
600#
1'-8"
2'-0"
3'-3"
4'-0"
5'-4"
6'-4"
8'-6"
10'-4"
STRUT BRIDGE PER TABLE
BELOW (SLOT- FACE DOWN)
"SPAN"
REF. TABLE BELOW
DUCT, PIPE
OR OTHER
OBSTRUCTION
AS OCCURS
STRUT TO BUILDING STRUCTURE
REF. PLANS AND DETAILS
B
R
A
C
E
O
R
U
C
T
U
R
E
R
E
F
P
A
N
N
D
D
E
T
A
I
L
S
BRIDGE DETAIL
Item # Part # Description Qty
000.00394 THREADED ROD 3/8-16 X 10' ZINC 21
000.00405 NUT 3/8-16 ZINC 6
TYP. ROD
HANGER PER
PLANS AND
DETAILS
1 5/8" SQUARE X 1/4" FLAT PLATE
WASHER
"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE
CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE
ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."
000.00424 HILTI STRUT SADDLE NUT 3/8-16 23
000.00425 LOCKWASHER 3/8" 2
000.04875 FLAT WASHER M12 2
000.04430 FLAT WASHER M10 ZINC 2
VERIFY IN FIELD
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SAFE WORKING LOAD BELOW LIFT:
WEIGHT FOR LOAD TEST MAY VARY DEPENDING YOUR REGION
VA BRONX
EMERGENCY DEPARTMENT
QC-09261820
26-SEP-2018
Michael N/A
10 / 10
Z
600LBS [272KG]
750LBS [340KG]
EMBEDDED X-Y CONFIG.
700-11228 - ECS to ECS wiring kit
FLUSH X-Y CONFIG.
STANDARD X-Y CONFIG.
WALL MOUNTED X-Y CONFIG.
ECS - ECS CHARGING
CONTACT BOX (3X)
ECS ON FIXED RAIL
ECS ON MOVING RAIL
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
File details come from the government source that posted it. Updated .