Addendum 1 - 7-16-2026 (002).pdf

PDF 208 KB Posted

Attached to
ECPS CLASSROOM RENOVATION
Solicitation number
RFP GIS 260000002310 2
Issued by
Genesee County, Michigan

About this file

This is Addendum 1 to the ECPS Classroom Renovation project in Michigan, issued on July 16, 2026, in response to questions submitted during the bidding process. The addendum clarifies specifications for HVAC replacement, casework materials, and associated installation responsibilities. The bid opening is scheduled for July 21, 2026, and no additional questions will be accepted after this addendum's issuance.

The addendum specifies that HVAC replacement must include VAV box, coil, and all necessary insulation for complete installation. Casework materials are designated as Wilsonart plastic laminate in 7850-60 BEIGEWOOD and Wilsonart solid surface in 9175ML AVALANCHE MELANGE. Solid surface countertops are intended for removal and reinstallation if possible. The casework or general contractor is responsible for sink and plumbing demolition and reinstallation to accommodate new casework and sinks. All cove base necessary for reinstallation around new casework shall be included in the bid submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 1

Project: ECPS Classroom Renovation

Date of Addendum: 7-16-2026

The following questions were addressed during the bidding process. No more questions will be received/ responded prior to bid opening on 7/21/2026.

1. HVAC – Replacement should include VAV box, coil, and all necessary insulation for complete install.

2. Casework – Plastic Laminate: Wilsonart, 7850-60 BEIGEWOOD

3. Solid Surface: Wilsonart 9175ML AVALANCHE MELANGE

4. Solid Surface countertops are intended to be removed and reinstalled if possible

5. Removing sink and plumbing to demolish and reinstall casework and sinks will be the responsibility of the casework or otherwise general contractor

6. All cove base necessary for re-installation around the new casework shall be included in bid

-end-