This is Construction Bid Addendum No. 01 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design & Construction Division for the Clare Welcome Center Boiler Replacement project (File Number 591/26452.AGY). The addendum was issued on October 13, 2026, with a bid opening date of October 21, 2026, and names Matthew Lusby as the MDOT Project Director. The addendum modifies the project timeline by extending the substantial completion date from December 18, 2026, to January 31, 2027. Key documentation included with this addendum comprises a prebid sign-in sheet and responses to questions raised during prebid discussions. Bidders are required to acknowledge receipt of this addendum in their bid submissions, as failure to do so may result in bid rejection.
The addendum clarifies several project specifications based on prebid inquiries. The Clare Welcome Center will utilize new temperature controls integrated with the existing system rather than stand-alone programmable controls, and no external controls contractor is currently designated. The existing roof carries no active warranty, allowing roof penetrations without restriction. The project does not employ a separate mechanical prime contractor, and bidders are responsible for identifying and engaging necessary subcontractors, including electrical contractors for equipment connections. The water source for the boiler system will remain unchanged from current conditions without implementation of a glycol system, maintaining the existing system configuration as-is.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 01
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
10/13/2026
PROJECT NAME
Clare Welcome Center – Boiler Replacement
FILE NUMBER
PROFESSIONAL
PSC Name
PROJECT DIRECTOR BID OPENING DATE:
Matthew Lusby - MDOT 10/21/2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
This Addendum is to post the prebid sign in sheet and response to some questions/discussion from the prebid
1. Prebid Sign in sheet
2. Questions
3. Changing Substantial Completion Date to 1/31/27
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL:
DATE: Click to enter date
APPROVED BY:
PROJECT DIRECTOR: Matthew Lusby DATE: 10/12/2026
591/26452.AGY
-Modify Bid Summary and Instructions to Bidders (Sect 00100 Item 23) from December 18, 2026 to January 31, 2027.
http://www.michigan.gov/SIGMAVSS
Please confirm the anticipated construction start date and substantial completion date for this project.
Substantial completion extended to 1/31/27
Please identify the existing Temperature Controls Contractor currently servicing the building, If applicable. If no existing Controls Contractor is established, please confirm whether Stand-Alone Programmable Controls are acceptable for the equipment included in our scope of work, or if a Building-Integrated Temperature
Controls System is required.
There is not currently a controls contractor, new controls to work with the existing system
Please confirm whether the existing Roof is currently under warranty. If a warranty is in place, please identify the Roofing Contractor responsible for the warranty and advise of any requirements or restrictions that may affect roof penetration associated with our scope of work.
There is not a current roof warranty
Will we be acting as Mechanical Prime on this project?
Please identify the electrical contractor selected for this project if one has been established. If not, please confirm whether a preferred electrical contractor will be designated for coordination of electrical connections to equipment furnished or installed under our scope of work.
You are responsible for all parts of the project and finding Subs as you require.
During the project meeting, it was indicated that well water is not intended to be used for the boilers due to concerns regarding its discoloration, and that a glycol system is desired. Please clarify the intended boiler water source and confirm whether a glycol system is required.
If a glycol system is required, please confirm who will be responsible for providing the glycol system design, including piping layout, system sizing, glycol concentration, and any associated equipment or components necessary for proper system operation.
We are not going to add a glycol system and will keep the system as is.