Addendum_1_-_3CA07316.pdf

PDF 2 MB Posted

Attached to
IFB 3CA07316 - Wastewater Plant Replacement Project
Solicitation number
3CA07316
Issued by
Sacramento County, San Francisco City, California

About this file

This document is Addendum One to the Invitation for Bid (IFB) No. 3CA07316 issued by the California Department of Forestry and Fire Protection (CAL FIRE) for a Wastewater Plant Replacement Project. The project involves replacing an existing 10,000 Gallons Per Day (GPD) extended aeration sludge package plant at the CAL FIRE Pilot Rock Wastewater Treatment Plant with a pre-engineered membrane bioreactor (MBR) wastewater treatment system. The mandatory pre-bid site inspection is scheduled for May 14, 2025, at 10:00 a.m., with written questions due by May 19, 2025. Bid submissions are due by May 23, 2025, at 2:00 p.m., with a bid opening on May 27, 2025. The contract term is from June 30, 2025, to May 31, 2026, with potential for a one-year extension.

The addendum outlines specific requirements for bidders, including holding a current A – General Engineering license, providing proof of Department of Industrial Relations (DIR) registration, and submitting a one-page preliminary plan for the work. Bidders must also provide references for at least three successfully completed MBR projects within the last five years. The project requires compliance with California Title 22 water quality regulations, SCADA integration for remote monitoring, and achieving specific effluent limits: Biochemical Oxygen Demand <10 mg/L, Total Suspended Solids <10 mg/L, and Total Nitrogen <10 mg/L. The bid includes a three percent Disabled Veteran Business Enterprise (DVBE) participation goal, with potential incentives for DVBE participation. Contractors must also comply with various state regulations, including the Darfur Contracting Act and Iran Contracting Act certifications.

View the file

Other files

File Type Posted
IFB_3CA07316_-_Solicitation_Documents.pdf PDF
25-0023_Attachment_1,_LABOR_CODE_CERTIFICATIONS.pdf PDF
25-0023_IFB.pdf PDF
25-0023_Attachment_2,_Noncollusion_Affidavit.pdf PDF
Cost_Proposal_Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA THE NATURE RESOURCES AGENCY Gavin Newsom, Governor

DEPARTMENT OF FORESTRY AND FIRE PROTECTION

P.O. Box 944246

SACRAMENTO, CA 94244-2460

Website: www.fire.ca.gov

(916) 653-7772

ADDENDUM ONE (1) TO:

INVITATION FOR BID, IFB #3CA07316

Wastewater Plant Replacement Project

Notice to Prospective Bidders

May 12, 2025

Please review the following Addendum to Invitation for Bid (IFB), entitled IFB 3CA07316 – Wastewater Plant Replacement Project.

1. The IFB Solicitation Bidder Minimum Qualifications are being updated and posted below.

B) Bidder Minimum Qualifications

1. The Prime Bidder must be either an individual or firm currently licensed to do business in California and provide proof of such as required in Required Attachment Checklist, Attachment 1.

2. The Prime Bidder must have a business license or incorporation papers for their respective State showing that their company is in good standing in that state, if the Prime Bidder’s base of operation is located outside the State of California and provide proof of such as required in Required Attachment Checklist, Attachment 1.

3. (If applicable) Pursuant to Public Contract Code section 2010, a person that submits a bid or proposal to […] a state agency with respect to any contract in the amount of $100,000.00 shall complete the California Civil Rights Laws, Attachment 11.

4. Contractor shall provide proof of current and valid A – General Engineering license issued by the Contractors State Licensing Board (CSLB).

5. Contractor shall provide proof of current and valid Department of Industrial Relations (DIR) Registration.

6. Contractor shall provide a one-page preliminary plan for the work to be completed listed in Sample Agreement, Exhibit A, Scope of Work. Contractor shall obtain all necessary information during the mandatory site visit.

7. Contractor shall provide references for at least three (3) successfully completed MBR projects within the last five (5) years.

8. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Sample Standard Agreement, Exhibit A, Scope of Work, Section 9. This requirement has also been added in the Sample Standard Agreement, Exhibit E, Section 5. Refer to Section C, Bid Requirements and Information, Contractor License, for submittal requirements.

9. Failure of Bidder to sufficiently provide any or all of the minimum qualifications, in the opinion of CAL FIRE, will result in the Bidder’s bid deemed non-responsive.

Sam ple

2. The IFB Required Attachment Checklist has been updated and posted below.

REQUIRED ATTACHMENT CHECKLIST

A complete bid or bid package will consist of the items identified below.

Complete this checklist to confirm the items in your bid. Place a check mark or “X” next to each item that you are submitting to the State. For your bid to be responsive, all required attachments must be returned. This checklist should be returned with your bid package also.

Attachment Attachment Name/Description _____ Attachment 1 Required Attachment Checklist

_____ Attachment 2 Bid/Bidder Certification Sheet

_____ Attachment 3 Rate Sheet

_____ Attachment 4 Disabled Veteran Business Enterprise Declarations (STD 843) * https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/pd_843.pdf

_____ Attachment 5 Bidder Declaration (GSPD-05-105)* https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf

_____ Attachment 6 DARFUR Contracting Act (CAL FIRE-720)

_____ Attachment 7 Iran Contracting Act (DGS PD 3)* https://www.documents.dgs.ca.gov/dgs/FMC/GS/PD/PD_3.pdf

_____ Attachment 8 Payee Data Record (STD 204) http://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

_____ Attachment 9 Contractor Certification Clauses (CCC 04/2017) https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-

042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE

_____ Attachment 10 Target Area Contract Preference Act (TACPA) *

_____ Attachment 11 California Civil Rights Laws Attachment*

_____ Attachment 12 Non-Collusion for Public Works*

_____ Attachment 13 Quotes from SB/DVBE Subcontractors*

_____ Additional Required Information:

1. The Prime Bidder must be either an individual or firm currently licensed to do business in California.

2. The Prime Bidder has a business license or incorporation papers for their respective State showing that their company is in good standing in that state, if the Prime Bidder’s base of operation is located outside the State of California.

3. Provide proof of current and valid A – General Engineering license issued by the Contractors State Licensing Board (CSLB).

4. Provide proof of current and valid Department of Industrial Relations (DIR) Registration.

5. Contractor shall provide references for at least three (3) successfully completed MBR projects within the last five (5) years.

6. Contractor shall provide a one-page preliminary plan for the work to be completed listed in Sample Agreement, Exhibit A, Scope of Work.

Contractor shall obtain all necessary information during the mandatory site visit.

*If applicable https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/pd_843.pdf https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://www.documents.dgs.ca.gov/dgs/FMC/GS/PD/PD_3.pdf http://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE

3. The Sample Agreement STD 213 is being updated and is attached to and made a part of this IFB Addendum.

Updates are below.

9. Project Overview A. The current system is an existing 10,000 GPD extended aeration package plant.

B. Contractor shall provide a pre-engineered MBR wastewater treatment system.

C. Contractor shall ensure selected system is in compliance with California Title 22 water quality regulations and provide SCADA integration for remote monitoring and automation.

D. Effluent Limits are listed below.

1) Biochemical Oxygen Demand (BOD): <10 mg/L

2) Total Suspended Solids (TSS): <10 mg/L

3) Total Nitrogen (TN): <10 mg/L

E. Additional Requirements are listed below:

1) Contractor shall complete removal of existing plant.

2) Contractor shall be responsible for site preparation, including foundation, piping, electrical, and Supervisory Control and Data Acquisition (SCADA) integration.

3) Contractor shall provide temporary wastewater treatment during installation.

4) Contractor shall perform all work in compliance with state and federal wastewater regulations.

5) Contractor shall provide operator training and system commissioning.

6) Contractor shall obtain all necessary information during site visit to provide a one-page preliminary plan for the work to be completed upon bid submission.

7) Contractor shall provide project drawings, plans, and specifications.

8) Contractor shall include the contract number on the title sheets of the Plans and Specifications produced to satisfy the requirements of the contract.

9) Contractor shall submit required applications and pay associated fees to obtain required permits.

10) No work shall be performed until all necessary plans and permits have been approved.

10. Detailed Scope of Work A. System Design and Performance Requirements

1) The new MBR treatment system must include fine screening, aeration, biological nutrient removal (BNR), membrane filtration, and disinfection.

2) The SCADA system must allow remote monitoring, alarms, and automated data logging.

3) Contractor shall ensure the system must be modular and scalable for future expansion.

B. Demolition and Site Preparation

1) Contractor shall complete decommissioning and removal of the existing WWTP.

2) Contractor shall complete excavation, grading, and foundation construction for the new plant.

3) Contractor shall complete installation of new influent/effluent pipelines.

C. Temporary Wastewater Treatment

1) Contractor shall design and implement a temporary wastewater treatment system during the transition.

2) Contractor shall ensure temporary system meets regulatory effluent discharge standards.

D. Procurement and Fabrication

1) Contractor shall complete manufacturing and pre-testing of the pre-engineered MBR system.

2) Contractor shall complete Factory Acceptance Testing (FAT) before delivery.

E. Installation and SCADA Integration

1) Contractor shall provide delivery and installation of the new MBR treatment system.

2) Contractor shall provide SCADA system setup for remote monitoring and automation.

3) Contractor shall process piping, electrical, and control system integration.

F. Testing, Commissioning, and Training

1) Contractor shall complete Site Acceptance Testing (SAT) to ensure compliance with effluent discharge limits.

2) Contractor shall provide Operator training on SCADA operation, routine maintenance, and emergency procedures.

3) Contractor shall provide submission of approved as-built drawings, O&M manuals, and warranties.

1. Regulatory Compliance and Permitting A. Contractor shall coordinate with regulatory agencies for permit amendments.

B. Contractor shall ensure compliance with California Water Board regulations.

C. Contractor shall provide approved plans to obtain necessary building, electrical, and environmental permits.

2. Contractor Qualifications and Experience Contractor must have documented experience in the following:

A. Designing and installing MBR wastewater treatment systems.

B. SCADA system integration and automation.

C. Regulatory compliance with California wastewater standards.

3. Additional Considerations A. System Redundancy: Contractor shall ensure backup blowers, pumps, and membrane cassettes must be included.

B. Operational Scalability: Contractor shall ensure the system will allow for future capacity expansion.

C. Ease of Maintenance: Contractor shall ensure access to key components must be optimized for efficient operation.

D. Energy Efficiency: Contractor shall ensure the installed system will integrate Variable Frequency Drives (VFDs) for optimized power consumption.

E. All components, debris, and trash shall be removed from the site upon completion of work.

4. Warranty Criteria A. Contractor shall ensure a General Equipment Warranty of two (2) years.

B. All mechanical and process equipment, including membranes, shall be guaranteed to be free of defects in materials and workmanship for two (2) years.

C. The Contractor shall cover 100% of costs for any required repairs or replacements due to defects.

D. Repairs and replacements must be completed within 14 calendar days of failure notification.

E. Contractor shall provide a Performance and Process Guarantee.

F. The system must meet the specified effluent criteria for at least two (2) years under normal operating conditions.

G. If the system fails to meet performance standards, the Contractor is responsible for remediation.

H. Contractor shall provide an Extended Warranty for Membrane Modules

I. After the initial 2-year full coverage warranty, a prorated membrane replacement plan shall apply.

J. The Contractor shall cover 100% of replacement costs for the first two (2) years, then gradually decrease by 20% per year until the seventh (7th) year.

K. Replacement membranes must be latest generation models, provided within 14 days of notification.

L. Contractor shall provide an Ultraviolet (UV) Disinfection System Warranty

M. UV disinfection components must have a two (2) year warranty.

N. UV lamps must be warranted for a minimum of 12,000.00 operating hours.

4. An updated copy of the full IFB Solicitation document can be found below. Changes are highlighted in red.

The contact person for this Addendum and the IFB Solicitation is:

Gloria Pietromonaco Department of Forestry and Fire Protection gloria.pietromonaco@fire.ca.gov

Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum.

Jean Vasquez Jr.

Contracts Analyst

UPDATED IFB SOLICITATION AND EXHIBITS

ATTACHED BELOW

mailto:gloria.pietromonaco@fire.ca.gov

STATE OF CALIFORNIA - THE NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor

CONSERVATION IS WISE-KEEP CALIFORNIA GREEN AND GOLDEN

PLEASE REMEMBER TO CONSERVE ENERGY. FOR TIPS AND INFORMATION, VISIT “FLEX YOUR POWER” AT WWW.CA.GOV

CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION

P.O. Box 944246

SACRAMENTO, CA 94244-2460

(916) 653-7772 Website: www.fire.ca.gov

Invitation for Bid Notice to Prospective Bidders

#3CA07316 Wastewater Plant Replacement Project

May 6, 2025

You are invited to review and respond to this Invitation for Bid (IFB). In submitting your bid, you must comply with these instructions. In addition to those programs and preferences that are specified in this solicitation, Prospective Contractors are encouraged to consider programs and preferences that are available, such as those for the use of small businesses, disadvantaged businesses, disabled veteran businesses, and other businesses covered by State and Federal programs and preferences.

On March 04, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

The DVBE Participation Program applies, and a three percent (3%) goal is required for this IFB. The DVBE Incentive Program may also apply to this IFB. See Section D, Special Programs, Item 1, in this IFB for requirements.

As required by Executive Order S-02-06, the California Department of Forestry and Fire Protection (CAL FIRE) is committed to meeting the State’s 25 percent (25%) Small Business (SB) participation goal.

Certified SBs, Micro Businesses (MB), and contractors willing to commit to subcontracting a minimum of 25 percent (25%) of their net bid price to certified SBs or MBs (if applicable), are encouraged to submit bids. See Section D, Special Programs, Item 2, in this IFB for requirements.

Note that all agreements entered into with the State of California will include by reference General Terms and Conditions (GTC 02/2025) and Contractor Certification Clauses that may be viewed and downloaded at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language. If you do not have Internet access, a hard copy can be provided by contacting the person listed below.

This contract requires Prevailing Wages if the total bid amount exceeds $1,000.00. If the total bid amount is under $1,000.00, then Prevailing Wage language will be removed prior to award. Refer to Sample Standard Agreement, for requirement details.

In the opinion of California Department of Forestry and Fire Protection (CAL FIRE), this IFB is complete and without need of explanation. However, if you have questions, or should you need any clarifying information, the contact person for this IFB is:

Gloria Pietromonaco California Department of Forestry and Fire Protection gloria.pietromonaco@fire.ca.gov http://www.fire.ca.gov/ https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language

STATE OF CALIFORNIA - THE NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor

CONSERVATION IS WISE-KEEP CALIFORNIA GREEN AND GOLDEN

PLEASE REMEMBER TO CONSERVE ENERGY. FOR TIPS AND INFORMATION, VISIT “FLEX YOUR POWER” AT WWW.CA.GOV

Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum.

Technical questions regarding this solicitation will be addressed, in writing, and in accordance with the Questions and Answers portion of this IFB. See Section C, Item 1, Key Action Dates for more details.

Gloria Pietromonaco Contract Analyst

Invitation for Bid Number 3CA07316

CAL FIRE

Table of Contents

A) Purpose and Description of Services 5 B) Bidder Minimum Qualifications 5 C) Bid Requirements and Information 5

1. Key Action Dates 5

2. Mandatory Pre-Bid Walk-Through 5

3. Written Question and Answer Period 6

4. Costs Included in Bid Rates 6

5. Employment of undocumented Workers 6

6. State General Prevailing Wage Rates 6

7. Postconsumer Content Certification 6

8. Mandatory Organic Waste Recycling 6

9. Motor Carrier Permit Requirements 7

10. Contractor Registration Program 7

11. Contractor’s License 7

12. Subcontractors 7

13. Non-Collusion Declaration for Public Works 7

14. Bonds 7

15. Insurance 8

16. California Civil Rights Law 8

17. Darfur Contracting Act 8

18. Iran Contracting Act 9

19. Submission of Bids 9

20. Bid Opening 10

21. Evaluation and Selection 10

22. Award and Protest 11

23. Disposition of Bids 11

24. Standard Conditions of Service 11

25. Generative Artificial Intelligence (GenAI) 12

D) Special Programs 12

1. Disabled Veteran Business Enterprise (DVBE) Program Requirement 12

2. Small Business (SB) or Microbusiness (MB) Preference 14

3. Commercially Useful Function 14

4. CAL FIRE Advocates 14

5. Target Area Contract Preference Act (TACPA) 14

E) Required Attachments 15

1. Required Attachment Checklist 15

2. Bid/Bidder Certification Sheet 17

3. Rate Sheet 19

4. Disabled Veteran Business Enterprise Declarations (STD 843) 21

5. Bidder Declarations (GSPD-05-105) 22

6. Darfur Contracting Act Certification (CAL FIRE-720) 23

7. Iran Contracting Act Certification (DGS PD 3) 25

8. Payee Data Record (STD 204) 26

9. Contractor Certification Clauses (CCC 04/2017) 27

10. Target Area Contract Preference Act (TACPA) 28

11. California Civil Rights Laws Attachment 29

12. Non-Collusion for Public Works 30

13. Quotes from SB/DVBE Subcontractors 31

F) Proposed Form of Agreement 32 STD213 Sample Standard Agreement 32

A) Purpose and Description of Services Contractor agrees to provide to the California Department of Forestry and Fire Protection (CAL FIRE) a pre-engineered package membrane bioreactor (MBR) wastewater treatment system, as described herein:

Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees to replace the existing 10,000 Gallons Per Day (GPD) extended aeration sludge package plant at the CAL FIRE Pilot Rock Wastewater Treatment Plant (WWTP).

B) Bidder Minimum Qualifications

1. The Prime Bidder must be either an individual or firm currently licensed to do business in California and provide proof of such as required in Required Attachment Checklist, Attachment 1.

2. The Prime Bidder must have a business license or incorporation papers for their respective State showing that their company is in good standing in that state, if the Prime Bidder’s base of operation is located outside the State of California and provide proof of such as required in Required Attachment Checklist, Attachment 1.

3. (If applicable) Pursuant to Public Contract Code section 2010, a person that submits a bid or proposal to […] a state agency with respect to any contract in the amount of $100,000.00 shall complete the California Civil Rights Laws, Attachment 11.

4. Contractor shall provide proof of current and valid A – General Engineering license issued by the Contractors State Licensing Board (CSLB).

5. Contractor shall provide proof of current and valid Department of Industrial Relations (DIR) Registration.

6. Contractor shall provide a one-page preliminary plan for the work to be completed listed in Sample Agreement, Exhibit A, Scope of Work. Contractor shall obtain all necessary information during the mandatory site visit.

7. Contractor shall provide references for at least three (3) successfully completed MBR projects within the last five

(5) years.

8. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Sample Standard Agreement, Exhibit A, Scope of Work, Section 9. This requirement has also been added in the Sample Standard Agreement, Exhibit E, Section 5. Refer to Section C, Bid Requirements and Information, Contractor License, for submittal requirements.

9. Failure of Bidder to sufficiently provide any or all of the minimum qualifications, in the opinion of CAL FIRE, will result in the Bidder’s bid deemed non-responsive.

C) Bid Requirements and Information

1. Key Action Dates

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time

(Pacific Time)

IFB available to prospective bidders May 06,2025 Mandatory Site Inspection May 14, 2025 10:00 a.m.

Written Question Submittal May 19, 2025 Final Date and Time for Bid Submission May 23, 2025 02:00 p.m.

Bid Opening May 27,2025 11:00 a.m.

2. Mandatory Pre-Bid Walk-Through

A. A mandatory pre-bid walk-through is scheduled at 10:00 a.m. on May 14, 2025, for the purpose of viewing the site and discussing concerns regarding this IFB.

Please notify Gloria Pietromonaco at gloria.pietromonaco@fire.ca.gov to confirm attendance no later than May 13, 2025.

Sam

The meeting site is CAL FIRE Pilot Rock Fire Center located at 23495 North Miller Road, Hesperia, CA 92345.

B. In the event a potential prime contractor is unable to attend the mandatory pre-bid walk-through, an authorized representative may attend on their behalf. The representative may only sign-in for one (1) company. Subcontractors may not represent a potential prime contractor at a mandatory pre-bid walk-through. No bid will be accepted unless the bidder or his authorized representative was in attendance.

3. Written Question and Answer Period A. Potential Bidders who attended the mandatory pre-bid walk-through may submit written questions regarding the bid by May 19, 2025. All questions should be emailed in writing to gloria.pietromonaco@fire.ca.gov NO QUESTIONS will be entertained after May 19, 2025.

B. Written questions must include: the individual's name, firm name, complete address and must reference IFB No. 3CA07316.

C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website (https://caleprocure.com/pages/index.aspx). It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to this IFB, Section C1, Key Action Dates, for the schedule of events and dates/times. It is the responsibility of the bidder to check Cal eProcure for all addenda. Bidder can contact the Contract Analyst named above.

4. Costs Included in Bid Rates Bid prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be paid unless separate payment provisions in the Agreement should specifically provide otherwise.

5. Employment of undocumented Workers No State agency or department, as defined in California Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a Public Works Agreement, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).

6. State General Prevailing Wage Rates State General Prevailing Wage Rates will apply for the County(ies) of San Diego as described in the attached Sample Standard Agreement, Section E. The predetermined general prevailing wage rates published by the Director of Industrial Relations may be obtained via the Internet:

https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. It is the bidder's responsibility to use the correct classification determination published by the Department of Industrial Relations.

7. Postconsumer Content Certification Your signature affixed hereon and dated on the Bid/Bidder Certification Sheet, Attachment 2 shall signify that you are aware of the recycle materials, goods, and supplies program requirements of Public Contract Code Sections 12200 and 12205, and that the Recycled-Content Certification will be required for the successful contractor. The awarded bidder will be required to complete a Postconsumer-Content Certification (CalRecycle 74) and provide the form with the signed Agreement. An incomplete form or failure to provide a completed form will result in cancellation of the Agreement. The Postconsumer-Content Certification can be downloaded at https://calrecycle.ca.gov/buyrecycled/.

8. Mandatory Organic Waste Recycling The Contractor generating organic waste or commercial solid waste shall arrange for the recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction's franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit or abrogate the Contractors right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Sections 42649.8 et seq

Sam ple mailto:gloria.pietromonaco@fire.ca.gov https://caleprocure.com/pages/index.aspx https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm https://calrecycle.ca.gov/buyrecycled/

9. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and 34620 require

Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement the any such required MCP(s).

B. The MCP(s), if any, required for the Contractor's Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with the Contractor for the duration of this Agreement. Upon request of CAL FIRE, the Contractor must immediately provide to CAL FIRE a copy of the required MCP(s), if any.

10. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a bid proposal for a public works contract unless registered with the Department of Industrial Relations (DIR), pursuant to Labor Code Section 1725.5 with limited exceptions from this requirement for bid purposes only under LC Section 1771.1(a)).

B. No Contractor or Subcontractor may be awarded a public works contract or commercial service contract requiring prevailing wages, unless registered with DIR pursuant to Labor Code Section 1725.5.

C. CAL FIRE will verify each of the registration numbers prior to contract award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

13. Contractor’s License Bidder must have, at time of bid submittal and for the duration of the contract, a valid, current A – General Engineering license issued by the Contractors State License Board (CSLB), for the type of work to be performed. Bidder shall obtain, pay for and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met.

An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by CAL FIRE (reference Business and Professions Code Section 7028.15).

14. Subcontractors Bidder may subcontract portions of the work as defined in the attached Sample Standard Agreement. If subcontractors are used, complete the Bidder Declaration (GSPD–05-105), Attachment 5. Bidder must ensure that the subcontractor(s) will have all necessary licenses, permits, and/or certifications to accomplish its portion of the work. Failure of a subcontractor(s) to have the proper licenses, permits, and/or certifications, shall be cause for rejection of bid. The Bidder Declaration can also be downloaded at which can be downloaded at https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf.

15. Non-Collusion Declaration for Public Works Bidder must submit, as described herein, a non-collusion declaration for Public Works. The non-collusion declaration is attached to this IFB as Attachment 12. Failure to submit a complete declaration shall result in rejection of the bid.

16. Bonds A. Bidder’s Bond is required for Bids $903,000 and greater: Bidder shall submit a *bid bond (executed by an admitted surety insurer) with bid as described herein. The bidder’s bid bond shall be no less than 10 percent (10%) of bidder’s total bid, must be notarized and include the embossed surety seal and must include a Power of Attorney if the signee is not an officer of the surety. Submittal of a bid bond that is not in the appropriate amount, signed and stamped with the surety seal, or failure to submit a bid bond shall be cause for rejection of bid. *The bidder may also submit, in lieu of a Bidder’s Bond, one of the following forms of bidder’s security: cash, cashier’s check, or certified check made payable to CAL FIRE.

B. Payment Bond (STD 807) Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may

Sam https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the CAL FIRE representative not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies CAL FIRE may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.

17. Insurance A. The bidder, who receives the Agreement award, must provide a Certificate of Insurance providing proof of insurance to the Business Service Office (BSO) within ten (10) working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Sample Standard Agreement Exhibit E, Section 1 for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

CAL FIRE, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Available Coverages/Limits In the event the insurance coverages obtained by the Contractor is broader in scope than, and/or the limits are higher than, those required under the contract, all such broader coverage and/or higher limits available to the Contractor shall also be available and applicable to the State.

E. In the case of Contractor and/or Permittee’s utilization of subcontractors to complete the contracted scope of work, contractor and/or Permittee shall include all subcontractors as insured under Contractor and/or Permittee’s insurance or supply evidence of insurance to The State equal to policies, coverages and limits required of Contractor and/or Permittee.

18. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew a contract with, a state agency with respect to any contract in the amount of one hundred thousand dollars ($100,000.00) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the contract is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification, as Attachment 11 completed, signed, and returned with its bid or proposal.

19. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification, CAL FIRE-720, Attachment 6 and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the CAL FIRE-720.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot bid on, or submit a bid or proposal for an Agreement with a State agency for goods or services. (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had business activities or other operations outside of the United States to certify that it is not a “scrutinized” company when it submits a bid or proposal to a State agency.

E. A scrutinized company may still; however, submit a bid or proposal for an Agreement with a State agency for goods or services if the company first obtains permission from the Department of General Services according to the criteria set forth in Public Contract Code Section 10477(b).

20. Iran Contracting Act A. Pursuant to the Iran Contracting Act of 2010 (Pub. Cont. Code Sections 2200 et seq., hereinafter “the Act”), persons identified on the list established under Public Contract Code Section 2202.5 (hereinafter “List”) are ineligible to bid on, submit a proposal for, enter into, or renew any contract with the State for goods or services of one million dollars or more.

B. Any person who submits a bid or proposal must complete and submit to CAL FIRE with its bid proposal, the Iran Contracting Act Certification (DGS PD 3), Attachment 7, certifying that it is not on the most current List unless the person is exempted from the certification requirement by Public Contract Code Section 2203(c) or (d). If claiming an exemption, the person shall provide written evidence that supports an exemption under Public Contract Code Section 2203(c) or (d) with its bid or proposal. The Iran Contracting Act Certification can also be downloaded at https://www.documents.dgs.ca.gov/dgs/FMC/GS/PD/PD_3.pdf.

C. Any person, for a contract that is exempt from bidding or is renewed, or for whom a contract is otherwise awarded by the State, must complete and submit to CAL FIRE the DGS PD 3, certifying that it is not on the most current List, before the contract has been executed by the parties, unless the person is exempted from the certification requirement by Public Contract Code Section 2205(c) or (d). If claiming an exemption, the person shall provide written evidence that supports an exemption under Public Contract Code Section 2203(c) or (d), before execution of the contract.

21. Submission of Bid A. All bids must be submitted and received under sealed cover and sent to CAL FIRE by dates and times shown in Section C, Bid Requirements and Information, Item 1) Key Action Dates.

B. Electronic Submissions

1) Electronic bid submittals shall be sent to Bids@fire.ca.gov

2) All bid documents will be in an attachment (as a PDF). If any bid information is in the body of the email, it shall be rejected.

3) Subject line must include the Contract Number 3CA07316, Wastewater Treatment Replacement Services, May 23, 2025, 2 p.m. and Contractor Business Name.

4) The bid submission email inbox is ONLY for bid submissions, contact the contract analyst directly with contract questions.

C. Late bids will not be considered.

D. All bids shall include the documents identified in Required Attachment Checklist, Attachment 1. Bids with incomplete documents or not including the proper "required attachments" shall be deemed non-responsive. A non-responsive bid is one that does not meet the basic bid requirements.

E. All documents requiring a signature must bear an original signature of a person authorized to bind the bidding firm.

F. Bids must be submitted for the performance of all the services described herein. Any deviation from the work specifications will not be considered and will cause a bid to be rejected.

G. A bid may be rejected if it is conditional or incomplete, or if it contains any alterations of form or other irregularities of any kind. The State may reject any or all bids and may waive an immaterial deviation in a bid. The State's waiver of immaterial deviation shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements if awarded the agreement.

H. Costs for developing bids and in anticipation of award of the agreement are entirely the responsibility of the bidder and shall not be charged to the State of California.

I. An individual who is authorized to bind the bidder contractually shall sign Bid/Bidder Certification Sheet, Attachment 2. The signature should indicate the title or position that the individual holds in the firm. An unsigned bid may be rejected.

Sam ple https://www.documents.dgs.ca.gov/dgs/FMC/GS/PD/PD_3.pdf mailto:Bids@fire.ca.gov

J. A bidder may modify a bid after its submission by withdrawing its original bid and resubmitting a new bid prior to the bid submission deadline. Bidder modifications offered in any other manner, oral or written, will not be considered.

K. A bidder may withdraw its bid by submitting a written withdrawal request to the State, signed by the bidder or an authorized agent. A bidder may thereafter submit a new bid prior to the bid submission deadline. Bids may not be withdrawn without cause subsequent to bid submission deadline.

L. The awarding agency may modify the IFB prior to the date fixed for submission of bids by the issuance of an addendum to all parties who received a bid package.

M. The awarding agency reserves the right to reject all bids. The agency is not required to award an agreement.

N. Before submitting a response to this solicitation, bidders should review, correct all errors and confirm compliance with the IFB requirements.

O. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the agreement amount will be made due to a lack of careful examination of work sites and specifications.

P. The State does not accept alternate contract language from a prospective Contractor. A bid with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC) are not negotiable. The GTC may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.

Q. No oral understanding or agreement shall be binding on either party.

R. Bidder must complete and submit to the awarding agency Payee Data Record, STD 204, Attachment 8, to determine if the Contractor is subject to state income tax withholding pursuant to California Revenue and Taxation Code Sections 18662 and 26131. This form can be found on the Internet at http://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf under the heading STANDARD FORMS; select “Forms Search” and enter the form number “204”. No payment shall be made unless a completed STD 204 has been returned to the awarding agency.

S. Bidder must sign and submit to the awarding agency, Contractor Certification Clauses (CCC), Attachment 9, which can be found on the Internet at:

https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC- 042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE.

22. Bid Opening A. Bid openings will be held virtually only.

B. Public Bid Opening dial in information:

1) Dial in: 650-564-3271

2) Phone Conference ID: 601 805 066#

23. Evaluation and Selection A. At the time of bid opening, each bid will be checked for the presence or absence of required information in conformance with the submission requirements of this IFB.

B. The State will evaluate each bid to determine its responsiveness to the published requirements.

C. Bids that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, may be rejected.

D. Award if made, will be to the lowest responsive responsible bidder.

E. In the event of a tie bids, the award will be determined by a coin toss. The coin toss will be held in the State Agency’s headquarters area office. This is a public event, which the bidders will be invited to attend. The selection of the Contractor will be at the sole discretion of the State.

Sam ple https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language http://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE

24. Award and Protest A. Whenever an agreement is awarded under a procedure, which provides for competitive bidding, but the agreement is not to be awarded to the low bidder, the notification must be “by telegram, electronic facsimile transmission, overnight courier, Internet transmission, or personal delivery.” (PCC § 10345(a).)

B. On written request from any bidder, the awarding agency must post a notice of the proposed contract award in a place accessible by the general public, including any Internet site identified in the IFB at least five working days prior to awarding the contract. (PCC § 10345(a)(1).)

C. If any bidder, prior to the award of agreement, files a protest with the Department of General Services, Office of Legal Services, 707 Third Street, 7th Floor, Suite 7-330, West Sacramento, CA 95605 and CAL FIRE, on the grounds that the (protesting) bidder is the lowest responsive responsible bidder, the agreement shall not be awarded until either the protest has been withdrawn or the Department of General Services has decided the matter.

D. Within five (5) days after filing the initial protest, the protesting bidder shall file with the Department of General Services and the awarding agency a detailed written statement specifying the grounds for the protest. The written protest must be sent to the Department of General Services, Office of Legal Services, 707 Third Street, 7th Floor, Suite 7-330, West Sacramento, California 95605. A copy of the detailed written statement should be mailed to the awarding agency. It is suggested that you submit any protest by certified or registered mail.

California Department of Forestry and Fire Protection Office of Business Services, Contracts Unit Attention: Gloria Pietromonaco 710 Riverpoint Court West Sacramento, CA 95605 Email: gloria.pietromonaco@fire.ca.gov

Department of General Services Office of Legal Services Attention: Bid Protest Coordinator 707 Third Street, 7th Floor, Suite 7-330 West Sacramento, CA 95605 Phone Number: (916) 376-5080 Email: OLSProtests@dgs.ca.gov

25. Disposition of Bids A. Upon bid opening, all documents submitted in response to this IFB will become the property of the State of

California and will be regarded as public records under the California Public Records Act (Government Code Section 6250 et seq.) and subject to review by the public.

B. Bid packages may be returned only at the bidder's expense unless such expense is waived by the awarding agency.

26. Standard Conditions of Service A. After award of the Agreement and execution of the Agreement, should the Contractor fail to commence work within five (5) working days after notification of the starting date, or suspend work for a period of five (5) continuous working days after work has begun, CAL FIRE may provide five (5) calendar days written notice, posted at the job site or mailed to the Contractor, to timely prosecute and complete the work or the Agreement may be terminated and liquidated damages assessed for administrative costs for re-bidding the work or awarding the work to another Contractor. In addition, that Contractor shall be liable to CAL FIRE for the difference between the Contractor’s bid price and the actual cost of performing the work by the second low bidder or by another Contractor.

B. All performance under the Agreement shall be completed on or before the termination date of the Agreement.

C. Antitrust Provisions

1) The Contractor offers and agrees and will require all of his other subcontractors and suppliers to agree to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC section 15) or under the Cartwright Act [Chapter 2, commencing with section 16700, of Part 2 of Division 7 of the Business and Professions Code] arising from purchases of goods, services, or materials pursuant to the public works contract or subcontract. The assignment made by the contractor and all additional assignments made by the subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to the Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.

Sam ple mailto:OLSProtests@dgs.ca.gov

2) If an awarding body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, on demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the bid price, less the expenses incurred in obtaining that portion of the recovery. On demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action.

D. If the bidder is awarded the Agreement and refuses to sign the Agreement presented for signature within the time and manner required, the bidder will be liable to CAL FIRE for actual damages resulting to CAL FIRE therefrom or 10 percent (10%) of the amount bid, whichever is less.

E. Loss Leader usage is prohibited in this solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in California Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

27. Generative Artificial Intelligence (GenAI) A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder / Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .