Addendum 1 23074 - MDOT Garage Structural Repairs BP4.pdf
PDF 679 KB Posted
- Solicitation number
- RFQ - 171 - 240000000009
- Issued by
- Kalkaska County, Michigan
About this file
This document is Addendum 1 to the bidding documents for the MDOT Garage Structural Repairs - Bid Package #4 project in Kalkaska, Michigan. The addendum provides pre-bid meeting minutes and a sign-in sheet. The project scope involves structural repairs to an MDOT garage. Bids are due on October 25, 2023 at 2:00 pm and must be submitted electronically through the SIGMA VSS system. The construction period is 60 calendar days from the preconstruction meeting to substantial completion, with liquidated damages of $500 per day for delays. Contractors may close off spaces as needed to complete the work in a timely manner, and must follow specified work hour restrictions.
The bid documents include a $5,000 contingency allowance, and no alternates. Bid security of 5% is required. Contractors are responsible for obtaining and paying for any required LARA permits. Questions are due by October 19, 2023 at 2:00 pm and should be emailed to the project contact, Dan Elliott of Restore Consulting.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
10/20/2023
PROJECT NAME
MDOT Garage Structural Repairs - Bid Package #4, Kalkaska
FILE NUMBER
591/23074.CTS
PROFESSIONAL
Restore Consulting, LLC - Dan Elliott
PROJECT DIRECTOR
Chris Schanbeck
BID OPENING DATE:
10/25/2023
ADDENDUM ITEMS:
1. Attached are the pre-bid meeting minutes and sign-in sheet.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Dan Elliott DATE: 10/20/2023
APPROVED BY:
PROJECT DIRECTOR: Chris Schanbeck DATE: 10/20/2023 http://www.michigan.gov/SIGMAVSS
Restore Consulting, LLC | 313.RESTORE (313.737.8673) | info@restoreces.com
PREBID MEETING MINUTES
Project: MDOT Garage Structural Repairs – Bid Package #4 Date: October 17, 2023 DTMB File No.: 591/23074.CTS Time: 10:30 am MDOT Program No.: F000836CON Location: Kalkaska Garage Restore Project Number: 2023-1001 Attendees: Tom Kost (Kost Contracting), Chase Griffin (Tip of the Mitt Welding), TJ Waterman (Tip of the Mitt Welding), Val Woodruff (MDOT), Tim Heine (Ripman Construction), Edward Kubaszak (Pullman), Neil Salisbury (Ferro Erectors), Dan Elliott (Restore Consulting) cc: Mark Postma (Restore Consulting)
I. General / Schedule
A. Bid documents are available on SIGMA.
B. Execute and include all required forms and documents, refer to Bidders Checklist.
C. $5,000 contingency allowance is included on bid form.
D. No alternates.
E. Bid security required (5%)
F. Bids are due on October 25, 2023 at 2:00 pm
G. Bids shall be submitted electronically to SIGMA VSS.
1. Don’t wait until last minute to submit your bid due to potential issues with SIGMA.
H. Deadline for questions is October 19, 2023 at 2:00 pm. Submit questions in writing to Dan Elliott at delliott@restoreces.com.
I. Construction time is 60 calendar days from preconstruction meeting to substantial completion.
J. Liquidated damages are included in the contract at $500 per day.
II. Scope of Work:
A. The scope of work for the column repairs was discussed.
B. A brief walkthrough was completed to review the repair locations and scope of work.
III. Construction Phasing / Staging
A. Contractor may close off as many spaces as needed (within reason) to complete the work in a timely manner.
B. Work hours were discussed. Refer to spec section 01010 – Summary of Work for a description of work hours. Prior to November 13th, work shall be performed during the hours of 6:00 am to 4:30 pm
Monday thru Thursday. Starting November 13, work shall be performed during the hours of 6:00 am to 2:30 pm Monday thru Friday.
IV. Permits
A. Contractor is responsible for obtaining and paying for permits required by LARA.
mailto:delliott@restoreces.com
く9 茎 一 〇〇i �ミ 吋 へ 道 や 善し �i J 、〇号 善 事 Q 、♀ _くこ 、● � �ゝ 〔⊃ 心 と Q 6 ーiiヽ ミ J 、 〔 ① ゝ し. !し き �i o Q 一′, 憾 き る) o) 」 �ざ 3 ヽ $ I._ iこ} ぷ l 喜 寿 鷲 �ざ ¥J 愚 意∴ >- ‡ � � � � 貧
し
〇 〇
〇
ノ
し
蔓
尊
意
う
く り _く
鳥
く ,.〇
〇 一
ヾ .2
縛
も
}ヽ
I ∽
く ノ
N l � l � 嘗
{ ぐ
季 吟
や
キ ト
へ
丁
く ミ ヽ
~ヽ
ふ き
し 熊 q
こ
手 玉
も l
会 l
S
I
患
へ
I
ヽ e
こ
〇
〇
ト
へ
N
も e く
鴇
〕《 ⊆ 邑 �寒 ヾ C �圭毒 手 王 寺 �ミミ 「巨 も �ト ○ ○ �七 くく く3 事 く さ し. �し 沙 す ご �蕊 � � � � o U �
む せ
害
く ゝ 宇
ミ
く
ど
怠 o � 七 宝
_玉
山 櫨
. つ α
J ` � ぜ
し
ヽ ヽ
ヽ
ま モ ヾ
く こ o ● 二 王 く
エ
竜 で
ミ
き
ミ
筒
と
ド
義
ヽ 専
ミ
二
惑
一〕〇一幾同d∈8.Sき里○〕S聖二c卜嵩卜の卜.雷m)山∝○トS山千こ末一∪士、ぎー〕一つSuOU聖○〕S茎
∪∞e」eOe盲e茎eと三〇-〕8○○
∈eO∽‥O書‥o王手
の乙ON、卜葛」①qOぢ○$〕きき
さ〇十繊O乙誉oq重さこきOf○○d
茎e∞e七のdp登~‡邑登一e≒〕号」〕SSe∞空きOト○○∑‥}U里○○d
掌も①∑P享らしd三〇番王も∽eO∞u-}8∑
合α○○山飯山oこく合冨山トトく0享一十山田茎
File details come from the government source that posted it. Updated .