Addendum 1 230003C001 final for posting.pdf
PDF 70 KB Posted
- Attached to
- Lane County FMS Vehicle Exhaust System
- Solicitation number
- S-24800-00007815
- Issued by
- Lane County, Oregon
About this file
This document is Addendum 1 to the Request for Proposals (RFP) for the Lane County FMS Vehicle Exhaust System Project Number 230003C001, issued by the Oregon Military Department (OMD) Joint Force Headquarters, Oregon National Guard Installations Division. The addendum outlines changes and clarifications to the original RFP, including the addition of a requirement for the contractor to provide system commissioning and performance testing to measure face velocity, cubic feet per minute, and motor electrical amperage under normal operating conditions. The project scope involves all labor, materials, transportation, equipment, and services necessary for the completion of the vehicle exhaust system construction work.
The addendum also states that this addendum must be acknowledged and submitted by the proposers, and that any protests of the changes made by the addendum must be submitted in writing by 10:00 am on September 11, 2023. The original terms and provisions of the RFP remain in full force and effect, except as modified by this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 230003C001 Page 1 of 1
OREGON MILITARY DEPARTMENT
JOINT FORCE HEADQUARTERS, OREGON NATIONAL GUARD
INSTALLATIONS DIVISION
1776 MILITIA WAY
P.O. BOX 14350
SALEM, OREGON 97309-5047
September 8, 2023
Installations Division
SUBJECT: Addendum 1 to Lane County FMS Vehicle Exhaust System
Project Number 230003C001
TO ALL PROSPECTIVE PROPOSERS AND ALL OTHERS CONCERNED
1. The changes, clarifications, omissions, additions, and alterations in, on, and to the proposal information and specifications shall apply to the proposals submitted for and to the project indicated above. Except as modified by this Addendum, all of the terms and provisions of the Request for Proposals (“RFP”) for the above listed project remain in full force and effect. This Addendum Number 1 supersedes all previous instructions pertaining to the items listed:
CHANGES TO RFP
2. Changes to RFP: The following changes are made to the RFP. (Where applicable, additions are indicated with bold and underlined and deletions are indicated by strikethroughs).
Responses to Questions received
1) Will the Exhaust System require Commissioning and reporting of conformance to the specified performance
(i.e., Airflow scheduled)?
RESPONSE: Post installation performance testing is required for this project. Add to the Statement of Work, Attachment A, SW-3, Principal Features, Contractor shall provide system commissioning for all of the new systems installed, measuring at a minimum the face velocity, cubic feet per minute and motor electrical amperage under a normal operating condition
3. This addendum must be acknowledged and submitted for this project. By acknowledging this addendum on RFP
Attachment A, Representations, Attestations, and Certifications, the proposer agrees they have read and understood the above mentioned changes, and have incorporated those changes into their proposal.
PROTEST OF ANY CHANGES TO THE RFP MADE BY THIS ADDENDUM MUST BE SUBMITTED IN
WRITTEN FORM VIA EMAIL TO SAM GOFF @ SAM.A.GOFF@OMD.OREGON.GOV BY 10:00 am
ON SEPTEMBER 11, 2023.
Sam Goff - CPPB
Procurement & Contract Specialist mailto:SAM.A.GOFF@OMD.OREGON.GOV