Addendum 1 21302.pdf

PDF 1 MB Posted

Attached to
472/21302. RWG; Cooper Street CF - VMS Upgrades
Solicitation number
RFQ - 171 - 220000000565
Issued by
Jackson County, Michigan

About this file

This document is an Addendum to the Bidding Documents for the Cooper Street Correctional Facility Video Management System Upgrade - Phase 1 project, issued by the Michigan Department of Technology, Management and Budget's Design and Construction Division. The Addendum provides updates and clarifications to the project scope, which includes upgrading the video management system at the Cooper Street Correctional Facility in Jackson, Michigan. It includes revised electrical drawings, camera schedules, network equipment specifications, and responses to bidder questions. The bid opening date is October 19, 2022. The project director is Rob Gruesbeck.

The Addendum specifies requirements for the electrical work, including power circuiting, panel schedules, and details for new light poles and camera installations. It also provides clarification on existing camera locations and model types to be replaced, as well as updates to the camera equipment schedule. Pricing terms, funding sources, and other commercial details are not included in this technical Addendum document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

10/14/2022

PROJECT NAME

Video Management System Upgrade – Phase 1 – Cooper Street Correctional Facility 3100 Cooper Street, Jackson, MI 49201

FILE NUMBER

472/21302.RWG

PROFESSIONAL

Commtech Design, Inc.

PROJECT DIRECTOR

Rob Gruesbeck

BID OPENING DATE:

10/19/2022

ADDENDUM ITEMS: (attach additional sheets and drawings if required) Attachments;

1. Meeting Attendance record, Pre-Bid sign-in sheets.

2. Specification 329200 -TURF AND GRASSES

3. Drawings Reissued: E-100, E-200, E-500, E-505, E-507, E-508, E-511, E-800, E-801, E-802

4. Drawings Reissued: TC101, TC106, TC107, TC108, TC110, TC111, TC112, TC204, TC205, TC211, TC212, TC304, TC305, TC312

5. Existing Camera Spreadsheet – Separate Spread Sheet

Specifications

1. Specification 28 1000

a) Add paragraph 1.09. A, 4 to read “Genetec integrator shall be Siemens. Contact Chris Tingley.

chris.tingley@siemens.com, (734) 386-6741

Drawings reissued

1. E-100: Electrical Symbols, Abbreviations, and Notes – Issued

a) Lighting fixture and pole schedule has been updated to include 25’ camera only poles.

2. E-200: Site Plan – Issued

a) Contractor shall directionally bore conduit to supply power for new light poles to be installed.

b) New camera pole to be added along south perimeter has been eliminated and new cameras are to be installed on new light pole located to the east of their original location.

c) Handholes for cameras on perimeter fence have been removed. Contractor shall direct bore to each camera location on perimeter fence.

d) Key notes 1 & 8 were changed for clarity.

e) Contractor shall remove Horner lighting control system from perimeter cabinets. Remove all hardware from the cabinet and exposed wiring. Remove exposed cabling from poles and make safe.

Key note #6.

3. E-500: 100 Administration Floor Plan – Issued

a) Contractor to install and re-feed receptacles in accordance with the circuitry shown in drawings and on panel schedule.

b) Contractor shall install new panel “UPS-A” and 10kVA UPS as shown in drawings and detail A on sheet E-500.

http://www.michigan.gov/SIGMAVSS mailto:chris.tingley@siemens.com

4. E-505: Housing Unit E – Lower Floor Plan – Issued

a) Drawing now reflects accurate existing conditions, showing there is no UPS or data rack on the lower level of Housing Unit E. There is no new equipment being added in this location.

5. E-507: Housing Unit F/G Floor Plan – Issued

a) Drawing now reflects accurate existing conditions, showing there is no UPS or data rack in indicated location.

6. E-508: Housing Unit H/I Floor Plan – Issued

a) Drawing now reflects accurate existing conditions, showing there is no UPS or data rack in indicated location.

7. E-511: Generator Building Floor Plan – Issued

a) Owner shall remove storage racks prior to construction. Key note 6 to reflect changes.

b) External shunt trip has been removed. Key note 1 has been changed to not used.

8. E-800: Details – Issued

a) Detail 4 has been added to show the intended installation method of the new Hoffman # A10R86HCR Type NEMA 3R junction boxes on exiting poles.

b) Detail 6 has been added to show details of the new Hoffman # A10R86HCR Type NEMA 3R junction boxes on exiting poles. The title of the detail has been changed for clarification.

c) Detail 3 has been modified to include the junction box part number, Hoffman # A10R86HCR. The title of the detail has been changed for clarification.

d) The titles of details 4 & 5 have been changed for clarity. References have been added

9. E-801: Details – Reissued

a) Detail 5 was redundant and has been removed.

b) References have been added to details 1 & 6.

10. E-802: Details – Issued

a) Detail 1 is no longer needed, it has been eliminated.

b) Detail 2 has been added to show the intended typical connection between the perimeter cabinets and new cameras on a pole with a base.

c) Detail 3 has been added to show the intended typical connection between the perimeter cabinets and new cameras on existing poles.

d) Detail 4 has been changed to include the new ground cable that needs to be installed in addition to the new CAT-6 cable.

11. TC101– Re-Issued

a) See change in NETWORK EQUIPMENT SCHEDULE

i. Change Item NC as shown

12. TC106 – Re-Issued

a) Add CAT-6 patch panel in rack

13. TC107 – Re-Issued

a) Add CAT-6 patch panel in racks

14. TC108 – Re-Issued

a) Make changes as shown in clouded areas.

15. TC110 - Re-Issued

b) Some cameras that were shown with “CC” symbol are existing. We removed this symbol and note that these cameras are to be removed.

c) Some cameras are shown as surface mounted where they were previously shown as drop ceiling recessed.

d) Add Keyed Note 13 about cabling. See floorplans for new cables. If no new cable is shown on the floorplans, use existing cable already installed.

16. TC111 - Re-Issued

b) Some cameras that were shown with “CC” symbol are existing. We removed this symbol and note that these cameras are to be removed.

c) Some cameras are shown as surface mounted where they were previously shown as drop ceiling recessed.

17. TC112 - Re-Issued

b) Some cameras that were shown with “CC” symbol are existing. We removed this symbol and note that these cameras are to be removed.

c) Some cameras are shown as surface mounted where they were previously shown as drop ceiling recessed.

18. TC204- Re-Issued

a) Corrected camera number to match spreadsheet.

19. TC205- Re-Issued

a) Corrected camera number to match spreadsheet.

20. TC211 - Re-Issued

a) Corrected camera number to match spreadsheet.

21. TC212 – Re-Issued

a) Building E

i. Camera 2302 was previously numbered 2303

ii. There was an existing camera shown on the front of this building which was actually new.

See on TC312

b) Education bldg..

i. Added an existing camera to this bldg..

22. TC304 -Re-issued

a) Corrected camera number to match spreadsheet.

23. TC305 -Re-issued

a) Corrected camera number to match spreadsheet.

24. TC312 – Re-Issued

a) Site Plan updated with (2) new 4k exterior cameras JCS-0242 & 0243 on pole adjacent to laundry/strip shack

b) See cameras 2503 and 2504 which are existing cameras that shall be replaced at the Gun Range.

Questions:

1. Camera JCS-2224 and JCS 2225 on page TC110 indicates CH. On the Camera Equipment Schedule is shows “not used” what camera model do you want?

Answer. Refer to TC110, JCS-2224 is camera model ‘CE’, JCS-2225 and JCS-2226 are camera model ‘CC’

2. In drawing TC108, it shows the NB switch stacking with the NC switch. But the 9300X-24Y and 9300L-48PF- 4X do not stack. Should we revise this NC switch to a 9300-48P so it can stack like the diagram?

Answer. See TC101. Change item NC to C9300-48P. similar change shall be made to Specification 28 6200.

3. Is Camera JHS-1102 on page TC108 being mounted with a parapet mount?

Answer. There is an existing mount on the building. Adjust mount to fit new camera

4. Is new camera JCS-1125 replacing all four existing JCS-1125?

Answer. Refer to updated camera spreadsheet. Existing camera JCS-1125 is (1) 360° camera with

(4) lens to be replaced, not (4) cameras to be replaced

5. JCS-1216, 1217, 1218 is repeated three times each. Are they getting deleted, or should they be renumbered?

Answer. Refer to updated camera spreadsheet. Existing cameras JCS1216, 1217, 1218 are individual cameras with (4) lens to be replaced, not (4) cameras to be replaced.

6. On TC110 is camera JCS-1305 a new camera?

Answer. Refer to TC110, TC212, TC312, JCS-1305 is an existing camera that shall remain

7. Camera 2131 and 2132 are not shown on existing camera list. Are they new cameras?

Answer. Refer to updated camera spreadsheet, and TC204, TC304, cameras are existing to be replaced with new cameras.

8. Camera 2225 and 2226 are not shown on existing camera list. Are they new cameras?

Answer. Refer to updated camera spreadsheet, and TC205, TC305, cameras are existing to be

9. Are cameras JCS-0102/105 Weight Pit north-1,2,3 getting eliminated?

Answer. Refer to updated camera spreadsheet. Existing camera JCS-0077/80 is (1) 360° camera with

(4) lens to be replaced, not (4) cameras to be replaced.

10. Is JCS-2303 a new camera, not shown on existing camera list.

Answer. Refer to TC111 & TC312, Camera JCS-2303 is a new camera.

11. On page TC111 are cameras JCS-2410, 2411, 2412, 2413 remaining in the system or all of these cameras new. All four of the cameras are discontinued Sony cameras.

Answer. Refer to TC111, Existing cameras JCS-2410, 2411, 2412, 2413 will be removed & replaced with new cameras in new locations coordinated with owner. Existing equipment will be provided to owner. Use camera numbers as shown.

12. Is camera JCS-2421 a CG or a CC camera Answer. Refer to TC111, JCS-2421 is camera model ‘CC’

13. Is Camera JCS-2429 a CG or a CC camera

Answer. Refer to TC111, JCS-2429 is camera model ‘CC’

14. Is Camera JS-2503 replacing a camera or is it new. It is shown as an existing camera on the existing camera list.

Answer. Refer to TC112 & TC312, JCS-2503 is an existing camera to be replaced with a new camera.

15. Are cameras JCS-1400 and 1401 new cameras, not shown on existing camera list.

Answer. Refer to updated camera spreadsheet, and TC111 & TC211, cameras are existing to be

16. On page TC112 there is two JCS-2604 cameras please indicate what number the new camera should be.

Answer. Refer to TC112, Camera 2604 is an existing camera that shall be replaced. Camera 2605 is a new camera to install, shall be ‘CA’ camera type.

17. On page TC112 is cameras JCS-0077/80 Weight Pit South 2, 3, and 4 getting removed from the system?

Answer. Refer to updated camera spread sheet. Existing camera JCS-0077/80 is (1) 360° camera with (4) lens to be replaced, not (4) cameras to be replaced.

18. Is camera JCS-2504 getting replaced? Could not locate new camera one line diagram.

Answer. Refer to TC112 & TC312, JCS-2504 is an existing camera to be replaced with a new camera.

19. Is the new camera JCS 2626 replacing existing camera JCS2626 Quartermaster camera number2, 3, and 4?

Answer. Refer to updated camera spreadsheet. Existing camera JCS-2626 is (1) 360° camera with

(4) lens to be replaced, not (4) cameras to be replaced

20. Is new camera JCS-2627 replacing existing camera JCS-2627 Property Rm Camera 2, 3. And 4?

Answer. Refer to updated spreadsheet. Existing camera JCS-2627 is (1) 360° camera with (4) lens to be replaced, not (4) cameras to be replaced

Clarifications:

1. Refer to electrical site plan – please provide circuiting information, including the location of the panel(s) where power for the new poles is to come from; provide details for how the new light poles are going to be controlled.

Answer. Updates and information is shown in Addendum drawings

2. Refer to electrical plans – Admin 1st floor – please provide a panel schedule, panel specs, and a feeder including conduit and wire size for panel UPS-A; please provide branch breaker size for panel EA to feed new

UPS-A

Answer. Updates and information is shown in Addendum drawings

3. Please refer to TC113 & 312 – JCS-0233 and 0234 should be shown coming out of Cabinet-004 and not the generator building (we believe) as there is no reference to a security switch or fiber in the generator building itself; please advise.

Answer. See TC113. These cameras shall route through the generator building to CAB-004

4. Please provide specs for new camera only poles – typically they have been only 25’ w/a festoon at 18’ Answer. Updates and information is shown in Addendum drawings

5. Please see E511 reference to a new external shunt trip for existing MDP. Please provide part #’s and a wiring diagram to understand how and why we are installing this shunt trip and how it is to be wired to whatever would shunt power to this panel.

Answer. A bypass panel was added which includes a shunt trip breaker, it is no longer needed on the

MDP.

6. Please refer to the new fiber from modular trailer 1 to existing E unit comm room (TC105). The existing fiber from E unit to admin is 12MM but the new from the trailer to the unit is 24 SM. It would seem that the new fiber should be MM to connect from one fiber panel to the existing fiber to send the new switch connection back to admin. Also noting that SM fiber patch cables are being called out for connection to the replacement switches, but most of the existing infrastructure is MM.

Answer. Install as shown and specified.

7. Existing finish looks like Silver but the new spec calls for Bronze.

Answer. Color of the fixture shall match existing.

8. The existing are dimming, but the new fixtures are non-dim. How would you like us to proceed?

Answer. The new fixtures do not require dimming capabilities.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Bret Emerson, Commtech Design Inc. DATE: 10/14/2022

APPROVED BY:

PROJECT DIRECTOR: Rob Gruesbeck DATE:10/14/2022

/.aloe r+ 0„,* sLe5

EtAlt.t0 Ntt_ct whiter12@michigan.gov bret@commtechdesign.com albrechtd@michigan.gov goA cliftond@michigan.gov

Ilfin Lis NVID Technology, Management & Budget

Corn mtech Design 6581 Belding Rd. NE. Suite 101 Rockford. MI 49341

MEETING ATTENDANCE RECORD

MICHIGAN DEPARTMENT OF TECHNOLOGY MANAGEMENT AND BUDGET

FACILITIES AND BUSINESS ADMINISTRATION- DESIGN AND CONSTRUCTION DIVISION

PROJECT DESCRIPTION/LOCATION:

Cooper Correctional Facility (JCS) — 3100 Cooper Street, Jackson, MI 49201 Video Management System Upgrade

Sigma Coding:FILE NUMBER:
472JCFMaintProj472/21302,RWG

MEETING PLACE:

On Site at Cooper Street C.F. — Warden's Conference Room

DATE:

October 3, 2022

TIME:

1:00 PM

Meeting Topic:

Mandatory Pre-Bid Meeting

NAME

Bret Emerson

Richard White

Dave Albrecht

Rob Groesbeck

Joe Sovis

Michelle Floyd

Jeffery Rice

David Clifton

Richard Drabek

5/7- 7 8c-- (0319

(3- 9 109 an 16-7 609, 3

- ;40- 1(013

2'1% 431-1233

PHONE/CELL FIRM

Commtech Design, Inc.

MDOC

MDOC

DTMB

Matrix

MDOC — Cooper St.

MDOC — Cooper St.

MDOC — Cooper St.

MDOC — Cooper St.

lAitecuAkAA., Assoc:O-(s, W li4(4 co Rvci - t v .)

EMAIL

gruesbeckrAmichigan. gov j sovi s@matrixceinc. corn

F loydM 1 @michigan. gov drabekr@michigati gov ker7IRAIA(4,441.

LE4-kcl c....01 (Moekit$ (( C - COW\ eg• vcbfez_ fret ktc , COM

Ao

/037-0E(u. ..9) (4 ,f( 9 ,., . - .?r, y i i 04 -Dovili

"-51V

' ' t- —VT vi lipl .1)•144 u0952/ hggL— bh9—hil...

wc,7' sv 0D P1-)--A po-z 4-uzig>/'Z or,- z‘1-01b
7144J4,-A-.7"r4A

"AkAIT R—r—v—ire,-0.\ L C CL1-) - 8ba? — L I S 'DW, 13 'I'Vr-‘3"kl

State of Michigan Matrix Project No. 21316.07 Department of Technology, Management and Budget Design and Construction Division Copper Street Correctional Facility Video Management Upgrade – Phase 1 File No: 472/21302.RWG Funding Code No.: 472JCSMaintProj

TURF AND GRASSES 329200 - 1

SECTION 329200 - TURF AND GRASSES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes but is not necessarily limited to the furnishing and installation of the major items listed below, as indicated on the drawings, as specified herein, and as necessary for the proper and complete performance of the work.

B. Major items:

1. Seeding.

1.2 DEFINITIONS

A. Duff Layer: The surface layer of native topsoil that is composed of mostly decayed leaves, twigs, and detritus.

B. Finish Grade: Elevation of finished surface of planting soil.

C. Manufactured Topsoil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

D. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

E. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people. These include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses.

F. Planting Soil: Standardized topsoil; existing, native surface topsoil; existing, in-place surface soil; imported topsoil; or manufactured topsoil that is modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

G. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or top surface of a fill or backfill before planting soil is placed.

H. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms.

I. Surface Soil: Whatever soil is present at the top layer of the existing soil profile at the Project site. In undisturbed areas, the surface soil is typically topsoil, but in disturbed areas such as urban environments, the surface soil can be subsoil.

Design and Construction Division Copper Street Correctional Facility Video Management Upgrade – Phase 1

TURF AND GRASSES 329200 - 2

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Certification of grass seed.

C. Product certificates.

1.4 QUALITY ASSURANCE

A. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when work is in progress.

1. Pesticide Applicator: State licensed, commercial.

B. Soil Analysis: For each unamended soil type, furnish soil analysis and a written report by a qualified soil-testing laboratory.

1. The soil-testing laboratory shall oversee soil sampling.

2. Report suitability of tested soil for turf growth.

a. State recommendations for nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory planting soil suitable for healthy, viable plants.

b. Report presence of problem salts, minerals, or heavy metals; if present, provide additional recommendations for corrective action.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of conformance with state and federal laws, as applicable.

1.6 MAINTENANCE SERVICE

A. Initial Turf Maintenance Service: Provide full maintenance by skilled employees of landscape Installer. Maintain as required in Part 3. Begin maintenance immediately after each area is planted and continue until acceptable turf is established but for not less than the following periods:

1. Seeded Turf: 60 days from date of planting completion.

a. When initial maintenance period has not elapsed before end of planting season, or if turf is not fully established, continue maintenance during next planting season.

Design and Construction Division Copper Street Correctional Facility Video Management Upgrade – Phase 1

TURF AND GRASSES 329200 - 3

PART 2 - PRODUCTS

2.1 SEED

A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Journal of Seed Technology; Rules for Testing Seeds" for purity and germination tolerances.

B. Grass Seed Mix: Proprietary seed mix as follows:

1. Products:

a. Full sun or light shade: Earth Carpet Madison Parks lawn seed mixture or approved equal with the proportion by weight as follows:

(1) 40 percent Kentucky Bluegrass.

(2) 25 percent Creeping Fescue.

(3) 20 percent Perennial Ryegrass.

(4) 15 percent Chewing Fescue.

2.2 INORGANIC SOIL AMENDMENTS

A. Lime: ASTM C 602, agricultural liming material containing a minimum of 80 percent calcium carbonate equivalent and as follows:

1. Class: T, with a minimum of 99 percent passing through No. 8 sieve and a minimum of

75 percent passing through No. 60 sieve.

2. Class: O, with a minimum of 95 percent passing through No. 8 sieve and a minimum of

55 percent passing through No. 60 sieve.

B. Sulfur: Granular, biodegradable, containing a minimum of 90 percent sulfur, and with a minimum of 99 percent passing through No. 6 sieve and a maximum of 10 percent passing through No. 40 sieve.

C. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

D. Aluminum Sulfate: Commercial grade, unadulterated.

E. Perlite: Horticultural perlite, soil amendment grade.

F. Agricultural Gypsum: Minimum 90 percent calcium sulfate, finely ground with 90 percent passing through No. 50 sieve.

G. Sand: Clean, washed, natural or manufactured, and free of toxic materials.

H. Diatomaceous Earth: Calcined, 90 percent silica, with approximately 140 percent water absorption capacity by weight.

Design and Construction Division Copper Street Correctional Facility Video Management Upgrade – Phase 1

TURF AND GRASSES 329200 - 4

I. Zeolites: Mineral clinoptilolite with at least 60 percent water absorption by weight.

2.3 ORGANIC SOIL AMENDMENTS

A. Compost: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8;

moisture content 35 to 55 percent by weight; 100 percent passing through 3/4-inch sieve;

soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings.

B. Sphagnum Peat: Partially decomposed sphagnum peat moss, finely divided or of granular texture, with a pH range of 3.4 to 4.8.

C. Muck Peat: Partially decomposed moss peat, native peat, or reed-sedge peat, finely divided or of granular texture, with a pH range of 6 to 7.5, and having a water-absorbing capacity of 1100 to 2000 percent.

D. Wood Derivatives: Decomposed, nitrogen-treated sawdust, ground bark, or wood waste; of uniform texture and free of chips, stones, sticks, soil, or toxic materials.

E. Manure: Well-rotted, unleached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth.

2.4 FERTILIZERS

A. Comply with Section 917.10 of MDOT 2012 Standard Specifications for Construction except as herein specified.

B. Liquid fertilizer for hydroseed: 16-32-4 containing no chlorine.

C. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

1. Composition: 1 lb/1000 sq. ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.

D. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition:

1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.

2.5 PLANTING SOILS

A. Planting Soil: ASTM D 5268 topsoil, with pH range of 5.5 to 7, a minimum of 2 percent organic material content or existing, native surface topsoil formed under natural conditions with the duff

Design and Construction Division Copper Street Correctional Facility Video Management Upgrade – Phase 1

TURF AND GRASSES 329200 - 5

layer retained during excavation process. Verify suitability of soil to produce viable planting soil.

Clean soil of roots, plants, sod, stones, clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or chunks, cement, plaster, building debris, and other extraneous materials harmful to plant growth. Mix soil with the following soil amendments and fertilizers in the following quantities to produce planting soil:

1. Volume of compost per 1000 sq. ft.: 1 CY.

2. Volume of peat per 1000 sq. ft.: 1 CY.

3. Volume of sand per 1000 sq. ft.: 1 CY.

4. Weight of Perlite per 1000 sq. ft.: 1 lb.

5. Weight of Bonemeal per 1000 sq. ft.:10 lbs.

6. Weight of Superphosphate per 1000 sq. ft.: 1 lb.

7. Weight of Commercial Fertilizer per 1000 sq. ft.: 20 lbs.

8. Weight of Slow-Release Fertilizer per 1000 sq. ft.: 1 lb.

2.6 PESTICIDES

A. General: Pesticide, registered and approved by EPA, acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted pesticides unless authorized in writing by authorities having jurisdiction.

PART 3 - EXECUTION

3.1 TURF AREA PREPARATION

A. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 8 inches. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Thoroughly blend planting soil off-site before spreading; or spread topsoil, apply soil amendments and fertilizer on surface, and thoroughly blend planting soil.

2. Spread planting soil to a depth of 6 inches but not less than required to meet finish grades after light rolling and natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet.

B. Unchanged Subgrades: If turf is to be planted in areas unaltered or undisturbed by excavating, grading, or surface-soil stripping operations, prepare surface soil as follows:

1. Remove existing grass, vegetation, and turf. Do not mix into surface soil.

2. Loosen surface soil to a depth of at least 6 inches. Apply soil amendments and fertilizers according to planting soil mix proportions and mix thoroughly into top 4 inches of soil. Till soil to a homogeneous mixture of fine texture.

3. Remove stones larger than 1-1/2 inches in any dimension and sticks, roots, trash, and other extraneous matter.

Design and Construction Division Copper Street Correctional Facility Video Management Upgrade – Phase 1

TURF AND GRASSES 329200 - 6

4. Legally dispose of waste material, including grass, vegetation, and turf, off Owner's property.

C. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can be planted in the immediate future.

D. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

E. Before planting, obtain Engineer's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.

3.2 SEEDING

A. Do not broadcast or drop seed when wind velocity exceeds 5 mph. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer.

B. Sow seed at a total rate of 6 to 8 lb/1000 sq. ft.

C. Rake seed lightly into top 1/8 inch of soil, roll lightly, and water with fine spray.

D. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose thickness over seeded areas. Spread by hand, blower, or other suitable equipment.

1. Anchor straw mulch by crimping into soil with suitable mechanical equipment.

E. Protect seeded areas from hot, dry weather or drying winds by applying compost mulch within 24 hours after completing seeding operations. Soak areas, scatter mulch uniformly to a thickness of 3/16 inch, and roll surface smooth.

3.3 TURF MAINTENANCE

A. Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth turf. Provide materials and installation the same as those used in the original installation.

B. Mow turf as soon as top growth is tall enough to cut. Repeat mowing to maintain height appropriate for species without cutting more than 1/3 of grass height. Remove no more than 1/3 of grass-leaf growth in initial or subsequent mowings.

C. Apply pesticides and other chemical products and biological control agents in accordance with authorities having jurisdiction and manufacturer's written recommendations. Coordinate

Design and Construction Division Copper Street Correctional Facility Video Management Upgrade – Phase 1

TURF AND GRASSES 329200 - 7

applications with Owner's operations and others in proximity to the Work. Notify Owner before each application is performed.

3.4 SATISFACTORY TURF

A. Turf installations shall meet the following criteria:

1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.

B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until turf is satisfactory.

END OF SECTION 329200