Addendum 1 (2023_1103).pdf
PDF 93 KB Posted
- Attached to
- Water Reclamation Facility Improvements
- Solicitation number
- PE-70750-NONST-2024-000000006
- Issued by
- Newton County, Georgia
About this file
This document is an Addendum No. 1 issued by the City of Covington for the Water Reclamation Facility Improvements project, Project No. C8370.025. The bid date has been changed to November 17, 2023 at 10:00 am local time, and all references to the bid opening date in the specifications should be updated to reflect this change. The project is being engineered by Carter & Sloope, Inc.
The pricing terms, set-asides, incumbents, funding requirements and sources, and any other salient information are not provided in this addendum. This document solely focuses on the change in bid date for the Water Reclamation Facility Improvements project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 (2023_1109).pdf | ||
| 00100_Invitation to Bid.pdf | ||
| Addendum 3 (2023_1113).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
DATE: November 3, 2023
OWNER: City of Covington
PROJECT: Water Reclamation Facility Improvements
C & S PROJECT NO.: C8370.025
ENGINEER: Martin C. Boyd, P.E.
CARTER & SLOOPE, INC.
1031 Stonebridge Parkway Watkinsville, Georgia 30677 Telephone: 706-769-4119 Email: mboyd@cartersloope.com
BID DATE: November 17, 2023 BID OPENING: 10:00 AM Local Time
TO ALL BIDDERS:
DOWNLOADING THIS ADDENDUM THROUGH QUESTCDN IS YOUR
ACKNOWLEDGMENT OF RECEIPT. NO OTHER ACTION IS NECESSARY TO
ACKNOWLEDGE RECEIPT. THIS ADDENDUM FORMS A PART OF THE BID
DOCUMENTS WHICH ARE HEREBY MODIFIED IN THE FOLLOWING RESPECTS:
I. CONTRACT DOCUMENTS AND SPECIFICATIONS
A. Section 00100 – Invitation to Bid
1. The bid date has changed to November 17, 2023 at 10:00 am local time. The location of the bid opening will not change. All references to the Bid Opening date in the Specifications should be updated to this new date.
END OF ADDENDUM NO. 1
mailto:mboyd@cartersloope.com
File details come from the government source that posted it. Updated .