Addendum 1 18164.pdf

PDF 5 MB Posted

Attached to
751/18164. GAG Rockport State Rec Area Development Plan
Solicitation number
RFP 171 180000003329 3
Issued by
Presque Isle County, Michigan

About this file

This is Addendum No. 1 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Rockport State Recreation Area Development Master Plan (File Number 751/18164.GAG). The addendum provides details regarding the pre-proposal meeting and site tour scheduled to begin at 12:30 p.m. at the Rockport SRA Picnic Area near the pier and boating access site, with the tour expected to last 2-3 hours. The Michigan Department of Natural Resources will provide two to three 4WD vehicles for participants; those wishing to ride in DNR vehicles were required to RSVP to Project Director Jerry Gregorski by Monday, August 27, 2018 at 12:00 p.m., although participants were permitted to bring their own 4WD vehicles. The proposal due date is September 13, 2018. The site tour covers multiple areas including the boating access site, picnic and pier area, bat cave/aggregate pile, quarry, possible campground area, sink holes, proposed trailhead parking area, and Besser Natural Area.

The addendum includes a detailed map of the Rockport Recreation Area showing trail systems, parking lots, trail intersections, and the State Park boundaries, with distance markers and trail classifications (hiking, hiking/biking, and hiking/biking/equestrian routes). Participants were advised to prepare for various weather and physical conditions and to bring water and snacks as needed. No pricing terms, funding sources, or contract award information is provided in this addendum.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 6/16)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL ADDENDUM NO. -01

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

8/23/2018

PROJECT NAME

Rockport State Recreation Area – Development Master Plan

FILE NUMBER

751/18164.GAG

PROJECT DIRECTOR

Jerry Gregorski

PROPOSAL DUE DATE:

9/13/2018

ADDENDUM ITEMS:

1-Details of the Pre-Proposal Meeting and Site Tour:

Location: Meet at the Rockport SRA Picnic Area near the pier and boating access site. See attached map below.

Schedule: The meeting will begin at 12:30pm with the site tour starting immediately after. The tour should take 2-3 hours.

Transportation: The DNR will provide 2-3 4WD trucks for the site tour. If you wish to ride in a DNR vehicle please RSVP to the Project Director, Jerry Gregorski, gregorskig@michigan.gov 231-557-9043 by Monday, August 27 at 12:00pm. Participants are free to bring their own 4WD vehicle.

Conditions: Participants should be prepared for a variety of weather and physical conditions. Consider bringing water and snacks as desired.

Tour Route: SRA general areas of coverage include:

- Boating Access Site

- Picnic/ Pier Area

- Bat Cave/aggregate pile

- Quarry

- Possible campground area

- Sink Holes

- Proposed Trailhead parking area

- Besser Natural Area

APPROVED BY:

Jerry Gregorski DATE: 8/23/2018 http://www.michigan.gov/SIGMAVSS mailto:gregorskig@michigan.gov

0.2

0.4

0.3 0.6

0.3

2.2 miles

1 mile

1.8 miles

2.1 miles

1.1 miles

Grand Lake Rd

Rayburn

Big sink hole

0.7 miles

Quarry

0.6 miles

2.8 miles

G ra nd L ak e

R d

Rockport Rd

D au lt R d

Bell Bay Rd

County Line Hwy

£¤23

£¤23

1.4

1.2

1.7

0.

0.8

0.4

0.7

0.5

0.3 0.4

0.9

0.8

0.1

0.3

0.4

0.3

0.

0.7

0.2

0.6

0.

0.

0.6

0.8

0.3

0.4

0.6

0.2

0.5

0.3

0.2

0.3

0.5

0.1

0.

0.1

5 4

31 32

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

ROCKPORT RECREATION AREA TRAILS

0 0.9 Miles

Michigan Department of Natural Resources Parks and Recreation Division

Stewardship Unit Prepared 6/9/2017 by A. Ihnken

Trails Hiking Hiking/Biking Hiking/Biking/Equestrian Hiking/Equestrian

!( Trail Intersections Besser Natural Area State Park Boundaries

"5 "5 Parking Lot

"5 gregorskig Polygon gregorskig Text Box Pre-Proposal Meeting & Site Tour Start Location at Picnic Area

File details come from the government source that posted it. Updated .