Addendum #1

379 KB Posted

Attached to
Randolph County Learning Center AHU Replacement
Solicitation number
82000-ATC0000060
Issued by
Schley County, Georgia

About this file

This Addendum No. 1, issued by the Technical College System of Georgia on behalf of Albany Technical College, modifies the original bidding documents for the Randolph County Learning Center AHU (Air Handling Unit) Replacement project dated March 14, 2023. The project involves the replacement of an air handling unit at Albany Technical College's Randolph County Learning Center located at 241 Highway 82 East in Cuthbert, Georgia. A mandatory prebid conference and site visit were held on April 13, 2023, at 10:00 a.m. EST at the Albany Campus in Room 106 of the Randolph County Learning Center. This addendum, effective April 17, 2023, establishes modifications to the contract documents and must be acknowledged by bidders on the bid form to avoid disqualification.

The addendum amends Section 01 4000 (Quality Requirements) by identifying three approved contractors qualified to bid on this project: Albany Air, Apex Facility Services, and SafeAire. Additionally, Sheet E201 was revised to include new electrical work notes for the condensing units, specifying requirements for new conduit and wire connections to existing disconnect switches, voltage conversion through a new variable frequency drive (VFD), automatic volume dampers, circuit extensions, and new 60-ampere fused disconnect switches with proper feeder sizing. The electrical modifications include reusing existing feeders where applicable and connecting new equipment to the main service board through the mechanically located VFD.

Text of this file

Albany Technical College Randolph County Learning Center AHU Replacement

NBP #22110

ADDENDUM NO. 1

A1 - 1

This Addendum forms part of the Contract Documents and modifies the original bidding documents dated March 14, 2023. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do may subject the bidder to disqualification.

The contract documents are herein amended under the date of April 17, 2023 as follows:

AMENDMENTS TO THE SPECIFICATIONS

1. SECTION 01 4000 – QUALITY REQUIREMENTS

A. 1.04.L.: Add the following paragraphs to the Documents:

L. The following Contractors submitted Qualifications meeting the Specified Requirements and are approved to bid:

1. Albany Air

2. Apex Facility Services

3. SafeAire

AMENDMENTS TO THE DRAWINGS

1. SHEET E201:

A. Added notes for electrical work at Condensing Units.

END OF ADDENDUM

SCALE:

= 1'-0

8 0 4 8 16

N

E201

E201

SCALE:

= 1'-0

4 0 2 4 8

N

& MEZZANINE PLAN - NEW WORK - ELECTRICAL

LARGE SCALE - ELEC/MECH RM.

FLOOR PLAN - NEW WORK - ELECTRICAL

ELECTRICAL

NEW WORK -

FLOOR PLAN -

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

NOTES:(THIS SHEET ONLY)

3 PROVIDE NEW CONDUIT AND WIRE TO EXISTING DISCONNECT SWITCH, 1"C WITH 3#6, 1#10G.

RECONNECT EXISTING FEEDER (LOAD AND LINE SIDES) TO NEW VFD AT THIS LOCATION.

EXISTING FEEDER SHALL BE REUSED.

MSB-7 ROUTED THROUGH NEW VFD IN MECHANICAL ROOM ON LEVEL BELOW.

TO REMAIN

DISCONNECT

EXISTING

NEW MEZZANINE

BENEATH

NEW VFD

NEW

NEW

AUTOMATIC VOLUME DAMPER.

AND CONNECT TO NEW

EXTEND EXISTING CIRCUIT

PROVIDE NEW CIRCUIT FROM SPARE IN PANEL R1, #12, •"C.

NEW AIR HANDLER HAS INTEGRAL LIGHTS AND A RECEPTACLE ON THE OUTSIDE.

FUSE SIZE SHALL MATCH CU MFR MOCP.

FROM NEW DISCONNECT TO NEW CONDENSING UNIT.

FEEDER FROM MSB. PROVIDE NEW 1•"C WITH 4#4, 1#8G

60A/3P/3R FUSED DISCONNECT SWITCH. REUSE EXISTING

REPLACE EXISTING FUSED DISCONNECT SWITCH WITH NEW

FUSE SIZE SHALL MATCH CU MFR MOCP.

FROM NEW DISCONNECT TO NEW CONDENSING UNIT.

FEEDER FROM MSB. PROVIDE NEW 1•"C WITH 4#4, 1#8G

60A/3P/3R FUSED DISCONNECT SWITCH. REUSE EXISTING

REPLACE EXISTING FUSED DISCONNECT SWITCH WITH NEW

1 ADDENDUM #1 04.17.23

P:\22110\22110e201.dgn

DATE PLOTTED

DGN FILE

17-APR-2023

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22110\22110e201.dgn

AS SHOWN

22110

SHD

BCO

SHD

R a n d o lp h C o u n ty L e a rn in g C e n te r

A H

U R e p la c e m e n t

A lb a n y T e c h n ic a l C o ll e g e

A lb a n y

G e o rg ia

N B P P ro je c t

N o

F O

R

C O

N S T

R U

C T

IO

N

03.14.2023

EXPIRES: 06.30.2024

COA#PEF000774

NBP ENGINEERS, INC.

CLASSROOM

CLOS

116A

CORR.

CLOS.

WOMEN

DATA

SEC.

WORKROOM

OPEN OFFICE AREA

CLOSET

116B

CLOSET

106A

DATA

MEN

JAN.

LOBBY

101 CAREER CENTER

DEPT. OF LABOR

LAB

PRECISION

TRAINING

INCUBATOR & MANUF.

LAB

TECHNICAL

MECH.

ELEC. &

CORR.

2 3 4 51 6

B

D

A

C

E

H

G

J

I

2 2.5 3.2 53.8 4.5

F

TU-3

TU-2

EF-1

EF-3

TU-6

TU-5

TU-4

TU-13

TU-12

TU-1

TU-11

TU-10

TU-9 TU-8

TU-7

EF-2

ACP

EWH-1

PTAC-A

LS1

LS2 LS3

F J

F F J J

F

F

F

F

MSB-

R1

H1

LCD

T

.5

K V

A

X1

MSB

C1

R1-31

MSB-8

LS1-19

LS1-21 LS2-2

LS2-19

R1-40

MSB-6

LS3-2

R1-39

MSB-4

H1-7

LS3-6

MSB-9

MSB-5

LS3-19

FAP

LS3-4

WH

AIR COMPRESSOR

TRANSFORMER

HOUSEKEEPING PAD

EXISTING CONCRETE

VFD

CU-2

CU-1

AH-1

Addendum #1
Drawings Addendum #1
22110e201
References
tb, 22110tb.dgn
afp1, 22110a1.dgn
afp2, 22110a1.dgn
existing, 22110e101.dgn
hvac, 22110m201.dgn
afp , 22110a2.dgn

Other files

File Type Posted
NOIA —
Approved Bid Tab Sheet —
Mandatory Prebid Sign-In Sheet —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .