About this file
This Addendum No. 1, issued by the Technical College System of Georgia on behalf of Albany Technical College, modifies the original bidding documents for the Randolph County Learning Center AHU (Air Handling Unit) Replacement project dated March 14, 2023. The project involves the replacement of an air handling unit at Albany Technical College's Randolph County Learning Center located at 241 Highway 82 East in Cuthbert, Georgia. A mandatory prebid conference and site visit were held on April 13, 2023, at 10:00 a.m. EST at the Albany Campus in Room 106 of the Randolph County Learning Center. This addendum, effective April 17, 2023, establishes modifications to the contract documents and must be acknowledged by bidders on the bid form to avoid disqualification.
The addendum amends Section 01 4000 (Quality Requirements) by identifying three approved contractors qualified to bid on this project: Albany Air, Apex Facility Services, and SafeAire. Additionally, Sheet E201 was revised to include new electrical work notes for the condensing units, specifying requirements for new conduit and wire connections to existing disconnect switches, voltage conversion through a new variable frequency drive (VFD), automatic volume dampers, circuit extensions, and new 60-ampere fused disconnect switches with proper feeder sizing. The electrical modifications include reusing existing feeders where applicable and connecting new equipment to the main service board through the mechanically located VFD.
Text of this file
Albany Technical College Randolph County Learning Center AHU Replacement
NBP #22110
ADDENDUM NO. 1
A1 - 1
This Addendum forms part of the Contract Documents and modifies the original bidding documents dated March 14, 2023. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do may subject the bidder to disqualification.
The contract documents are herein amended under the date of April 17, 2023 as follows:
AMENDMENTS TO THE SPECIFICATIONS
1. SECTION 01 4000 – QUALITY REQUIREMENTS
A. 1.04.L.: Add the following paragraphs to the Documents:
L. The following Contractors submitted Qualifications meeting the Specified Requirements and are approved to bid:
1. Albany Air
2. Apex Facility Services
3. SafeAire
AMENDMENTS TO THE DRAWINGS
1. SHEET E201:
A. Added notes for electrical work at Condensing Units.
END OF ADDENDUM
SCALE:
= 1'-0
8 0 4 8 16
N
E201
E201
SCALE:
= 1'-0
4 0 2 4 8
N
& MEZZANINE PLAN - NEW WORK - ELECTRICAL
LARGE SCALE - ELEC/MECH RM.
FLOOR PLAN - NEW WORK - ELECTRICAL
ELECTRICAL
NEW WORK -
FLOOR PLAN -
LINE LEGEND
POINT OF CONNECTION
EXISTING TO REMAIN
NEW WORK
NOTES:(THIS SHEET ONLY)
3 PROVIDE NEW CONDUIT AND WIRE TO EXISTING DISCONNECT SWITCH, 1"C WITH 3#6, 1#10G.
RECONNECT EXISTING FEEDER (LOAD AND LINE SIDES) TO NEW VFD AT THIS LOCATION.
EXISTING FEEDER SHALL BE REUSED.
MSB-7 ROUTED THROUGH NEW VFD IN MECHANICAL ROOM ON LEVEL BELOW.
TO REMAIN
DISCONNECT
EXISTING
NEW MEZZANINE
BENEATH
NEW VFD
NEW
NEW
AUTOMATIC VOLUME DAMPER.
AND CONNECT TO NEW
EXTEND EXISTING CIRCUIT
PROVIDE NEW CIRCUIT FROM SPARE IN PANEL R1, #12, •"C.
NEW AIR HANDLER HAS INTEGRAL LIGHTS AND A RECEPTACLE ON THE OUTSIDE.
FUSE SIZE SHALL MATCH CU MFR MOCP.
FROM NEW DISCONNECT TO NEW CONDENSING UNIT.
FEEDER FROM MSB. PROVIDE NEW 1•"C WITH 4#4, 1#8G
60A/3P/3R FUSED DISCONNECT SWITCH. REUSE EXISTING
REPLACE EXISTING FUSED DISCONNECT SWITCH WITH NEW
FUSE SIZE SHALL MATCH CU MFR MOCP.
FROM NEW DISCONNECT TO NEW CONDENSING UNIT.
FEEDER FROM MSB. PROVIDE NEW 1•"C WITH 4#4, 1#8G
60A/3P/3R FUSED DISCONNECT SWITCH. REUSE EXISTING
REPLACE EXISTING FUSED DISCONNECT SWITCH WITH NEW
1 ADDENDUM #1 04.17.23
P:\22110\22110e201.dgn
DATE PLOTTED
DGN FILE
17-APR-2023
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22110\22110e201.dgn
AS SHOWN
22110
SHD
BCO
SHD
R a n d o lp h C o u n ty L e a rn in g C e n te r
A H
U R e p la c e m e n t
A lb a n y T e c h n ic a l C o ll e g e
A lb a n y
G e o rg ia
N B P P ro je c t
N o
F O
R
C O
N S T
R U
C T
IO
N
03.14.2023
EXPIRES: 06.30.2024
COA#PEF000774
NBP ENGINEERS, INC.
CLASSROOM
CLOS
116A
CORR.
CLOS.
WOMEN
DATA
SEC.
WORKROOM
OPEN OFFICE AREA
CLOSET
116B
CLOSET
106A
DATA
MEN
JAN.
LOBBY
101 CAREER CENTER
DEPT. OF LABOR
LAB
PRECISION
TRAINING
INCUBATOR & MANUF.
LAB
TECHNICAL
MECH.
ELEC. &
CORR.
2 3 4 51 6
B
D
A
C
E
H
G
J
I
2 2.5 3.2 53.8 4.5
F
TU-3
TU-2
EF-1
EF-3
TU-6
TU-5
TU-4
TU-13
TU-12
TU-1
TU-11
TU-10
TU-9 TU-8
TU-7
EF-2
ACP
EWH-1
PTAC-A
LS1
LS2 LS3
F J
F F J J
F
F
F
F
MSB-
R1
H1
LCD
T
.5
K V
A
X1
MSB
C1
R1-31
MSB-8
LS1-19
LS1-21 LS2-2
LS2-19
R1-40
MSB-6
LS3-2
R1-39
MSB-4
H1-7
LS3-6
MSB-9
MSB-5
LS3-19
FAP
LS3-4
WH
AIR COMPRESSOR
TRANSFORMER
HOUSEKEEPING PAD
EXISTING CONCRETE
VFD
CU-2
CU-1
AH-1
| Addendum #1 |
| Drawings Addendum #1 |
| 22110e201 |
| References |
| tb, 22110tb.dgn |
| afp1, 22110a1.dgn |
| afp2, 22110a1.dgn |
| existing, 22110e101.dgn |
| hvac, 22110m201.dgn |
| afp , 22110a2.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| NOIA | — | |
| Approved Bid Tab Sheet | — | |
| Mandatory Prebid Sign-In Sheet | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .