Addendum 02.pdf
PDF 140 KB Posted
- Solicitation number
- RFQ 171 230000000138 3
- Issued by
- Oscoda County, Mio CDP, Michigan
About this file
This is a Construction Bid Addendum No. 2 issued by the Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the State of Michigan. The addendum pertains to the Mio DNR Office Renovation and Demolition project (File Number 751.22068.MAA) and was issued on January 19, 2023, with a bid opening date of January 25, 2023. The professional firm managing the project is William A Kibbe & Assoc., Inc., with Maria Alvaro serving as the Project Director. The addendum approves the Acuity Brands lighting package as specified in the Lighting Fixture Schedule found on sheet E000 of the bidding documents.
Bidders are required to acknowledge receipt of this addendum in their bid submission, as failure to do so may result in bid rejection. This addendum becomes part of the contract documents and incorporates interpretations, clarifications, and modifications into the original bidding documents. All bidders must reference this addendum when submitting their proposals for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 01_Part1.pdf | ||
| Addendum 01_Part2.pdf | ||
| Advertisment_22068.MAA.pdf | ||
| Specificiations_22068.MAA.pdf | ||
| Drawings_22068.MAA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
1/19/2023
PROJECT NAME
Mio DNR Office Renovation and Demolition
FILE NUMBER
751.22068.MAA
PROFESSIONAL
William A Kibbe & Assoc., Inc.
PROJECT DIRECTOR
Maria Alvaro
BID OPENING DATE:
1/25/2023
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. The Acuity Brands lighting package has been reviewed based on the Lighting Fixture Schedule found on sheet E000 and is approved for bids.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
Jay Wheeler
PROFESSIONAL: DATE: 1/19/2023
APPROVED BY:
Maria Alvaro
PROJECT DIRECTOR: DATE: 1/19/2023