ADDENDUM 001 USVI Energy Project (004).pdf

PDF 95 KB Posted

Attached to
Virgin Islands Renewable Energy Systems Federal contract opportunity
Solicitation number
W50S93-20-B-5002-0004
Issued by
Department of the Army Michigan Army National Guard

About this file

This addendum and solicitation notice provide details for a renewable energy project in the U.S. Virgin Islands. The addendum revises the statement of work to remove the construction of a 20kW wind turbine from the scope. Offerors should disregard references to the wind turbine in design drawings and the original statement of work. The scope for installing solar PV systems remains unchanged. The solicitation seeks bids for the Virgin Islands Renewable Energy Systems project, with hand carried bids due at the 127th Mission Support Command Contracting Division at Selfridge Air National Guard Base in Michigan by the specified date and time. Mailed bids are also accepted but may experience delivery delays due to COVID-19. The opportunity is issued by the Department of the Army Michigan Army National Guard to install renewable energy systems using solar power on federal facilities in the U.S. Virgin Islands.

View the file

Other files for this federal contract opportunity

Other files attached to Virgin Islands Renewable Energy Systems, newest first.
File Type Posted
RFI-4 Responses.pdf PDF
RFI-2 Responses.pdf PDF
RFI-3 Responses.pdf PDF
W50S93-20-B-5002-0004.pdf PDF
RFI-1 Responses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. # 001 DATED: 25 AUGUST 2020

TO THE:

( ) TECHNICAL PROVISIONS OF THE SPECIFICATIONS DATED:

( ) DRAWING NO. DATED:

(X ) STATEMENT OF WORK DATED: 26 AUG 2020

( ) PROJECT BOOK DATED:

( ) OTHER

FOR PROJECT;

TITLE: Energy: Construct Renewable Energy Systems, NUMBER: WBGA092401

BASE: STX ANG Station, VI

Change Scope of WORK The Government no longer intends to purse construction of a 20 kw Wind Turbine. The offeror should ignore all references to the construction of a 20kW Wind Turbine in the design dwgs and scope of work of this project. The scope of work for the Solar PV systems shall stay as is.

END OF ADDENDUM NO. # 001