Addedum I - Spec Revision.pdf

PDF 193 KB Posted

Attached to
TATE HELL STATE FOREST ROADSIDE DITCH DEBRUSHING
Solicitation number
ITB-14334
Issued by
Franklin County, Florida

About this file

Addendum I to Solicitation ITB FFS 25-26-45, issued by the Florida Department of Agriculture and Consumer Services, revises the contract specifications for Tate Hell State Forest Roadside Ditch Debrushing. The solicitation requests competitive bids for masticating and mulching services along approximately 45 miles of roadside ditches in Franklin County, Florida, requiring removal of brush, shrubs, small trees under six inches in diameter, and titi vegetation down to three inches or less. Contractors must demonstrate capability to masticate or mulch a minimum of 7.5 miles per week and provide all necessary labor, equipment, materials, and transportation. A mandatory site visit is scheduled for November 19, 2025, at 10:00 a.m., with sealed bids due December 1, 2025, at 5:00 p.m. and public bid opening on December 2, 2025, at 10:00 a.m. Addendum I extends the contract completion date from December 31, 2025, to February 28, 2026, for both the equipment and personnel requirements section and the overall contract period.

Evaluation will be based on the lowest Grand Total Price, with the Department intending to make a single award to the most responsive and responsible vendor. Contractors must meet comprehensive insurance requirements, including $1,000,000 general liability per occurrence, $2,000,000 aggregate, $300,000 automobile liability, and workers' compensation insurance compliant with Florida law. Bidders must submit site visitation certification, three professional references, acknowledgment forms, price sheets, federal funds certifications, drug-free workplace certification, and vendor certification forms. Contractors are responsible for all debris removal and disposal at their own expense and must maintain valid certifications, licenses, and permits. A competent foreman must remain onsite throughout project execution. The solicitation does not specify explicit set-aside designations or funding amounts.

View the file

Other files

File Type Posted
Appendix I - Map.pdf PDF
ITB FFS 25 26 45_Final.pdf PDF
Appendix I - Map.pdf PDF
ITB FFS 25 26 45 Addendum II- QA.pdf PDF
ITB FFS 25 26 45_Final.pdf PDF
Appendix I - Map.pdf PDF
ITB FFS 25 26 45_Final.pdf PDF
Addedum I - Spec Revision.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum Date: November 17, 2025

Addendum Number: I

Solicitation Number: ITB FFS 25 26 45

Solicitation Title: TATE HELL STATE FOREST ROADSIDE DITCH DEBRUSHING

Response Due Date: December 1, 2025, by 5:00 p.m., Eastern Time

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Protests must be filed with the Department’s Agency Clerk. Filings may be made physically at:

Florida Department of Agriculture and Consumer Services The Holland Building 600 South Calhoun Street Tallahassee, Florida 32399

Please be advised that the information contained on the next page is applicable to the original specifications of the above referenced solicitation. Added language to this solicitation indicated in red font, while deleted language has been stricken.

All questions regarding this Addendum should be submitted in writing to the Procurement Officer at Bids@FDACS.gov or contact the Procurement Office at (850) 617-7181.

This Addendum includes the following changes:

Change No. 1:

Section 2.4, Equipment And Personnel Requirements, third paragraph, is hereby revised as follows.

2.4 Equipment And Personnel Requirements

The contractor must provide sufficient equipment to complete the project by December 31, 2025.

February 28, 2026. If necessary, the contractor shall provide additional equipment to complete the project during the contracted period. All equipment shall be of the appropriate type, size, and in proper mechanical condition to meet the performance standards outlined in this ITB.

mailto:Bids@FDACS.gov

Change No. 2:

Section 2.6, Contract Period, is hereby revised as follows.

2.6 Contract Period

The anticipated contracted period shall be upon execution of the Department’s purchase order through December 31, 2025. February 28, 2026.

[REMAINDER OF PAGE LEFT BLANK INTENTIONALLY]

File details come from the government source that posted it. Updated .