This is a set of electrical diagrams (Addendum 2 to RFP No. CPA0026-NLSP-SPP-SPC) prepared by Moffatt & Nichol for the Connecticut Port Authority's New London State Pier Shore Power Project in New London, Connecticut. The diagrams provide technical specifications for the shore power electrification infrastructure, including single line diagrams (E-601), control wiring diagrams (E-602), interlocking control diagrams (E-603), and one-line diagrams for both medium voltage (11 kV) and low voltage (480V and 208V/120V) shore power systems (E-604). The project involves modification of an existing high-voltage shore power outlet at the southern station and installation of an additional high-voltage outlet and low-voltage outlet on the northern berth side to enable docked marine vessels to connect to the local electrical grid. Key electrical components specified include a 1200A, 11kV, three-phase switchgear with 500 MVA capacity; a 15 kVA transformer stepping down 11 kV to 208Y/120V; protective relays (SEL-751 and SEL-787); neutral ground resistor (NGR) equipment with monitoring; shore power outlet boxes (SPO-01 and SPO-02) with associated interlock systems; and control panels with 48 VDC and 120 VAC power supplies, emergency stop buttons, alarm systems, and beacon lighting.
The electrical design incorporates multiple layers of safety and control features, including Kirk key interlock sequences to prevent unsafe operation, neutral ground resistor monitoring with dry contact outputs, shunt trip devices controlled via protection relays with specific pickup and time delay settings, and pilot wire safety circuits. The system includes two transformers (T-21 for the medium voltage system and T-02 for low voltage), pad-mounted equipment, and coordination with existing utility infrastructure at the 13.2 kV utility pole connection point. The diagrams specify use of existing conductors and equipment from decommissioned cold ironing systems, including #2/0, #1/0, and #600 copper conductors with associated ground conductors. General notes indicate that disconnect switches are shown in "no-ship" position, all neutral ground resistor and switchgear ground buses connect to a common substation ground grid, and the transformer features NEMA-3R stainless steel enclosure with provisions for future forced air cooling. The control sequence documentation outlines detailed operational procedures for ship arrival, energization, and departure, including verification steps, key interlock management, and communication requirements with vessel personnel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D w n by
D es ig ne d by
R ev ie w ed b y:
D at e:
R ev
C kd b y:
S ub m itt ed b y:
D ra w in g
S ca le
P lo t s ca le
M O
FF
A
TT
N
IC
H O
L
M
N P ro je ct N o.
ra w in g co de es cr ip tio n
D at e A pp r.
M ar k
Sheet Reference No.
1:
(D S
H E
E T)
S U
B M
IT
TE
R 'S
N A
M E
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING
SEAL
A
Fi le
P:
\B O
S\ Pr oj ec ts \2
C
T St at e
Pi er
B er th E le ct rif ic at io n\
C
AD
D
Ac tiv e\ _S he et
Se t\2
4E -6
; P lo tte d:
/1 0/
:0
PM
b y
SH
IT
TU
, H
AB
EE
B ; S av ed
4/
/2
2:
P M b y
H
SH
IT
TU
NOT TO BE USED FOR CONSTRUCTION
FOR (SUBMITTAL NAME)
ISSUED: YYYY-MM-DD
REVISION NAME-YYYY-MM-DD
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
S
TA
TE
P
IE
R
B E
R
TH
E
LE
C
TR
IF
IC
A
TI
O N
S
TA
TE
P
IE
R
C O
M P
LE
X
N E
W L
O N
D O
N , C
O N
N E
C
TI
C U
T
W E
LL
S
A V
E N
U E
, S U
IT
E
N E
W
TO
N , M
A
7-
9-
INDEX: OF
E-601
S
IN
G
LE
L
IN
E D
IA
G
R A
M
INDX
D A
TE
D
S G
N
D R
FT
C
H K
R
R E
V R
R E
V N
O
GROUND BUS
2PTs
11000-120V
TYP
SWITCHGEAR
P1 UPS
120VAC
PANEL
SHORE POWER
OUTLET BOX
SPO-01
ETHERNET
TYP.
ETHERNET
TYP.
1200A BUS, 11KV, 3Ø, 3W, 60HZ, 500MVA
SHORE READY
BREAKER
LOCK K1B
ETHERNET SWITCH/
NETWORK CONTROLLER
SEL-3620
ALARM HORN
48VDC.
50/5 NGR
SENSING
RESISTOR
NGR10: 19.05A
335 OHMS, 10
SEC.
NGR MONITOR &
ALARM.
LITTELFUSE SE-330
HORN
ALARM
SILENCE
LIVE-LINE
INDICATOR
OPEN
CLOSED
600A
15KV
SSVT 15KVA, 11kV- 208Y/120V
SPO-01
MAIN CIRCUIT BREAKER
PNL
GENERAL SHEET NOTES:
1. FOR NOTES, SYMBOLS AND ABBREVIATIONS, SEE SHEET 2.
2. DISCONNECT SWITCHES SHOWN IN "NO-SHIP" POSITION.
3. NGR GROUND AND ALL SWITCHGEAR GROUND BUSSES ARE
TO BE CONNECTED TO COMMON SUBSTATION GROUND
GRID.
PNL
P2
B1 E-601A
SINGLE LINE DIAGRAM
NTS
60A/3P
DRAWING NOTES:
NEUTRAL GROUND RESISTOR AND 50/5 ZERO-SEQUENCE
CURRENT TRANSFORMER IN NEMA-3R STAINLESS STEEL
ENCLOSURE. NGR SUPPLIER TO COORDINATE WITH
SWITCHGEAR MANUFACTURER FOR ALL
INTERCONNECTION TO THE SWITCHGEAR.
#3/0 BARE COPPER GROUND CONDUCTOR TO NGR
GROUND ELECTRODE CONDUCTOR.
SPACE HEATER, WATTAGE & VOLTAGE AS SIZED BY
SWITCHGEAR MANUFACTURER, INCLUDING THERMOSTAT.
SUBSTATION-TYPE TRANSFORMER, DRY-TYPE,
AIR-COOLED, WITH PROVISIONS FOR FUTURE FORCED AIR
COOLING, NEMA-3R STAINLESS STEEL ENCLOSURE.
SEL-751 RELAY. PROVIDE WITH THE IDENTIFIED
FUNCTIONS. PROVIDE WITH 120VAC CONTROL POWER
FROM PANEL P2
THE ALARM HORN IS POWERED FROM THE 48VDC PANEL.
86 LOCK-OUT RELAY: SHALL HAVE MANUAL RESET.
SURGE ARRESTOR.
RED PUSH-ON/PULL-OFF EMERGENCY STOP BUTTON.
PROVIDE WITH CLEAR PLASTIC LIFT UP COVER AND RED
PHENOLIC NAMEPLATE WITH WHITE LETTERING
"EMERGENCY STOP: TRIPS BREAKERS AND CLOSES
EARTHING SWITCH". REFER TO TYPICAL BREAKER CLOSE
SCHEMATIC AND PILOT WIRE SAFETY SCHEMATIC.
BREAKER CONTROL SWITCH CLOSE AND TRIP. PROVIDE
ACRYLIC COVER OVER BREAKER CONTROL SWITCH TO
PREVENT ACCIDENTAL SWITCHING OF THE HANDLE.
GREEN AND RED BREAKER STATUS INDICATORS.
RED - BREAKER CLOSED, GREEN - BREAKER OPEN.
ROOF TOP BEACON IS POWERED FROM PANEL 'P1'.
ROOF TOP BEACON: VISUAL SIGNAL LIGHTING. POSITION
BEACON SUCH THAT IT CAN BE VISIBLE FROM SPO
LOCATIONS.
ROUTE BOTH CABLES THROUGH THE CURRENT
TRANSFORMER.
OFCI SHORE-TO-SHIP POWER ENCLOSURE. SEE E-508A
FOR DETAILS.
AMBER LED TO IDENTIFY IF DEVICE IS ACTIVE.
EACH RELAY SHALL BE INDIVIDUALLY WIRED BACK TO
ETHERNET SWITCH/NETWORK CONTROLLER.
NGR MONITOR: PROVIDE DRY CONTACT OUTPUTS TO THE
SEL-787 FOR THE FOLLOWING FUNCTIONS: OPEN,
SHORTED, OVERHEATED, DISCONNECTED.
SHUNT TRIP DEVICE SHALL BE MONITORED AND
CONTROLLED VIA SEL-787 TRANSFORMER PROTECTION
RELAY AND ENERGIZED UPON ACTIVATION OF THE 50G/51G
RELAY ELEMENTS. 51G PICKUP SHALL BE SET BETWEEN
8-10A ANDTIME DELAY SHALL BE SET NO HIGHER THAN 3
SECONDS AT 19A. 50G PICKUP SHALL BE SET TO
APPROXIMATELY 23A. REFINE SETTINGS AS REQUIRED BY
COORDINATION STUDY.
25kV 600A 4/3W FUSED (WITH SHUNT TRIP)
MOTOR-OPERATED LOAD INTERRUPTER SWITCH. PROVIDE
WITH 27kV E RATED 50kV 175E CURRENT LIMITING FUSES.
PROVIDE 4-SETS NORMALLY OPEN & NORMALLY CLOSED
CONTACTS.
KIRK KEY INPUT TO SEL-751 TO PREVENT BREAKER BEING
CLOSED WITHOUT KEY IN THE CLOSE POSITION.
BUS PT SHALL BE INTERLOCKED TO PREVENT
WITHDRAWAL OF PT DRAWER WHILE BUS IS ENERGIZED.
PROVIDE 208/12OV 3ɸ 3W 10kAIC PANEL.
KIRK INTERLOCK SEQUENCE. WITH KEY LOCKED POSITION
AT SHORE POWER OUTLET BOX,
A. INSERT CABLE AND LOCK IN PLACE TO
OPEN/RELEASE KEY K1A
B. INSERT KEY K1A INTO EARTHING SWITCH TO PERMIT
OPENING OF SWITCH. OPEN SWITCH TO RELEASE
KEY K1B
C. INSERT KEY K1B AND CLOSE AT BREAKER LOCK
SWITCH TO PERMIT CLOSING OF SHORE POWER
BREAKER. SHORE POWER BREAKER MAY ONLY BE
CLOSED ONCE BREAKER LOCK SWITCH IS CLOSED
AND ALL OTHER SAFETY REQUIREMENTS ARE MET,
REFER TO PILOT WIRE SAFETY SCHEMATICS.
GPS SYNC. CLOCK
WITH IRIG/B TIME
SIGNAL OUTPUT
LOW VOLTAGE
POWER
MR-400:5
SEL-700G
P R
52-M10 1200A
350AT
50P
AF
SEL-751
PR1
400:5 3
FIP 19
PAD MOUNTED
TRANSFORMER T-21
SEL-787
27 86
TO PNL
P1
P002
P003
P2C
51N
MR-50:5
E-STOP
K1B K1A
K1A
CB42A
1200A
350AT
(2) 15kV 2E
FUSES (TYP.)
P2C
PROTECTION ELEMENTS
25 - SYNCHRO USED FOR VOLTAGE CHECK, DEAD BUS CONFIRMATION
46 - CURRENT UNBALANCE
67 - DIRECTIONAL OVERCURRENT
32 - DIRECTIONAL POWER
51N - NEUTRAL TIME-OVERCURRENT
27 - UNDERVOLTAGE
59 - OVERVOLTAGE
50 - NEGATIVE SEQUENCE OVERCURRENT
51 - AC INVERSE TIME OVERCURRENT
86 - LOCKOUT RELAY
SHORE POWER
OUTLET BOX
SPO-02
SHORE READY
BREAKER
LOCK K2B
ALARM HORN
48VDC.
HORN
ALARM
SILENCE
LIVE-LINE
INDICATOR
OPEN
CLOSED
600A
15KV
SPO-02
MR-400:5
SEL-700G
P R
TO PNL
P1
P004
P005
51N
MR-50:5
E-STOP
K2B K2A
K2A
CB42A
1200A
350AT
16 P2C
P001
P007
EXISTING VESSEL T-33
TRANSFORMER
13.2KV UTILITY POLE P008
#4 GEC
18MCOV/
15.3KV RMS
2.5 MVA
13.2 - 11kV, 3Ø
E-STOP
E-STOP
#4 GEC
INDEX: OF
E-602
C O
N
TR
O L
W
IR
IN
G
D
IA
G R
A M
INDX
D A
TE
D
S G
N
D R
FT
C
H K
R
R E
V R
R E
V N
O
S U
B M
IT
TE
R
C
LI
EN
T
PR
O
JE
C
T
LO
C A
TI
O
N
ISOLATED TB
PROVIDED
(1)
(2)
(3)
(4)
(5)
(6)
(7)
PILOT LOOP P2A SOURCE
(GROUND CHECK)
EQUIPMENT/COMPONENT TERMINAL
SWITCHGEAR TERMINAL
CIRCUIT BREAKER TERMINAL
PROTECTION/CONTROL/COMM. CABINET TERMINAL
FIELD TERMINAL
CONTROL CABLE CONDUCTOR NUMBER(1)
LEGEND
(2)
(3)
(4)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
IN
TE
R N
A L
TO
C
O N
TR
O
LS
A
N D
M O
N
IT
O R
IN
G
S E
C
TI
O N
O F
U N
IT
S
U B
S
TA
TI
O
N
CONNECTOR PIT
E-STOP
(3)
(4)
(1)
(2)
240V, 20A, 2P
L1
L2
GND
PART OF PANEL PNL-1
(H) -L1 250W
HEATER
(1)
(2)
(3)
(4)
(6) P6
P5
P4
P3
P2
P1
NOTES
1. TYPICAL DETAILS SHOWN FOR SHORE POWER CONNECTOR.
SEE DRAWING E-501
FOR FULL DETAILS
OF PILOT LOOPS
7c#14, TYPE TC, 600V
3c#6, TYPE TC, 600V
#10 GREEN
PIT
GROUNDING
STUDS (x2)
3c#12, TYPE TC, 600V
7c#14, TYPE TC, 600V
SHORE POWER
CONNECTOR PILOT
WIRES
6c#14, TYPE TC, 600V
PANEL PNL-1
TB'S INSIDE SPO-01
(BY CAVOTEC)
(H) -L2
240V, 1PH
HEATER
(5)
(7) P7
SPO-01 OUTLET
GROUND
SHORE PILOT
SAFETY CIRCUIT
SHIP PILOT SAFETY
CIRCUIT
SPARE PILOT
CONTACTS
UNIT SUB-STATION
(1)
A1 E-602A
BERTH 4 CONTROL SINGLE LINE DIAGRAM
NTS
(H) -L1 250W
HEATER
(1)
(2)
(3)
(4)
(6) P6
P5
P4
P3
P2
P1
SEE DRAWING E-501
FOR FULL DETAILS
OF PILOT LOOPS
7c#14, TYPE TC, 600V
SHORE POWER
CONNECTOR PILOT
WIRESTB'S INSIDE SPO-01
(BY CAVOTEC)
(H) -L2
240V, 1PH
HEATER
(5)
(7) P7
SPO-02 OUTLET
D w n by
D es ig ne d by
R ev ie w ed b y:
D at e:
R ev
C kd b y:
S ub m itt ed b y:
D ra w in g
S ca le
P lo t s ca
FF
A
TT
N
IC
H O
L
M
N P ro je ct w in g co cr ip tio n
D at e A pp r.
M ar k
Sheet Reference No.
1:
(D S
H E
E T)
S U
B M
IT
TE
R 'S
N A
M E
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING
SEAL
A
Fi le
P:
\B O
S\ Pr oj ec ts \2
C
T St at e
Pi er
B er th E le ct rif ic at io n\
C
AD
D
Ac tiv e\ _S he et
Se t\2
4E -6
; P lo tte d:
/1 0/
:0
PM
b y
SH
IT
TU
, H
AB
EE
B ; S av ed
1/
/2
3:
P M b y
H
SH
IT
TU
NOT TO BE USED FOR CONSTRUCTION
FOR (SUBMITTAL NAME)
ISSUED: YYYY-MM-DD
REVISION NAME-YYYY-MM-DD
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
S
TA
TE
P
IE
R
B E
R
TH
E
LE
C
TR
IF
IC
A
TI
O N
S
TA
TE
P
IE
R
C O
M P
LE
X
N E
W L
O N
D O
N , C
O N
N E
C
TI
C U
T
W E
LL
S
A V
E N
U E
, S U
IT
E
N E
W
TO
N , M
A
7-
9-
GENERAL SHEET NOTES
1. PROVIDE WARNING TAPE AT DUCT BANK CENTERLINES
2. THE BREAKER LOCK, LOCATED AT THE CONTROL PANEL SECTION, SHALL UTILIZE
A SOLENOID KEY RELEASE UNIT WHICH WILL PREVENT THE KEY FROM BEING
RELEASED WHILE THERE IS VOLTAGE ON ANY PHASE OF THE BUS. THIS
FUNCTION SHALL BE WIRED IN A FAIL SAFE MANNER UTILIZING UNDERVOLTAGE
OR OVERVOLTAGE RELAY(S).
3. THERE SHALL BE ONLY ONE SS INTERLOCK KEY FOR ALL SHORE POWER
SWITCHGEARS.
SHORE TO SHIP
POWER SWITCHGEAR
48VDC
PANEL
20A/2P
MFR-3
MFR-2
ST
LIS
1"C-2#10 AWG
SHUNT TRIP
DEVICE
B1 E-603A
SEQUENCE OF OPERATION DIAGRAM INTERLOCK CONTROL RORO SHORE POWER 11kV N.T.S.
A2 E-603A
SHUNT TRIP DIAGRAM
N.T.S.
KEYNOTE
1. THE BREAKER LOCK, LOCATED AT THE CONTROL PANEL SECTION, SHALL UTILIZE A
SOLENOID KEY RELEASE UNIT WHICH WILL PREVENT THE KEY FROM BEING
RELEASED WHILE THERE IS VOLTAGE ON ANY PHASE OF THE BUS. THIS FUNCTION
SHALL BE WIRED IN A FAIL SAFE MANNER UTILIZING UNDERVOLTAGE OR
OVERVOLTAGE RELAYS (S).
2. THERE SHALL BE ONLY ONE SS INTERLOCK KEY FOR ALL SHORE POWER
SWITCHGEARS.
CONTROL SEQUENCE NOTES
A. NO SHIP AT BERTH:
1. SHORE POWER OUTLET (SPO) GROUND SWITCHES ARE LOCKED IN THE "GROUNDED" POSITION.
2. SPO POWER SWITCHES ARE LOCKED IN THE "OPEN" POSITION.
3. 11,000V CIRCUIT BREAKER (524110) IS OPEN.
4. SPO KEY IS HEW (KA1 AND K2A) CAPTIVE AT SPO RECEPTACLE.
B. SHIP AT BERTH:
1. VERIFY GROUND AND POWER SWITCH POSITIONS, AND LIVE LINE INDICATOR' IS NOT LIT.
2. VERIFY SAFE SHIP PLUG CONDITION.
3. INSERT SHIP PLUGS INTO SPO RECEPTACLE.
4. REMOVE CABLE INTERLOCK KEYS K1A FROM SPO, AND PROCEED TO SUBSTATION WITH THE FLASHING
ROOFTOP BEACON.
5. AT THE SUBSTATION, GO TO THE SPO SWITCH WITH THE FLASHING AMBER LIGHTS (WILL BE FLASHING IF
THE SHORE PILOT CIRCUIT IS COMPLETE), INSERT TRANSFER (K1A OR K2A) KEY INTO SPO GROUND SWITCH.
6. OPEN THE GROUND SWITCH.
7. INSERT THE SPO SELECTOR KEY (SS) INTO APPLICABLE SPO SWITCH.
8. VERIFY BOTH SWITCHGEAR "LIVE LINE INDICATORS" ARE NOT LIT AND CLOSE THE SWITCH. THE SPO AMBER
LIGHT CHANGES FROM FLASHING TO "ON". REMOVE THE "BREAKER LOCK" KEY (K1B OR K2B).
9. INSERT THE 'BREAKER LOCK' KEY (K1B OR K2B) INTO THE 'BREAKER LOCK' ON SPO SWITCH (DENOTED BY
THE FLASHING AMBER INDICATING LIGHT) AND TURN. KEY INTERLOCK SEQUENCE IS NOW COMPLETE AND
THE AMBER LIGHT CHANGES FROM FLASHING TO "ON'.
10.WITH THE "SHIP READY CONFIRMED" AMBER INDICATION LIGHT NOW FLASHING -CONFIRM WITH SHIP'S CREW THAT VESSEL IS READY TO RECEIVE SHORE POWER. AFTER RECEIVING CONFIRMATION, PRESS "SHIP READY CONFIRMED" GREEN PUSHBUTTON. THE AMBER LIGHT CHANGES FROM FLASHING TO "ON'.
11.CHECK THE AMBER LIGHT AT THE LOCKOUT RELAY 86; IT WILL NOW BE FLASHING IF ALL PLC PERIAISSIVES ARE MET. RESET THE LOCKOUT RELAY Vt4 THE MANUAL HANDLE. THE LOCKOUT RELAY SHOULD REMAIN IN
THE "RESET"POSITION AND THE AMBER LIGHT SHOULD CHANGE FROM FLASHING TO "ON".
12.PRIOR TO PROCEEDING, CHECK TO ENSURE THAT THE AMBER "PERMISSIVE TO CLOSE" LIGHT P2C IS
FLASHING ABOVE THE BREAKER CONTROL SWITCH.
13.CLOSE 11,000V CIRCUIT BREAKER 52-MI0 BY BREAKER CONTROL SWITCH AT HMI SECTION. THE ROOFTOP
BEACON CHANGES FROM FLASHING TO ON.
14. VERIFY "SPO ENERGIZED" LIVE LINE INDICATOR IS LIT AT APPLICABLE SPO SWITCH.
15. ADVISE SHIP PERSONNEL OF SHORE POWER "ON" CONDITION.
C. SHIP LEAVING BERTH:
1. ADVISE SHIP PERSONNEL OF IMPENDING POWER "OFF" CONDITION.
2. OPEN11,000V CIRCUIT BREAKER 524110 BY BREAKER CONTROL SWITCH AT HMI SECTION. AMBER LIGHTS
ABOVE BREAKER CONTROL SWITCH, LOCKOUT RELAY. AND "SHIP READY" PUSHBUTTON SHOULD TURN OFF AND THE ROOFTOP BEACON AND AMBER LIGHTS ABOVE THE "BREAKER LOCK" SHOULD BEGIN TO FLASH.
3. VERIFY 'LIVE LINE INDICATORS" ARE NOT LIT (AT HMI SECTION AND SPO SWITCHES).
4. TURN AND REMOVE THE "BREAKER LOCK" KEY (BL) FROM THE BREAKER LOCK AT HMI SECTION. THE AMBER
LIGHT ABOVE THE BREAKER LOCK SHOULD CHANGE FROM FLASHING TO "OFF".
5. PRIOR TO PROCEEDING, CHECK TO ENSURE THAT THE AMBER LIGHT AT THE SPO SWITCH SHOULD NOW BE
FLASHING. INSERT THE "BREAKER LOCK" KEY INTO THE KEY INTERLOCK AT THE SPO SWITCH AND TURN.
OPERATE THE SPO SWITCH FROM THE "CLOSED" POSITION TO THE "OPEN" POSITION. ROOFTOP BEACON
TURNS OFF.
6. TURN AND REMOVE THE SELECTOR KEY (SS). THIS KEY SHALL BE STORED IN AN ACCESS-CONTROLLED
STORAGE.
7. CLOSE GROUND SWITCH
8. TURN AND REMOVE THE CABLE INTERLOCK KEY (CI OR El) FROM THE SPO GROUND SWITCH AND PROCEED
TO THE SPO VAULT. THE AMBER LIGHT AT THE SPO SWITCH SHOULD BE 'OFF".
9. INSERT THE SPO TRANSFER KEY (C1 OR E1) INTO THE SPO VAULT KEY INTERLOCK BOX AND TURN. REMOVE
THE IWO CABLE INTERLOCK KEYS, INSERT INTO THEIR RESPECTIVE INTERLOCKS ON THE RECEPTACLE
HANDLES, AND TURN.
10.TURN AND REMOVE CABLE LATCH BOLT "FORK" KEYS FROM THE RECEPTACLE KEY INTERLOCKS.
11.REMOVE SHIP PLUGS.
12. ADVISE SHIP PERSONNEL THAT SHORE POWER DISCONNECTION OPERATION IS COMPLETE.
LEGEND
BEACON LIGHT
KIRK INTERLOCK WITH KEY
CAPTIVE IN IDLES STAGE OF
SEQUENCE OPERATION
KIRK INTERLOCK
RED SIGNALING
GREEN SIGNALING
AMBER SIGNALING
PUBLISBUTTON
LOCK-OUT RELAY
BREAKER CONTROL SWITCH
SHORE READY
52 52-M10
SOLENOID
BREAKER
LOCK
BREAKER
CONTROL
SWITCH
BREAKER
LOCK
ROOF-TOP
BEACON LIGHT
CABLE PLUG
TETHERING
LATCH BOLT
HORN ALARM
SILENCE
E-STOP
2PTs
BREAKER
LOCK
K1A
SPO-1
LBS-1
GSP-1
K1A
LA
ACCESS
DOOR
GROUND
SWITCH
K1B
BL
K1A
SS
SPO
SELECTION
INTERLOCK
SPO-01
LOCK
MECHANICAL
INTERLOCK
K1B
P2C
OPEN CLOSE
G R
BREAKER
LOCK
CABLE PLUG
TETHERING
LATCH BOLT
K2A
SPO-1
LBS-2
GSP-2
K2A
LA
ACCESS
DOOR
GROUND
SWITCH
K2B
K2A
SS
SPO
SELECTION
INTERLOCK
SPO-02
LOCK
OPEN CLOSE
G R
K2B
~INTERLOCK KEY
SS WITH 11kV
SUBSTATION
MECHANICAL
INTERLOCK
D w n by
D es ig ne d by
R ev ie w ed b y:
D at e:
R ev
C kd b y:
S ub m itt ed b y:
D ra w in g
S ca le
P lo t s ca
FF
A
TT
N
IC
H O
L
M
N P ro je ct w in g co cr ip tio n
D at e A pp r.
M ar k
Sheet Reference No.
1:
(D S
H E
E T)
S U
B M
IT
TE
R 'S
N A
M E
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING
SEAL
A
Fi le
P:
\B O
S\ Pr oj ec ts \2
C
T St at e
Pi er
B er th E le ct rif ic at io n\
C
AD
D
Ac tiv e\ _S he et
Se t\2
4E -6
; P lo tte d:
/1 0/
:0
PM
b y
SH
IT
TU
, H
AB
EE
B ; S av ed
2/
4/
:1
PM
b y H
SH
IT
TU
NOT TO BE USED FOR CONSTRUCTION
FOR (SUBMITTAL NAME)
ISSUED: YYYY-MM-DD
REVISION NAME-YYYY-MM-DD
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
S
TA
TE
P
IE
R
B E
R
TH
E
LE
C
TR
IF
IC
A
TI
O N
S
TA
TE
P
IE
R
C O
M P
LE
X
N E
W L
O N
D O
N , C
O N
N E
C
TI
C U
T
W E
LL
S
A V
E N
U E
, S U
IT
E
N E
W
TO
N , M
A
7-
9-
INDEX: OF
E-603
IN
TE
R
LO
C K
IN
G
C O
N
TR
O L
SI
N
G
LE
L
IN
E D
IA
G
R A
M
INDX
D A
TE
D
S G
N
D R
FT
C
H K
R
R E
V R
R E
V N w n by
D es ig ne d by
R ev ie w ed b y:
D at e:
R ev
C kd b y:
S ub m itt ed b y:
D ra w in g
S ca le
P lo t s ca
FF
A
TT
N
IC
H O
L
M
N P ro je ct w in g co cr ip tio n
D at e A pp r.
M ar k
Sheet Reference No.
1:
(D S
H E
E T)
S U
B M
IT
TE
R 'S
N A
M E
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING
SEAL
A
Fi le
P:
\B O
S\ Pr oj ec ts \2
C
T St at e
Pi er
B er th E le ct rif ic at io n\
C
AD
D
Ac tiv e\ _S he et
Se t\2
4E -6
; P lo tte d:
/1 0/
:1
PM
b y
SH
IT
TU
, H
AB
EE
B ; S av ed
2/
4/
:5
PM
b y H
SH
IT
TU
NOT TO BE USED FOR CONSTRUCTION
FOR (SUBMITTAL NAME)
ISSUED: YYYY-MM-DD
REVISION NAME-YYYY-MM-DD
2 3 4 5 6
B
C
D
E
1 2 3 4 5 6
A
B
C
D
E
S
TA
TE
P
IE
R
B E
R
TH
E
LE
C
TR
IF
IC
A
TI
O N
S
TA
TE
P
IE
R
C O
M P
LE
X
N E
W L
O N
D O
N , C
O N
N E
C
TI
C U
T
W E
LL
S
A V
E N
U E
, S U
IT
E
N E
W
TO
N , M
A
7-
9-
INDEX: OF
E-604
O N
E -L
IN
E
D
IA
G R
A M
INDX
D A
TE
D
S G
N
D R
FT
C
H K
R
R E
V R
R E
V N
O
SPO-01
DISCONNECT
SWITCH
MAIN
MCB
SP
P001
13.2KV UTILITY POLE
ESL 11KV SHORE POWER
CONNECTION SYSTEM,
SEE SHEET E-508
P004
SOUTH COLD IRONING AREA
NORTH COLD IRONING AREA
S
ESL 11KV SHORE POWER
CONNECTION SYSTEM,
SEE SHEET E-508
P005
SWITCHGEAR,
SEE SHEET E-504 & E-505
EXISTING VESSEL T-33
TRANSFORMER
SPO-02
DISCONNECT
SWITCH
TRANSFORMER
T-02
SP
ESL 480V SHORE POWER
CONNECTION SYSTEM
SP0-03, SEE SHEET E-508
P008
NORTH COLD IRONING AREA
SOUTH COLD IRONING AREA
ESL 480V SHORE POWER
CONNECTION SYSTEM
SPO-04, SEE SHEET E-508 PMR 2,
SEE SHEET E-503
PMR 1,
SEE SHEET E-503
VESSEL P-32,
3 SECTION,
PAD MOUNT,
1600A, SWITCHBOARD
WITH 2
DISTRIBUTION
SECTONS
SPD-1
P002
VESSEL LOADING AREA
A1 E-604
LOW VOLTAGE SHORE POWER ONELINE
SCALE: NTS
C1 E-604
MEDIUM VOLTAGE SHORE POWER ONELINE
SCALE: NTS
P010
P011
(E) V-107
P006, EXISTING (3) #600, #2G
CONDUCTOR USED FOR
STEP-UP TRANSFORMER T-21
PAD MOUNTED
TRANSFORMER T-01
P S
(E) V-107
METER
KEYNOTES:
1. PULL EXISTING (3) #2/0, #4G FROM
DECOMMISSIONED COLD IRONING
TRANSFORMER T-21 TO THE PRIMARY SIDE OF
INSTALLED TRANSFORMER T-01 .
2. USE EXISTING (3) #1/0, #4G CONDUCTORS
FROM DECOMMISSIONED TRANSFORMER T-21
TO DECOMMISSIONED COLD IRONING
DISCONNECT D-21 T0 RUN THE CIRCUIT FROM
TRANSFORMER T-01 TO SWITCHGEAR MAIN
BREAKER.
3. PULL EXISTING (3) #2/0, #4G FROM
DECOMMISSIONED COLD IRONING
TRANSFORMER T-21 GOING BACK TO THE
13.2KV UTILITY POLE METER TO THE PRIMARY
SIDE OF TRANSFORMER T-01.
4. PULL EXISTING (3) #600, #2G BACK FROM
DECOMMISSIONED ISOLATION TRANSFORMER
T-22 TO EXISTING VAULT V-107 AND ROUTE IT
TO THE PRIMARY SIDE OF TRANSFORMER T-02.
5. USE REMAINING EXISTING (3) #600, #2G
CONDUCTORS FROM KEYNOTE #3 T0 RUN THE
SHORT LENGTH OF CONDUCTORS FROM
TRANSFORMER T-02 TO SHORE POWER
OUTLET (SPO-03).
P007
P003
#1/0 GEC
#4 GEC
| Sheets and Views |
| E-601 SINGLE LINE DIAGRAM |
| E-602 CONTROL WIRING DIAGRAM |
| E-603 INTERLOCKING CONTROL SINGLE LINE DIAGRAM |
| E-604 ONE-LINE DIAGRAM |
| LOW VOLTAGE SHORE POWER ONELINE |
| MEDIUM VOLTAGE SHORE POWER ONELINE |