ADD 4
98 KB Posted
- Attached to
- Gwinnett County Gateway Monuments Project
- Solicitation number
- BL073-23
- Issued by
- Gwinnett County, Georgia
About this file
This is Addendum 4 to a construction solicitation issued by Gwinnett County Board of Commissioners for the Gateway Monuments Project (BL073-23) in Georgia. The addendum clarifies that contractors must include 500 feet of electrical conduit in their bid costs. This conduit was incorporated into the design to connect to the nearest utility primary service location. Contractors are responsible for coordinating the exact routing of the conduit and pull box placement with the utility company in accordance with detail specifications 1/2.1A keynote 3 and detail 1/2.1B keynote 3. All bidders must acknowledge receipt of this addendum by inserting its number and date in the Bid Form, with failure to do so potentially resulting in bidder disqualification. The addendum was issued on August 25, 2023, and becomes part of the contract documents.
Formal solicitation submissions for Gwinnett County Board of Commissioners must be received by 2:50 p.m. on the stated due date, with late submissions not accepted. The county does not currently accept electronic submittals for formal solicitations. Firms appearing on the Gwinnett County ineligible source list, including those that have been debarred, suspended, or otherwise disqualified, are prohibited from submitting bids or proposals during the period of their ineligibility.
Text of this file
BL073-23 Addendum 3 Page 1 of 1
August 25, 2023
Addendum 4
BL073-23, Gwinnett County Gateway Monuments Project
Clarification:
The 500’ of conduit should be included in the contractors’ costs. The 500’ of conduit was included in the design to connect to the nearest utility primary service location. The contractor is responsible for coordinating the exact routing of the conduit as well as pull box placement with the utility company. Refer to detail 1/2.1A keynote 3 and detail 1/2.1B keynote 3 for installation and coordination requirements with the utility company for the 500’ of conduit for the utility primary service.
All bidders shall acknowledge receipt of this addendum by inserting its number and date in the
Bid Form. Failure to do so may subject the bidder to disqualification. This addendum forms a part of the Contract Documents.
Thank you.
Olivia Graves
Purchasing Associate II
Other files
| File | Type | Posted |
|---|---|---|
| ADD 2 | — | |
| Award Information | — | |
| ADD 1 | — | |
| NOT | — | |
| ADD 3 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .