Add 1 - LMF Propane.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ-171-180000000347-3
- Issued by
- Alger County, Michigan
About this file
This is Pre-Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget's State Facilities Administration Design and Construction Division for the Alger Correctional Facility Propane Plant Blender Replacement project (File No. 472/17042.TAP). The addendum was issued on February 16, 2018, with a bid opening date of March 7, 2018. The addendum includes the attendance sheet from the pre-bid meeting and photographs taken during the site visit showing the existing propane plant equipment and installation.
The photographs document the current propane blender system manufactured by Sam Dick Industries (Model Vaporaire V-31.5-5) installed in 1990, with a mixing capacity of 31.5 MMBTU/hour. The system includes vapor headers rated for 250 PSIG at 650°F, receivers rated for 50 PSIG at 550°F, and is configured for propane/air operation with 120V/50-60Hz/1-phase electrical service. The images show the equipment in winter conditions with snow accumulation, including views of the blender vessels, piping, control panels, and associated infrastructure within a secured, fenced facility area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION PRE-BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
2/16/2018
PROJECT NAME
Alger Correctional Facility Propane Plant Blender Replacement
FILE NUMBER
472/17042.TAP
PROFESSIONAL
Design Build A/E TBD
PROJECT DIRECTOR
Tom Pawlowski
BID OPENING DATE:
3/7/2018
ADDENDUM ITEMS:
Item 1 – Attendance sheet from the PreBid Meeting is attached.
Item 2 – Photos from the PreBid Meeting are attached.
Item 3 - Here ends Pre-Bid Addendum No. 1
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DATE:
APPROVED BY:
PROJECT DIRECTOR: Tom Pawlowski DATE: 2/16/2018
| Binder1.pdf |
| IMG_6655 |
| IMG_6656 |
| IMG_6657 |
| IMG_6658 |
| IMG_6659 |
| IMG_6660 |
| IMG_6661 |
| IMG_6662 |
| IMG_6663 |
| IMG_6664 |
| IMG_6665 |
| IMG_6666 |
| IMG_6667 |
File details come from the government source that posted it. Updated .