AD#2 Summary.pdf
PDF 201 KB Posted
- Attached to
- CR 543 Bridge Replacement
- Solicitation number
- 2024-03
- Issued by
- Kit Carson County, Colorado
About this file
Addendum No. 2 for the CR 543 Bridge Replacement project is issued by Huerfano County, Colorado, for a federal aid project involving the Huerfano River Bridge replacement in Gardner, CO. The addendum modifies the original bid documents, specifically changing the bid date from September 20, 2024, to September 27, 2024, at 1:00 PM MDT. The bid will be held at Huerfano County's office in Walsenburg, with a virtual meeting link to be posted on BidNet for the bid opening. The primary modification involves removing duplicate bid items from the BASE BID and ALTERNATIVE BID sections of the bid form, specifically eliminating redundant items for bridge removal, structural excavation, and structural backfill.
The addendum includes an updated 7-page bid form and is part of a federally funded infrastructure project (Federal Aid Project No. BRO P2C1-004 and CDOT Project Code 22615). The changes are intended to provide clarity and allow bidders sufficient time to review the modifications. The project appears to be a comprehensive bridge replacement with associated roadway improvements, and bidders are required to acknowledge the addendum on the bid form. No specific budget details or funding sources are explicitly stated in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AD#1_00300-BidForm.pdf | ||
| AD#1_Summary.pdf | ||
| 22615_SpecialProvisions_02.pdf | ||
| 22615_Plans_BidSet_03.pdf | ||
| 22615_BidPackage_01.pdf | ||
| AD#1_PreBidMeeting_SignIn.pdf | ||
| AD#1_StreamStats.pdf | ||
| AD#2_00300_Bid Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CR 543 Bridge Replacement Addendum No. 2 KLJ Project 2103‐01555 Page 1 of 1
Federal Aid Project No. BRO P2C1‐004 CDOT Project Code 22615
Huerfano County Project Number IFB 2024‐03
HUERFANO RIVER BRIDGE – CR 543 IN GARDNER, CO
HUERFANO COUNTY, COLORADO
ADDENDUM NO. 2
BID DATE: September 20, 2024 September 27, 2024
BID TIME: 01:00 PM MDT
LOCATION: Huerfano County 401 Main Street Walsenburg, CO 80189
This addendum is written for the purpose of clarification and/or modifications to the Contract Documents.
Acknowledgement of Addenda shall be noted on Section 00300 Bid Form.
QUESTIONS/COMMENTS
The bid opening will be delayed by one week, to September 27th, 2024 at 01:00 PM MST, to allow bidders sufficient time to review ADDENDUM #2.
A link will be posted on BidNet for a virtual meeting to attend the bid opening.
DRAWING AND SPECIFICATION CHANGES
The following changes and/or corrections shall be made to the Project Drawings and Specifications:
1. 00300 – BID FORM
The bid form was modified to remove duplicate bid items showing up in the BASE BID and ALTERNATIVE BID locations. The following Items were removed from the ALTERNATIVE A and ALTERATIVE B bid sections, remaining a part of the BASE BID:
202‐00400 REMOVAL OF BRIDGE
206‐00000 STRUCTURAL EXCAVATION
206‐00100 STRUCTURAL BACKFILL (CLASS 1)
ATTACHMENTS
The following is a list of attachments to Addendum No. 2:
00300 BID FORM (7 pages)
END OF ADDENDUM NO. 2
File details come from the government source that posted it. Updated .