The document is a comprehensive bid set of construction plans for the Huerfano County Department of Public Works, specifically for the County Road 543 Bridge Replacement project over the Huerfano River near Gardner, Colorado. The project involves replacing an existing bridge with a concrete box culvert, including 400 linear feet of roadway approach widening, and is funded through a Federal Aid Project (BRO P2C1-004). The project limits extend from Station 10+37.00 to Station 14+00.08, with a total project length of approximately 0.065 miles. Key construction activities include clearing and grubbing, excavation, removal of the existing bridge structure, in-place casting of a concrete box culvert, placement of roadway embankment, and seeding.
The bid set includes detailed engineering plans covering alignment, typical sections, removal plans, grading, cross-sections, stormwater management, and right-of-way considerations. The estimated quantities include 696 cubic yards of embankment material, 134 cubic yards of topsoil, 643 linear feet of erosion logs, and 0.179 acres of native hydraulic seeding. The project will require various construction traffic control devices, including 2 barricades and 10 construction traffic sign panels. Environmental considerations include wildlife monitoring, lead paint management, and stormwater pollution prevention. The project appears to be competitively bid, with contractors required to provide performance bonds and meet specific construction and environmental specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AD#1_00300-BidForm.pdf | ||
| AD#1_Summary.pdf | ||
| AD#2 Summary.pdf | ||
| 22615_BidPackage_01.pdf | ||
| AD#1_PreBidMeeting_SignIn.pdf | ||
| AD#1_StreamStats.pdf | ||
| AD#2_00300_Bid Form.pdf | ||
| 22615_SpecialProvisions_02.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
END PROJECT
STA 14+00.08
START PROJECT
STA 10+37.00
STR. HU543-S0.1-S69A
HUERFANO RIVER
M U
D D
Y
C R
E E
K
AS NOTED
22615
BRO P2C1-004
PROJECT LOCATION MAP
0.25 MI0' 0.125 MI 0.5 MI
HIGHWAY CONSTRUCTION BID PLANS OF PROPOSED
OF PUBLIC WORKS
HUERFANO COUNTY DEPARTMENT
CONSTRUCTION PROJECT CODE NO. 22615
FEDERAL AID PROJECT NO. BRO P2C1-004
HUERFANO COUNTY, COLORADO
COUNTY ROAD 543 OVER HUERFANO RIVER
NATIONAL HIGHWAY SYSTEM? NO YES
NO YES
R.O.W. Projects:
Related Projects:
R.O.W. Project Description
Project Code: 22615
P. E. UNDER PROJECT:
ACCEPTED:
Project Engineer:
Comments:
Contractor:
Resident Engineer:
PROJECT STARTED:
Contract Information
Project Number: BRO P2C1-004
No Revisions:
Revised:
Void: Sheet Number
Init.CommentsDate:
Sheet Revisions As Constructed r y a n s u n d b e r g
:1
:5
A M
K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
T it le
.d g n
Project No./Code
PoDI / NHS
DIVISION INTEREST (PoDI)?
FHWA PROJECT OF
7/28/2023Print Date:
Horiz. Scale: Vert. Scale: N/A
File Name:
Unit Information
22615RDWY_Title_001.dgn the cover page(s) drawings are applied to
All seals for this set of
S E
C
T
S R
W
S E
C
T
S
R W
GARDNER
(1" = 0.25 MI)
TABULATION OF LENGTH & DESIGN DATA
STATION
FEET
ROADWAY MAJOR
STR.CR 543
CR 543 - BRO P2C1-004, 22615
BEGIN STA. 10+37.00 152.32
BEGIN CIP BOX CULVERT (10'X20') STA. 11+89.32
22 STRUCTURE HU543-S0.1-S69
END CIP BOX CULVERT (10'X20') STA. 12+11.32
END STA. 14+00.08
188.76
TOTAL 341.08 22
SUMMARY OF PROJECT LENGTH FEET MILES
ROADWAY (NET LENGTH) 341.08 0.065
MAJOR STRUCTURE 22 0.004
PROJECT GROSS LENGTH 363.08 0.069
DESIGN DATA CR 543
MINIMUM RADIUS OF CURVE N/A
MAXIMUM GRADE 4.1%
MINIMUM S.S.D. HORIZONTAL N/A
MINIMUM S.S.D. VERTICAL 200'
MAXIMUM DESIGN SPEED 30
POSTED SPEED N/A
2022 DESIGN TRAFFIC <500
2042 DESIGN TRAFFIC <500
CLEAR ZONE DISTANCE (TANGENT) 10 FT
SHEET NO. INDEX OF SHEETS
1 TITLE SHEET
2 STANDARD PLANS LIST
3 TYPICAL SECTIONS
4 GENERAL NOTES
5 SUMMARY OF APPROXIMATE QUANTITIES
6 TABULATION OF EARTHWORK
7 TABULATIONS
8 ALIGNMENT PLANS
9 REMOVAL PLANS
10 PLAN AND PROFILE
11 GRADING PLANS
12 TABULATION OF CONSTRUCTION TRAFFIC CONTROL
13 DETOUR PLAN
14-17 BOX CULVERT PLANS
18-23 STORMWATER MANAGEMENT PLAN
24-26 SWMP SITE MAP
27 SURVEY TABULATION SHEET
28-29 ROW PLANS AND PROJECT CONTROL DIAGRAM
XS1-XS6 CROSS SECTIONS
08/16/23
BID SET
https://adobecancelledaccountschannel.na2.documents.adobe.com/verifier?tx=CBJCHBCAABAAhZ5IyUTuNW1WjQK67qQa0VGNS0Yb9bCT
M-100-1
M-208-1
M-203-1
M-203-2
M-203-11
STANDARD SYMBOLS (3 SHEETS)
APPROACH ROADS
DITCH TYPES
M-203-12
M-206-1
M-206-2
M-214-1
M-412-1
M-510-1
M-601-1
M-601-2
M-601-3
M-601-10
M-601-11
M-601-12
M-601-20
M-603-1
M-603-2
M-603-3
M-603-10
M-604-10
M-604-11
M-604-12
M-604-13
M-604-20
M-605-1
SUPERELEVATION STREETS (2 SHEETS)
EXCAVATION AND BACKFILL FOR BRIDGES (2 SHEETS)
CONCRETE PAVEMENT JOINTS (9 SHEETS)
STRUCTURAL PLATE PIPE H-20 LOADING
HEADWALL FOR PIPES
TYPE "S" SADDLE HEADWALLS FOR PIPE
HEADWALLS AND PIPE OUTLET PAVING
REINFORCED CONCRETE PIPE
PRECAST CONCRETE BOX CULVERT
INLET, TYPE C
INLET, TYPE D
CURB INLET TYPE R (2 SHEETS)
CONCRETE INLET TYPE 13
MANHOLES (3 SHEETS)
SUBSURFACE DRAINS
1-3
M-607-1
M-607-2
M-607-3
M-607-4
M-607-10
M-608-1
M-609-1
M-611-1
M-615-1
M-615-2
M-616-1
M-620-1
M-620-2
M-620-11
M-620-12
WIRE FENCES AND GATES (3 SHEETS)
CHAIN LINK FENCE (3 SHEETS)
BARRIER FENCE
PICKET SNOW FENCE
CURB RAMPS (10 SHEETS)
CATTLE GUARD (2 SHEETS)
EMBANKMENT PROTECTOR TYPE 3
EMBANKMENT PROTECTOR TYPE 5
INVERTED SIPHON
FIELD LABORATORY CLASS 1
FIELD OFFICE CLASS 1
FIELD OFFICE CLASS 2
M-210-1 MAILBOX SUPPORTS (2 SHEETS)
M-614-1 RUMBLE STRIPS (3 SHEETS)
M-629-1 SURVEY MONUMENTS (2 SHEETS)
19-29
17-18
30-31
35-39
41-42
43-44
45-46
52-55
67-68
70-72
GUARDRAIL TYPE 7 F-SHAPE BARRIER (4 SHEETS)M-606-13
138-147
148-151
152-153
156-158
169-170
73-77VANE GRATE INLET (5 SHEETS)M-604-25
PRECAST TYPE 7 CONCRETE BARRIER (4 SHEETS)M-606-14
ROAD CLOSURE GATE (9 SHEETS)M-607-15
15-16
159-160SAND BARREL ARRAYS (2 SHEETS)M-614-2
S-614-40 219-223
TUBULAR STEEL SIGN SUPPORT DETAILS (7 SHEETS)S-614-8 198-204
290-313
281-289
255-266S-614-50
224-227
211-214
196-197
194-195
191-193
187-188
171-178DELINEATOR INSTALLATIONS (8 SHEETS)
FLASHING BEACON (PORTABLE) DETAILSS-630-3
PAVEMENT MARKINGS (11 SHEETS)
TYPICAL MULTI-SIGN INSTALLATIONS
TYPICAL POLE MOUNT SIGN INSTALLATIONS
FLASHING BEACON AND SIGN INSTALLATIONS (4 SHEETS)
MARKER ASSEMBLY INSTALLATIONS
CLASS III SIGNS (3 SHEETS)
CLASS II SIGNS
CLASS I SIGNS
GROUND SIGN PLACEMENT (2 SHEETS)
S-627-1
S-630-2
S-630-1
S-614-40A
S-614-22
S-614-21
S-614-20
S-614-14
S-614-12
S-614-10
S-614-6
S-614-5
S-614-4
S-614-3
S-614-2
S-614-1
S-612-1
M-603-4
S-614-11 MILEPOST SIGN DETAIL FOR HIGH SNOW AREAS
METAL PIPE (4 SHEETS)
M-603-5 POLYVINYL CHLORIDE (PVC) PIPE (AASHTO M304)
M-100-2
TEMPORARY EROSION CONTROL (11 SHEETS)
CURBS, GUTTERS, AND SIDEWALKS (4 SHEETS)
S-630-4
S-630-5
S-630-6 EMERGENCY PULL-OFF AREA (TEMPORARY)
S-630-7
PORTABLE RUMBLE STRIPS (TEMPORARY) (2 SHEETS)
13-14
119-121
123-127
129-137
318-319
ACRONYMS AND ABBREVIATIONS (4 SHEETS) 4-7
10-12
116-118
FIELD LABORATORY CLASS 2 (2 SHEETS) 165-166
S-614-9
S-614-41
241-244S-614-42 CABINET FOUNDATION DETAIL (4 SHEETS)
245-252S-614-43
267-280S-614-60 DYNAMIC SIGN MONOTUBE STRUCTURES (14 SHEETS)
316-317
DETAILS (2 SHEETS)
STEEL SIGN SUPPORT (TEMPORARY) INSTALLATION
321-323ROLLING ROADBLOCKS FOR TRAFFIC CONTROL (3 SHEETS)
STATIC SIGN MONOTUBE STRUCTURES (12 SHEETS)
M-216-1 33-34
50-51WINGWALLS FOR PIPE OR BOX CULVERTS (2 SHEETS)
CORRUGATED POLYPROPYLENE PIPE (AASHTO M330) (2 sheets)
CORRUGATED POLYETHYLENE PIPE (AASHTO M294) AND
M-603-6
RIBBED PIPE (AASHTO MP 20)
STEEL REINFORCED POLYETHYLENE 60
M-606-1 79-97
31 INCHES (19 SHEETS)
MIDWEST GUARDRAIL SYSTEM TYPE 3 W-BEAM
102-104
M-606-15 105-115
(11 SHEETS)
GUARDRAIL TYPE 9 SINGLE SLOPE BARRIER
DEER FENCE, GATES, AND GAME RAMPS (7 SHEETS)
M-611-2 154-155DEER GUARD (2 SHEETS)
Sheet RevisionsComputer File Information
CommentsDate:Creation Date:
Last Modification Date:
R-X
R-X
R-X
R-X
07/31/19
05/16/24
Designer Initials:
Detailer Initials:
CAD Ver.: MicroStation V8 Scale: Not to Scale Units: English
JBK
LTA
SOIL RETENTION COVERING (2 SHEETS)
(2 SHEETS)
SINGLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
(2 SHEETS)
DOUBLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
(2 SHEETS)
TRIPLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
DIVIDED HIGHWAYS (3 SHEETS)
SUPERELEVATION CROWNED AND
(2 SHEETS)
EXCAVATION AND BACKFILL FOR STRUCTURES
FOR CLASS III SIGNS (2 SHEETS)
CONCRETE FOOTINGS AND SIGN ISLANDS
M-603-12 62-64
CONCRETE AND METAL END SECTIONS 61
NURSERY STOCK DETAILS
98-101
PEDESTRIAN PUSH BUTTON POST ASSEMBLY (2 SHEETS) 205-206
STRUCTURE NUMBER INSTALLATION (2 SHEETS) 209-210
216-217
(2 SHEETS)
CONCRETE BARRIER SIGN POST INSTALLATIONS
65'-75' SINGLE MAST ARMS (5 SHEETS)
TYPICAL TRAFFIC SIGNAL 30'-75' DOUBLE MAST ARMS
(26 SHEETS)
TRAFFIC CONTROLS FOR HIGHWAY CONSTRUCTION
AND VERTICAL PANELS
BARRICADES, DRUMS, CONCRETE BARRIERS (TEMP)
25'-55' SINGLE MAST ARMS (4 SHEETS)
ALTERNATIVE TRAFFIC SIGNAL
TEMPORARY SPAN WIRE SIGNALS (13 SHEETS) 228-240
COLORADO
DEPARTMENT OF TRANSPORTATION
July 31, 2019
M&S STANDARDS PLANS LIST
BY DESIGNATED PAY ITEM OR SUBSIDIARY ITEM.
AND REVISED, APPLY TO THIS PROJECT WHEN USED
ALL OF THE M&S STANDARD PLANS, AS SUPPLEMENTED
PLAN NUMBER M STANDARD TITLE PAGE NUMBER
179-186S-613-1 ROADWAY LIGHTING (6 SHEETS)
(7 SHEETS)
TRAFFIC LOOP AND MISCELLANEOUS SIGNAL DETAILS
253-254S-614-44 PEDESTAL POLE SIGNALS (2 SHEETS)
FOR CLASS III SIGNS (2 SHEETS)
BREAK-AWAY SIGN SUPPORT DETAILS
(3 SHEETS)
TRAVERSABLE END SECTIONS AND SAFETY GRATES
M-412-2 CONCRETE PAVEMENT CRACK REPAIR (6 SHEETS)
(REVISED ON SEPTEMBER 6, 2022)
IN CONSTRUCTION IF APPROVED BY AN APPROPRIATE CDOT ENGINEER.
PLANS. ALL OTHER M&S STANDARD PLANS ARE STILL ELIGIBLE FOR USE
INDICATED BY A MARKED BOX , AND WILL BE ATTACHED TO THE
THE M&S STANDARD PLANS USED TO DESIGN THIS PROJECT ARE
(REVISED ON SEPTEMBER 30, 2020)
(SUPERSEDED ON JANUARY 23, 2020 BY S-614-45)
S-614-45 PEDESTRIAN PUSH BUTTON POST ASSEMBLY DETAILS (6 SHEETS)
(REVISED ON DECEMBER 3, 2020)
(REVISED ON MARCH 5, 2020)
(REVISED ON FEBRUARY 17, 2023)
(REVISED ON FEBRUARY 9, 2023)
(REVISED ON JULY 13, 2020)
(REVISED ON SEPTEMBER 10, 2020)
(REVISED ON SEPTEMBER 21, 2020)
S-613-2 ALTERNATIVE ROADWAY LIGHTING (4 SHEETS)
(NEW, ISSUED ON SEPTEMBER 30, 2020)
(REVISED ON MARCH 1, 2024)
(REVISED ON JANUARY 31, 2022)
(REVISED ON MARCH 7, 2022)
(REVISED ON JULY 22, 2022)
(REVISED ON JULY 22, 2022)
(REVISED ON APRIL 30, 2024)
(REVISED ON FEBRUARY 3, 2023)
S-613-4 TRAFFIC SIGNAL ONE-LINE DIAGRAMS (6 SHEETS)
(NEW, ISSUED ON JUNE 15, 2023)
(REVISED ON APRIL 30, 2024)
Revised on May 16, 2024
MARCH 1, 2024)
(REVISED ON
(REVISED ON MARCH 1, 2024)
(REVISED ON MARCH 1, 2024)
MARCH 1, 2024)
(REVISED ON
MARCH 1, 2024)
(REVISED ON
J-POST SIGN SUPPORT (3 SHEETS)S-614-23 (NEW, ISSUED ON MAR. 1, 2024)
PLAN NUMBER M STANDARD TITLE PAGE NUMBER PLAN NUMBER S STANDARD TITLE PAGE NUMBER
S-613-3 PULL BOX DETAIL (2 SHEETS)(NEW, ISSUED ON APRIL 4, 2024)
(REV. APRIL 30, 2024)
(REVISED ON APRIL 4, 2024)
CHAIN STATION SIGNAGE (1 SHEET)S-614-15 (NEW, ISSUED ON APRIL 30, 2024)
APRIL 4, 2024)
(REVISED ON
(REVISED ON MAY 16, 2024)
STANDARD PLAN NO.
Project Sheet Number: 2Issued by the Project Development Branch: July 31, 2019
STANDARDS PLANS LIST
PLANS LIST
STANDARD
Standard Sheet No. 1 of 1
SPECIFIC NOTES:
STA. 12+51.03 TO STA. 12+97.10
1:10 TAPER FROM 13' LANE WIDTHS TO EXISTING FROM
STA. 10+89.55 TO STA. 11+29.72
1:10 TAPER FROM EXISTING TO 13' LANE WIDTHS FROM1
STA. 12+55.48 TO STA. 12+89.18
1:10 TAPER FROM 13' LANE WIDTHS TO EXISTING FROM
STA. 11+11.11 TO STA. 11+48.56
1:10 TAPER FROM EXISTING TO 13' LANE WIDTHS FROM
BARBWIRE FENCE SET ON ROW LINE5
3:1 3:1
MIN.
3' 0"
MIN.
3' 0"
13' 0" LANE 13' 0" LANE
28' 0" ~ WIDTH OF ROADWAY
6" ABC CL. 6
12" RECOMPACTED SUBGRADE
2.00% 2.00%
P.G.L.
H.P.
H.P.
P.O.S.S. P.O.S.S.
VAR.
CL
P.G.L. ~ Profile Grade Line
H.P. ~ Hinge Point
P.O.S.S. ~ Point of Slope Selection
~ Minimum 4" Topsoil or Specified Alternative
1' 0" SHLD 1' 0" SHLD
PROPOSED TYPICAL SECTION
CR 543
STA. 10+37.00 TO STA. 14+00.08
STA. 11+80.86 TO STA. 12+73.12
STA. 11+29.72 TO STA. 12+21.16
3:1
3' 9"
3:1
3' 9"
EXISTING TYPICAL SECTION
15' 0"
CL
3:13:1
1' 0" SHLD 1' 0" SHLD
2:1 MAX
2:1 MAX
VAR. VAR.
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
TYPICAL SECTIONS
R y a n
S u n d b e r g
:0
:5
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
T y p ic a l_
.d g n
22615RDWY_Typical_01.dgn
Project No./Code the cover page(s) drawings are applied to
All seals for this set of
HU543-S0.1-S69A
1 of 1 3
N/A
GENERAL NOTES
GENERAL NOTES
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
R y a n
S u n d b e r g
:0
:1
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
G e n e r a l
N o te s
.d g n
22615RDWY_General Notes _01.dgn
Project No./Code the cover page(s)
IMPROVEMENTS.
UTILITY LOCATES PRIOR TO COMMENCING ANY TYPE OF EXCAVATION, GUARDRAIL INSTALLATION OR OTHER NO UTILITY CONFLICTS HAVE BEEN IDENTIFIED WITHIN THE PROJECT LIMITS. THE CONTRACTOR SHALL REQUEST4.
4. TO COMPLY WITH SECTION 404 OF THE CLEAN WATER ACT, A NATIONWIDE PERMIT NUMBER 23 APPROVED
CATEGORICAL EXCLUSIONS PROJECTS WAS OBTAINED. GENERAL CONDITIONS OF THAT PERMIT SHALL BE M ET BY THE
CONTRACTOR.
5. SILVER PAINT ON THE BRIDGE ABUTMENTS TESTED POSITIVE FOR LEAD AT A CONCENTRATION OF 0.24%. A MATERIALS
MANAGEMENT PLAN IS RECOMMENDED. WORKERS SHALL EXERCISE CAUTION DURING THE REMOVAL AND DISPOSAL
OF PAINTED COMPONENTS. SHOULD ANY PAINTED METAL COMPONENTS BE REMOVED, THEY MUST BE RECYCLED AND
THE RECYCLING FACILITY MUST BE NOTIFIED OF THE LEAD CONTENT. ANY PAINT REMOVED FROM THESE STRUCTURES
SHALL BE CAPTURED AND CONTAINED TO PREVENT THE RELEASE OF LEAD INTO THE ENVIRONMENT. PLEASE REFER TO
CDOT SPECIFICATION 250.04, 29 CFR 1926.62, STATE AND LOCAL AIR QUALITY REGULATIONS, THE INDUSTRIAL LEAD
PAINT REMOVAL HANDBOOK (SSPC 91-18), AND THE REFERENCES CONTAINED THEREIN.
6. IF PALEONTOLOGICAL RESOURCES ARE UNCOVERED DURING PROJECT CONSTRUCTION, WORK IN THE IMMEDIATE AREA
OF THE FIND SHOULD CEASE AND THE CDOT STAFF PALEONTOLOGIST SHOULD BE NOTIFIED AS SOON AS POSSIBLE PER
SECTION 107.23 OF THE STANDARD SPECIFICATIONS.
UTILITY GENERAL NOTES:
1. EXISTING LINES AS SHOWN ON THE PLAN SHEETS ARE PLOTTED FROM THE BEST AVAILABLE INFORMATION (ASCE
STANDARD QUALITY LEVEL D).
2. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SUBSECTION 105.11 OF THE STANDARD SPECIFICATIONS AND THE
UTILITY PROJECT SPECIAL PROVISIONS CONCERNING UTILITIES. THE CONTRACTOR SHALL COORDINATE AND
COOPERATE WITH UTILITY OWNERS IN THE THEIR REMOVAL, ADJUSTMENT AND/OR RELOCATION OPERATIONS SO THAT
THE UTILITY WORK CAN BE ACCOMPLISHED WITHOUT IMPACTING THE CONSTRUCTION SCHEDULE.
3. THE CONTRACTOR SHALL COMPLY WITH ARTICLE 1.5 OF TITILE 9, CRS ("EXCAVATION REQUIREMENTS") WHEN
EXCAVATING OR GRADING IS PLANNED IN THE AREA OF UNDERGROUND UTILITY FACILITIES. THE CONTRACTOR SHALL
NOTIFY ALL AFFECTED UTILITIES AT LEAST TWO (2) BUSINESS DAYS, NOT INCLUDING THE ACTUAL DAY NOTICE, PRIOR TO
COMMENCING SUCH OPERATIONS. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF
COLORADO (UNCC) AT 811 OR 1-800-922-1987, TO HAVE LOCATIONS OF UNCC REGISTERED LINES MARKED BY MEMBER
COMPANIES. ALL OTHER UNDERGROUND FACILITIES THE CONTRACTOR SHALL CALL THE CDOT REGION 3 TRAFFIC
SECTION AT 970-683-7534 TO REQUEST LOCATES. CDOT IS NOT CONTACTED WHEN LOCATES ARE REQUESTED THROUGH
THE UNCC. UTILITY SERVICE LATERALS SHALL ALSO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING.
1. ALL AREAS WITHIN THE CONSTRUCTION LIMITS SHALL BE CLEARED AND GRUBBED. CLEARING AND GRUBBING SHALL
INCLUDE REMOVAL AND DISPOSAL OF TRASH, DEBRIS, LARGE ROCKS, TREES, TREE STUMPS, BUSHES, LANDSCAPING, ETC. UNLESS SPECIFICALLY DESIGNATED TO REMAIN.
2. DEPTH OF MOISTURE-DENSITY CONTROL FOR THIS PROJECT SHALL BE AS FOLLOWS:
- FULL DEPTH OF ALL EMBANKMENTS
3. TYPE OF COMPACTION FOR THIS PROJECT WILL BE AASHTO T99. WATER USED FOR COMPACTION WILL NOT BE PAID FOR
SEPARATELY BUT SHALL BE INCLUDED IN THE WORK.
4. WATER SHALL BE USED AS A DUST PALLIATIVE WHERE REQUIRED. LOCATIONS SHALL BE AS ORDERED AND WILL NOT BE
PAID FOR SEPARATELY BUT INCLUDED IN THE WORK.
5. SHOULDERING MATERIAL FROM EDGE OF PAVEMENT TO P.O.S.S. SHALL BE COMPACTED USING MOISTURE DENSITY
CONTROL AASHTO T-99.
6. ALL MATERIAL GENERATED WITHIN THE PROJECT LIMITS SHALL BE REMOVED FROM THE PROJECT SITE AT NO COST TO
THE PROJECT UNLESS SPECIFIED BY THE PLANS.
7. THE CONTRACTOR SHALL REPLACE AT THE CONTRACTOR'S EXPENSE ANY EXISTING SIGNS DAMAGED BY CONTRACTOR.
8. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN DRAINAGE DURING THE WORK. ANY REWORK OF MATERIALS
DUE TO LACK OF THE MAINTENANCE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
9. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN DRAINAGE DURING THE WORK. REFERENCE PROJECT SPECIAL
PROVISION 208, WATER CONTROL, FOR REQUIREMENTS.
10.
WATER IN ACCORDANCE WITH CDOT SPECIFICATION 107.25.
THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN, IF REQUIRED, A DEWATERING PERMIT FOR THE DISCHARGE OF
CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF DISTURBANCE
AND/OR TOES OF SLOPES SHOWN ON PLANS. ANY DISTURBANCE BEYOND THESE LIMITS SHALL BE RESTORED TO
ORIGINAL CONDITION BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. CONSTRUCTION ACTIVITIES IN ADDITION
TO NORMAL CONSTRUCTION PROCEDURE SHALL INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL OF
LITTER AND ANY OTHER ACTION WHICH WOULD ALTER EXISTING CONDITIONS.
13.EROSION CONTROL MEASURES MUST BE IMPLEMENTED BEFORE CONSTRUCTION AND GRADING OPERATIONS BEGIN.
14.IT IS ESTIMATED THAT 1 ITEM 620-00020 SANITARY FACILITY (EACH), 1 ITEM 625-00000 CONSTRUCTION SURVEY, AND
1 ITEM 626-00000 MOBILIZATION (LUMP SUM) WILL BE REQUIRED FOR THIS PROJECT.
15.PUBLIC INFORMATION SERVICES (TEIR IV) SHALL BE REQUIRED FOR THIS PROJECT BY CONTRACTOR AND SHALL BE PAID
FOR AS ITEM 626-01114 PUBLIC INFORMATION SERVICES (TIER IV) LS.
16.CLEARING AND GRUBBING (LUMP SUM ) SHALL BE REQUIRED FOR THIS PROJECT.
ENVIRONMENTAL GENERAL NOTES:
1. IT IS ESTIMATED THAT 40 HOURS OF ITEM 240-00000 WILDLIFE BIOLOGIST, 10 HOURS OF ITEM 240-00010 REMOVAL
OF NESTS, AND 400 SY OF ITEM 240-00020 NETTING WILL BE REQUIRED ON THIS PROJECT.
2. THE CONTRACTOR SHALL ENSURE THAT NO MATERIALS, EQUIPMENT, OR VEHICLES ARE STAGED OR PARKED WITHIN 100
FEET OF RIPARIAN, OR DRAINAGE AREAS, UNLESS SPECIFICALLY ALLOWED AS NOTED IN THE PLANS.
3. THE CONTRACTOR SHALL NOT PARK ANY VEHICLES OR EQUIPMENT IN, OR DISTURB ANY AREAS NOT APPROVED BY THE
ENGINEER; THE CONTRACTOR SHALL ADHERE TO THE CONSTRUCTION LIMITS AS NOTED IN THE PLANS AND DEMARCATE
THE WORK AREA TO PREVENT GROUND DISTURBANCE OUTSIDE THOSE PRESCRIBED AREAS.
11.
ASSOCIATED FEE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
SIGNED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUISITION OF THE DEMOLTION PERMIT AND ANY A BRIDGE INSPECTION HAS BEEN COMPLETED BY A CERTIFIED INSPECTOR AND A DEMOLITION APPLICATION HAS BEEN
12.THE
CONTRACT
ITEM NO.
CONTRACT ITEM UNITS
ROADWAY STRUCTURE PROJECT TOTALS
PLAN AS CONST. PLAN AS CONST. PLAN AS CONST.
201-00000 Clearing and Grubbing LS 1 1
202-00033 Removal of Pipe EACH 1 1
202-00400 Removal of Bridge EACH 1 1
202-00815 Removal of Sign (Special) EACH 1 1
202-01130 Removal of Guardrail Type 3 LF 155 155
202-01000 Removal of Fence LF 526 526
203-00060 Embankment Material (Complete In Place) CY 696 696
206-00000 Structure CY 637 637
206-00100 Structure (Class 1) CY 655 655
207-00700 Topsoil (Onsite) CY 134 134
208-00002 Erosion Log Type 1 (12 Inch) LF 643 643
208-00020 Silt Fence LF 50 50
208-00070 Vehicle Tracking Pad EACH 2 2
208-00400 Water Control LS 1 1
212-00702 Soil Amendments (Hydraulically Applied) LB 627 627
212-00704 Mycorrhizae LB 11 11
212-00707 Seeding Hydraulic ACRE 0.179 0.179
216-00101 Soil Blanket (Straw-Coconut) (Photodegradable Class 1) SY 867 867
240-00000 Wildlife Biologist HOUR 40 40
240-00010 Removal of Nests HOUR 10 10
240-00020 SY 400 400
304-06007 Aggregate Base Course (Class 6) CY 563 563
420-00102 (Erosion Control) (Class 1) SY 636 636
601-03030 Concrete Class D (Box Culvert) CY 119.4 119.4
602-00000 Reinforcing Steel LB 34,299 34299
603-10480 48 Inch Corrugated Steel Pipe LF 46 46
606-00302 Guardrail Type 3 (31 Inch Midwest Guardrail System) LF 137 137
606-01390 End Anchorage Type 3K EACH 4 4
607-01000 Fence Barbed Wire with Metal Posts LF 564 564
607-60116 16 Foot Gate EACH 1 1
620-00020 Sanitary Facility EACH 1 1
625-00000 Surveying LS 1 1
626-00000 LS 1 1
630-80335 Barricade (Type 3 M-A) (Temporary) EACH 2 2
630-80342 Sign (Panel Size B) EACH 10 10
700-70010 F/A Minor Contract Revisions FA 1 1
700-70016 F/A Fuel Cost Adjustment FA 1 1
700-70023 F/A On-The-Job Trainee FA 1 1
700-70380 F/A Erosion Control FA 1 1
ALTERNATE BID ITEMS (PRECAST BOX CULVERT)
CONTRACT
ITEM NO.
CONTRACT ITEM UNITS
ROADWAY STRUCTURE PROJECT TOTALS
PLAN AS CONST. PLAN AS CONST. PLAN AS CONST.
202-00400 Removal of Bridge EA 1 1
206-00000 Structure CY 637 637
206-00100 Structure (Class 1) CY 655 655
601-03030 Concrete Class D (Box Culvert) CY 42.6 43
602-00000 Reinforcing Steel LB 7105 7105
603-72011 20X10 Foot Concrete Box Culvert (Precast) LF 34.5 35
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
QUANTITIES
SUMMARY OF APPROXIMATE
R y a n S u n d b e r g
:0 :2
A
M K
P r o je c ts
\C o u n ty
\C O
\H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b \C
A D
\P la n s \2
R
D W
Y S
A Q
.d g n
22615RDWY_SAQ.dgn
Project No./Code the cover page(s)
1 of 1 5
SUMMARY OF EARTHWORK QUANTITIES
PAY QUANTITIES:
EMBANKMENT MATERIAL (COMPLETE IN PLACE) CUBIC YARDS
ROADWAY REGULAR EMBANKMENT QUANTITY (SEE NOTE 4) 695
ADJUSTMENT FOR PROPOSED FINAL TOPSOIL PLACEMENT (ASSUMED 6" FINAL TOPSOIL DEPTH) 134
ADDITIONAL EMBANKMENT QUANTITY FOR REMOVAL OF EXISTING TOPSOIL (ASSUMED 4" REMOVED EXISTING TOPSOIL DEPTH) 135
ADDITIONAL EMBANKMENT FROM STRUCTURE QUANTITIES (SEE NOTE 3) 0
TOTAL FOR EMBANKMENT MATERIAL (COMPLETE IN PLACE) PAY QUANTITY 696
TOPSOIL CUBIC YARDS
TOTAL TOPSOIL PAY QUANTITY 134
FOR INFORMATION ONLY:
UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE) CUBIC YARDS
ROADWAY REGULAR UNCLASSIFIED EXCAVATION QUANTITY 370
ADJUSTMENT FOR REMOVAL OF EXISTING TOPSOIL (ASSUMED 4" REMOVED EXISTING TOPSOIL DEPTH) 135
ADDITIONAL UNCLASSIFIED EXCAVATION QUANTITY FOR CUT SLOPE TREATMENT 19
TOTAL QUANTITY FOR UNCLASSIFIED EXCAVATION MATERIAL (COMPLETE IN PLACE) 254
FOR INFORMATION ONLY - EARTHWORK BALANCE
UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE) (CUT) CUBIC YARDS
TOTAL UNCLASSIFIED EXCAVATION 254
TOTAL MATERIAL AVAILABLE FROM EXCAVATION 254
EMBANKMENT MATERIAL (COMPLETE IN PLACE) (FILL) CUBIC YARDS
EMBANKMENT MATERIAL 696
TOTAL MATERIAL NEEDED FOR EMBANKMENTS 696
EMBANKMENT MATERIAL EXPANDED
TOTAL EMBANKMENT MULTIPLIED BY COMPACTION FACTOR (SEE NOTE 1) 800
BALANCE
TOTAL MATERIAL NEEDED FROM CONTRACTOR'S SOURCE
TOTAL QUANTITY NEEDED FOR EMBANKMENT LESS TOTAL MATERIAL AVAILABLE FROM EXCAVATION 547
Notes:
1. THE COMPACTION FACTOR FOR ONSITE MATERIALS IS ASSUMED TO BE 1.15
2. AS NEEDED FOR UNCLASSIFIED EXCAVATION AROUND STRUCTURES OUTSIDE OF STRUCTURE EXCAVATION AS SHOWN ON M-206-1 AND M-206-2 (NOT STRUCTURE EXCAVATION)
3. AS NEEDED FOR EMBANKMENT AROUND STRUCTURES OUTSIDE OF THE STRUCTURE BACKFILL. DOES NOT INCLUDE STRUCTURE BACKFILL.
4. THIS VALUE DOES NOT INCLUDE ITEMS PAID FOR SEPARATELY I.E. BASECOURSE, HARDSCAPE, TOPSOIL ETC.
5. OVERBUILD REQUIRED TO MEET THE EARTHWORK SPECIFICATIONS IS REQUIRED BUT IS NOT INCLUDED OR CALCULATED IN THIS TABULATION.
6. REMOVAL OF EXISTING TOPSOIL IS PAID FOR AS CLEARING AND GRUBBING.
7. STRUCTURAL FILL WAS CALCULATED SEPARATELY AND IS NOT INCLUDED IN THE EMBANKMENT QUANTITY.
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
TABULATION OF EARTHWORK
R y a n S u n d b e r g
:0 :3
A
M K
P r o je c ts
\C o u n ty
\C O
\H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b \C
A D
\P la n s \2
R
D W
Y E a r th w o r k T
A B
.d g n
22615RDWY_Earthwork_TAB.dgn
Project No./Code the cover page(s)
1 of 1 6
GUARDRAIL
ALIGNMENT STATION TO STATION SIDE
606-00302 606-01390
NOTES
GUARDRAIL TYPE 3
(31 INCH MIDWEST
GUARDRAIL
SYSTEM)
END ANCHORAGE
TYPE 3K
LIN FT EACH
ALG_PRO-543 11+25.22 TO 12+23.88 RT 69 2
ALG_PRO-543 11+77.69 TO 12+77.75 LT 68 2
TOTALS 137 4
SURFACING
ALIGNMENT STATION TO STATION
304-06007
NOTES
AGGREGATE
BASE COURSE
(CLASS 6)
CU YD
ALG_PRO-543 10+37.00 TO 14+00.08 1689
TOTALS 1689
REMOVALS
ALIGNMENT STATION TO STATION SIDE
202-00033 202-00810 202-01000 202-01130
NOTES
REMOVAL
OF PIPE
REMOVAL
OF
GROUND
SIGN
REMOVAL
OF FENCE
(1)
REMOVAL
OF
GUARDRAIL
TYPE 3
EACH EACH LIN FT LIN FT
ALG_PRO-543 12+78.28 TO 12+80.13 LT/RT 1
ALG_PRO-543 10+59.40 TO 10+80.60 LT 21 BARBED WIRE FENCE
ALG_PRO-543 10+69.84 TO 10+88.62 RT 19 BARBED WIRE FENCE
ALG_PRO-543 11+02.53 TO 11+17.20 LT 15 BARBED WIRE FENCE
ALG_PRO-543 11+11.17 TO 11+80.48 RT 69 BARBED WIRE FENCE
ALG_PRO-543 11+58.02 TO 11+88.66 LT 33 BARBED WIRE FENCE
ALG_PRO-544 11+62.57 TO 12+39.72 RT 77
ALG_PRO-545 11+62.90 TO 12+40.13 LT 77
ALG_PRO-543 12+13.65 TO 13+93.54 LT 180 BARBED WIRE FENCE
ALG_PRO-543 12+19.54 TO 13+98.96 RT 189 BARBED WIRE FENCE
ALG_PRO-544 12+49.37 LT 1
TOTALS 1 1 526 155
MISCELLANEOUS
ALIGNMENT STATION TO STATION SIDE
603-10480 607-01000 607-60116
NOTES
48 INCH
CORRUGATED
STEEL PIPE
FENCE
BARBED WIRE
WITH METAL
POSTS
16 FOOT
GATE
LIN FT LIN FT EACH
ALG_PRO-543 10+59.40 TO 10+84.22 LT 27
ALG_PRO-543 10+69.84 TO 10+91.21 RT 24
ALG_PRO-544 10+91.21 TO 11+07.21 RT 1
ALG_PRO-545 10+98.42 TO 11+81.43 LT 85
ALG_PRO-545 11+07.21 TO 11+75.09 RT 70
ALG_PRO-543 12+19.18 TO 13+98.96 RT 189
ALG_PRO-543 12+29.81 TO 13+93.43 LT 169
ALG_PRO-543 12+77.72 TO 12+80.63 LT/RT 46
TOTALS 46 564 1
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
TABULATIONS
R y a n
S u n d b e r g
:0
:4
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
T
A B
.d g n
22615RDWY_TAB.dgn
Project No./Code the cover page(s)
1 of 1 7
1"=XX'
Ò ALG_PRO-543
Ò ALG_SEC-CHANNEL
1+00
S
'3
.7
E
.0
1+00.00
POB =
1+75.00
POE =
N00°02'20.65"E N00°09'25.21"E N00°28'28.45"W
170.02' 60.01' 189.97'
.0
P
O B
.0
P
O
P I
.0
P I
.0
20'0' 10' 40'
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
ALIGNMENT PLAN
R y a n S u n d b e r g
:1 :1
A
M K
P r o je c ts
\C o u n ty
\C O
\H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b \C
A D
\P la n s \2
R
D W
Y A
L .d g n
22615RDWY_AL_01.dgn
Project No./Code the cover page(s)
1 of 1 8
1"=40'
ALIGNMENT NAME: ALG_Sec-CHANNEL
ELEMENT POINT TYPE STATION NORTHING EASTING RADIUS LENGTH OF CURVE DELTA/THETA ROTATION DIRECTION
TANGENT PI 1+00.00 1406117.185 3098277.984
TANGENT PI 1+75.00 1406103.93 3098351.809
ALIGNMENT NAME: ALG_Pro-543
ELEMENT POINT TYPE STATION NORTHING EASTING RADIUS LENGTH OF CURVE DELTA/THETA ROTATION DIRECTION
TANGENT PI 10+00.00 1405910.451 3098313.618
TANGENT PI 11+70.02 1406080.472 3098313.734
TANGENT PI 12+30.03 1406140.477 3098313.898
TANGENT PI 14+20.00 1406330.444 309312.325
1+00
EXISTING ROW
EXISTING ROW
STA. 10+37.00
BEGIN CONSTRUCTION
STA. 14+00.08
END CONSTRUCTION
REMOVAL OF GUARDRAIL TYPE 3
TYPE 3
REMOVAL OF GUARDRAIL
REMOVAL OF PIPE (48" DIA.)
REMOVAL OF FENCE (BARBED WIRE)
REMOVAL OF FENCE (BARBED WIRE)
REMOVAL OF FENCE (BARBED WIRE)
REMOVAL OF FENCE (BARBED WIRE)
REMOVAL OF FENCE (BARBED WIRE)
REMOVE STRUCTURE
Ò ALG_PRO-543
REMOVAL OF SIGN
(0.03 ACRE)
TEMP EASEMENT
(0.03 ACRE)
TEMP EASEMENT
CR 543
LEGEND
AS UNCLASSIFIED EXCAVATION)
REMOVE AGGREGATE (PAID FOR
20'0' 10' 40'
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
REMOVAL PLAN
R y a n S u n d b e r g
:1 :5
A
M K
P r o je c ts
\C o u n ty
\C O
\H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b \C
A D
\P la n s \2
R
D W
Y R
E M
.d g n
22615RDWY_REM_01.dgn
Project No./Code the cover page(s) of 11 9
XXX
LEGEND
AGGREGATE BASE COURSE CLASS 6
(6" DEPTH)
FENCE BARBED WIRE WITH METAL POSTS
EXISTING ROW
EXISTING ROW
MATCH EXISTING
STA. 10+37.00
BEGIN CONSTRUCTION
MATCH EXISTING
STA. 14+00.08
END CONSTRUCTION
+82.9
TYPE 3K
END ANCHORAGE
+70.3
END ANCHORAGE TYPE 3K
+30.4
END ANCHORAGE TYPE 3K
+18.7
END ANCHORAGE TYPE 3K
Ò ALG_PRO-543
Ò ALG_SEC-CHANNEL
13' THRU
13' THRU
25' R
25' R
25' R
25' R
2:
2:1 2:
2:1
H U
E R
F A
N O
R I V
E R
(0.03 ACRE)
TEMP EASEMENT
(0.03 ACRE)
TEMP EASEMENT
13.5'
14'
10' THRU
10' THRUCR 543
10' THRU
10' THRU
TOE OF FILL
CR 543
MATCH EXISTING
29.85' LT
STA 10+98.30
MATCH EXISTING
29.92' LT
STA 10+84.22
11.26' LT
STA 11+15.80
10.87' LT
STA 10+69.68
13.99' RT
STA 11+29.72
MATCH EXISTING
30.19' RT
STA 11+05.95MATCH EXISTING
30.12' RT
STA 10+92.41
9.97' RT
STA 10+77.56SPECIFIC NOTES:
SEE STD M-606-1, SHEET 19 FOR
GUARDRAIL POST MOUNT TO TOP OF
CONCRETE BOX CULVERT.
EXACT BEGIN AND END STATION POINTS
OF GUARDRAIL SHALL BE BASED UPON
FIELD CONDITIONS. PARTIAL STATIONS
SHOWN ARE A REFERENCE BASED ON
DESIGN STANDARDS.
INSTALL 46' - 48" CULVERT
INVERT ELEV. 6922.14'
INVERT ELEV. 6922.27'
16' GATE
B-2B-1
1+00
S
'3
.7
E
.0
N00°02'20.65"E N00°09'25.21"E N00°28'28.45"W
170.02' 60.01' 189.97'
20'0' 10' 40'
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50
14+00
6910 6910
6920 6920
6930 6930
6940 6940
.5
P r
.5
P r
.8
P r
.8
P r
.7 r
-0.75%
0.00%
-0.31%
CRESTMDS =
-0.15e =
19.00K =
47.43'V.C. =
CRESTMDS =
-0.42e =
19.00K =
80.10'V.C. =
SAGMDS =
0.36e =
27.00K =
87.65'V.C. =
SAGMDS =
0.52e =
27.00K =
105.53'V.C. =
.8
E L
.2
V
P I
.8
E
L
.2
V
P
.1
E L
.7
V
P
.9
E
L
.0
V
P
.2
E L
.5
V
P
.8
E L
.2
V
P
.4
E
L
.9
V
P
.1
E L
.3
V
P
.8
E L
.9
V
P T
.1
E L
.3
V
P
.2
E L
.5
V
P
.7
E
L
.8
V
P
.4
E
L
.1
L o w
P o in t
.8
E L
.9
H ig h P o in t
.8
E L
.2
H ig h P o in t
.8 x
.9
E x
.3
E x
.5
E x
.7 x
INVERT ELEV. 6915.50 INVERT ELEV. 6922.21
1 1 of 10
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
PLAN & PROFILE
R y a n
S u n d b e r g
:1
:3
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
C
P
.d g n
22615RDWY_CP_01.dgn
Project No./Code the cover page(s) drawings are applied to
1+00
(0.03 ACRE)
TEMP EASEMENT
(0.03 ACRE)
TEMP EASEMENT
STA. 10+37.00
BEGIN CONSTRUCTION
EXISTING ROW
EXISTING ROW
Ò ALG_PRO-543
Ò ALG_SEC-CHANNEL
(0.03 ACRE)
TEMP EASEMENT
(0.03 ACRE)
TEMP EASEMENT
STA. 14+00.08
END CONSTRUCTION
INP CR 543
INP CR 543
20'0' 10' 40'
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
GRADING PLANS
R y a n
S u n d b e r g
:1
:5
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
G r a d in g
P la n
.d g n
22615RDWY_Grading Plan_01.dgn
Project No./Code the cover page(s)
1 1 of 11
SCHEDULE OF CONSTURCTION TRAFFIC CONTROL SIGNS
SIGN CODE LEGEND
DIMENSION
(INCHES)
PANEL SIZE
A B C SPECIAL
EA EA EA SF
30M4-9l DETOUR (ARROW LEFT) 30 x 24 4
30M4-9r DETOUR (ARROW RIGHT) 30 x 24 2
48W20-2 DETOUR 1000 FT 48 x 48 2
48W20-3 STREET CLOSED AHEAD 48 x 48 2
TOTALS 0 10 0 0
TABULATION OF CONSTRUCTION TRAFFIC CONTROL DEVICES
ITEM
NUMBER
TRAFFIC ITEMS QUANTITY UNIT
630-80335 BARRICADE (TYPE 3M-A) TEMPORARY 2 EACH
630-80342 CONSTRUCTION TRAFFIC SIGN PANEL (SIZE B) 10 EACH
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
TRAFFIC CONTROL
TABULATION OF CONSTRUCTION
R y a n S u n d b e r g
:1 :3
A
M K
P r o je c ts
\C o u n ty
\C O
\H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b \C
A D
\P la n s \2
R
D W
Y T
C T
A B
.d g n
22615RDWY_TC_TAB.dgn
Project No./Code the cover page(s)
1 of 1 12
LEGEND
DETOUR ROUTE
PROJECT LOCATION
HWY 6
C R
CR
XXW20-3 ahead
BARRICADE (TYPE 3 M-B)
XXW20-3 ahead
BARRICADE (TYPE 3 M-B)
X X
W f t
DETOUR
M 4-
9l
DETOUR
30M4-9l
30W20-2 1000ft
D E T O
U R
M l
M4-
9r
M r
DETOUR
30M4-9l
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: N/A
File Name:
Unit Information
DETOUR PLAN
R y a n
S u n d b e r g
:1
:5
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
D
E T
.d g n
22615RDWY_DET_01.dgn
Project No./Code the cover page(s)
HU54-S69A3-S0.1
1 of 1 13
AS NOTED
250'0' 125' 500'
6915.90
INVERT ELEV.
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer: JMG
Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 12/9/2022Print Date:
Horiz. Scale: 1:1 Vert. Scale: As Noted
Unit Leader Initials
File Name:
Unit Information lr u iz
:4
:5
M
W
P r o j e c t s
S
H u e r f a n o iv e r
B r id g e p la c e m e n t
G a r d n e r
C o lo r a d o
D r a w in g s
H u e r f a iv e r
B r id g p la c e m e n t
E G
S
U S
E .d g n
221-545 Huerfano River Bridge Replacement_EGS ToUSE.dgn
Project No./Code
NumberLNR (YEH, EGS)
EGS
ENGINEERING GEOLOGY SHEET
69356935
69406940
50/6"
50/5.5"
50/6"
50/5.5"
50/5.5"
50/4"
50/5"
50/6"
LL= 32
PI= 6
LL= 30
PI= 6
B-2
91/10"
50/5"
50/4.5"
50/5"
50/3.5"
90/9"
LL= 33
PI= 9
B-1
Fill Clayey Sand
(SC)
Well-Graded
Gravel with Sand
(GW)
Claystone Sandstone Well-Graded
Sand (SW)
Soil Lithology
LEGEND
Sample Type
Graphic
Groundwater
Levels
RQD
x x x
Boring No.
TYPICAL BOREHOLE LOG
Penetration Resistance
(Blows per foot -OR-inches of penetration)*
For additional information, refer to
Geotechnical Report, prepared by Yeh and Associates, Inc.
Project Number: 221-545
Material Description
Graphics
(see Legend)
Huerfano River Bridge
Replacement
Lab test results list
*e.g. A value of 50/3" or 50:3" indicates that 50 blows were applied to the sampler, with a penetration of 3 inches.
Yeh and Associates, Inc.
Construction Services● Geological● Geotechnical
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00
1. For boring locations see sheet no. 10.
NOTES:
No Revisions:
Revised:
Void: Sheet Subset: SWMP
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
SWMP CONSTRUCTION PLAN
R y a n
S u n d b e r g
:1
:1
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
S
W M
P
.d g n
22615RDWY_SWMP_01.dgn
Project No./Code the cover page(s) drawings are applied to
All seals for this set of
HU543-S0.1-S69A
BRO P2C1-004
22615
1.SITE DESCRIPTION
The Contractor shall comply with all CDOT contractual requirements. The SWMP Administrator for Construction shall update to reflect current project site conditions.
A.PROJECT SITE LOCATION:
Location or address of construction office:
County Road 543 over Huerfano River near Gardner in Huerfano County, Colorado
B. PROJECT SITE DESCRIPTION:
Replacement of a structure conveying the Huerfano River with a concrete box culvert and 400 linear ft of associated roadway approach widening. No utilities will be affected.
C.PROPOSED SEQUENCING FOR MAJOR CONSTRUCTION ACTIVITIES:
Clearing and grubbing, excavation and removal of existing bridge structure, in-place casting of concrete box culvert while diverting streamflow to accommodate casting, placement of roadway embankment and seeding.
D.ACRES OF DISTURBANCE:
1. Total area of construction site (LOC): 0.418 acres
2. Total area of proposed disturbance (LDA): 0.418 acres
3. Total area of seeding: 0.179 acres
E. EXISTING SOIL DATA:
Data Source(s): USDA Web Soil Survey.
Soil is Riverwash-Las Animas complex consisting of sand and stratified coarse sand to sandy loam.
These soils are known to have a high capacity to transmit water and are considered hydric soils. They are considered highly erodible due to their unconsolidated nature.
F. EXISTING VEGETATION, INCLUDING PERCENT OF VEGETATIVE COVER:
During design, the SWMP Administrator for Design in consultation with the Engineer will determine if the SWMP Administrator for Design or the
SWMP Administrator for Construction will conduct the Vegetation Transects. If the site is disturbed, an Adequate Reference Site(s) may be utilized, refer to the permit.
For this Project, it is anticipated that the SWMP Administrator for Construction will conduct the Vegetation Transects. Inventorying plant species, their location, and vegetative density immediately before construction will allow for the most accurate transects and will provide a good quality baseline for post-construction revegetation efforts.
Pre-Construction Date of survey: Percent Existing Vegetative Cover:
Description of existing vegetation:
Method for determining percent vegetative cover:
Include a map or table showing transect locations, photos documenting pre-Construction vegetative cover, and methodology used to determine existing vegetative cover to SWMP tab 17:
Post-Construction Date of survey: ______________ Percent Vegetative Cover: ______________
Description of vegetation:
The method used to determine pre-construction percent cover shall be used to determine post construction percent cover.
Include map or table showing transect locations, photos documenting post-Construction vegetative cover, and methodology used to determine existing vegetative cover to SWMP tab 17:
https://www.codot.gov/programs/environmental/landscape-architecture
2.STORMWATER MANAGEMENT CONTROLS FOR FIRST CONSTRUCTION ACTIVITIES
THE CONTRACTOR SHALL PERFORM THE FOLLOWING:
A.POTENTIAL POLLUTANT SOURCES
Refer to Potential Pollutant Sources in SWMP Section 4A. Evaluate, identify and describe all potential sources of pollutants at the site in accordance with subsection 107.25 and place any Control Measures required to contain potential pollutants.
B. OFFSITE DRAINAGE (RUN ON WATER):
Place Control Measures to address run-on water in accordance with subsection 208.03.
C.CONSTRUCTION DEWATERING:
Obtain a CDPS Dewatering Permit from CDPHE if conditions of their Low Risk Guidance for Discharges of Uncontaminated Groundwater to
Land are not met; see subsections 107.02 and 107.25.
Refer to CDPHE Low Risk Discharge Guidance Document of Uncontaminated Groundwater to Land.
https://www.colorado.gov/pacific/sites/default/files/WQ%20LOW%20RISK%20GW.pdf
D.VEHICLE TRACKING CONTROL:
Control Measures shall be implemented in accordance with subsection 208.04.
E. PERIMETER CONTROL:
Silt fence and erosion logs.
3.QUALIFIED STORMWATER MANAGERS:
A.SWMP ADMINISTRATOR FOR DESIGN:
CDOT Certified Individual responsible for developing SWMP Plan Sheets and SWMP Site Maps during the design phase.
Name/Title Contact Information [phone & email] Certification #
William Harmon Environmental Specialist 970-450-7472, will.harmon@kljeng.com 4CC380E5
B. SWMP ADMINISTRATOR FOR CONSTRUCTION:
(As defined in Section 208) The Contractor shall designate a SWMP Administrator for Construction. The SWMP Administrator for Construction shall become the operator for the SWMP and assume responsibility for all design changes to the SWMP implementation and maintenance in accordance to 208.03, the SWMP shall remain the property of CDOT. The SWMP Administrator for Construction shall be responsible for implementing, maintaining, and revising SWMP, including the title and contact information. The activities and responsibilities of the SWMP
Administrator for Construction shall address all aspects of the project's SWMP. (Update the information below for each new SWMP
Administrator for Construction) (Copy of TECS Certification must also be included in the SWMP.)
Name/Title Contact Information (phone & email) TECS Certification # Start Date Engineer Approval
C.PERMANENT STABILIZATION SUBJECT MATTER EXPERT:
This qualified individual will be either a Regional Environmental Staff member, or an Independent Contractor Controller (Independent
Assurance Program). This expert is a project team leader responsible for ensuring project adherence to requirements of the 207 and 212
Project Special Provisions as follows, and will be available for questions regarding permanent stabilization requirements.
https://www.codot.gov/programs/environmental/landscape-architecture/assets/inspection-and-verification-checklist-for-roadside-reveget ation_-111621_v3.pdf]
1. Review the Topsoil Management Plan and the Permanent Stabilization Site Maps.
2. Attend the Environmental Pre-construction Conference.
3. Coordinate the Site Pre-vegetation Conference.
4. Review and recommend approval of products.
5. Review and recommend approval of the Quantities Verification Prerequisite.
6. Attend the Partial Landscape Completion Walkthrough.
7. Attend the Final Landscape Completion Walkthrough.
Name/Title Contact Information [phone & email]
4.DURING CONSTRUCTION
The SWMP should be considered a "living document" that is continuously reviewed and modified. During construction, the following items shall be added, updated, or amended as needed by the Contractor in accordance with Section 208
A.MATERIALS HANDLING AND SPILL PREVENTION:
prior to construction commencing the Contractor shall submit a Spill Prevention, Control and Countermeasure Plan, see subsection 208.06.
Materials handling shall be in accordance with subsection 208.06.
B. OTHER CDPS PERMITS:
List applicable CDPS permits associated with the permitted site and activities.
C.STOCKPILE MANAGEMENT:
shall be done in accordance with subsections 107.25 and 208.07
D.CONCRETE WASHOUT:
Concrete wash out water or waste from field laboratories and paving equipment shall be contained in accordance with subsection 208.05.
E. SAW CUTTING:
shall be done in accordance with subsections 107.25, 208.04, 208.05
F. STREET SWEEPING:
shall be done in accordance with subsection 208.04
22615
BRO P2C1-004
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset: SWMP
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
SWMP CONSTRUCTION PLAN
R y a n
S u n d b e r g
:1
:1
A
M K
P r o je c ts
\C o u n ty \C
O \H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b
\C A
D \P la n s \2
R D
W Y
S
W M
P
.d g n
22615RDWY_SWMP_01.dgn
Project No./Code the cover page(s) drawings are applied to
All seals for this set of
5.CONTROL MEASURE MAINTENANCE
Maintenance shall be in accordance with subsection 208.04 (f).
6.INTERIM AND PERMANENT STABILIZATION
The Contractor shall comply with all interim stabilization and permanent stabilization requirements in accordance with subsection 208.04(e).
A.SEEDING PLAN
The following seed mix(es) and rates are for drill seeding method as shown on the Permanent Stabilization Site Maps shall be used:
COMMON NAME BOTANICAL NAME LBS. PLS PER ACRE
Western Wheatgrass Pascopyrum Smithii v. Arriba 6
Big Bluestem Andropogon Geraridii 5
Blue Grama Boutelous Gracillis v.Hachita 2
Sideoats Grama Boutelous Curtipendula 3
Little Bluestem Schizachyrium Scoparium 3
Prairie Flax (Blue Flax) Linum Lewsii 2
Narrowleaf Indian Paintbrush Castilleja Linariifolia 2
White Yarrow Achillia Millefolia v. Occidentalis 0.5
Douglas (Low) Rabbitbrush Chrysothamnus Viscidiflorus 0.5
Cover/Nurse Crop Oats Avena Sativa (Spring) 3
Cover/Nurse Crop Regreen Trticum Aestivum (Spring or Fall) 2
TOTAL 30
B. SEEDING APPLICATION:
The following seeding methods shall be used for all areas which are not surfaced and as shown on the Permanent Stabilization Site Maps. Soil c ompaction shall be minimized for areas where permanent stabilization will be achieved through vegetative cover.
Pay Item Seeding Method (subsection 212.05) Acre
212-00706 Seeding (Native) Drill 0
212-00707 Seeding (Native) Hydraulic 0.179
212-00708 Seeding (Native) Broadcast 0
212-00709 Seeding (Wetland) Drill 0
212-00710 Seeding (Wetland) Hydraulic 0
212-00711 Seeding (Wetland) Broadcast 0
Total0.179
The Contractor shall provide the location of where seed is stored and access to stored seed locations to the Engineer. Seed stored by the
Contractor for longer than 30 days will be rejected.
C.MULCHING APPLICATION:
Apply a minimum of 2 tons/ac of certified weed free hay or 2 1/2 tons/ac of certified weed free straw per acre and in accordance with Section 213, and mechanically crimp it into the soil in combination with an organic mulch tackifier.
Prior to winter shutdown or the summer seeding window closure: Uncompleted slopes shall be mulched with 2 tons of mulching (weed free) per acre, mechanically crimped into the topsoil in combination with an organic mulch tackifier in accordance with Sections 208 and 213.
D.SPECIAL REQUIREMENTS:
Soil amendments, seedbed preparation, and permanent stabilization mulching shall be accomplished within four working days of placing the topsoil on the de-compacted civil subgrades. If placed topsoil is not mulched with permanent stabilization mulch within four working days, the
Contractor shall complete interim stabilization methods in accordance with subsection 208.04(e) at no additional cost to the Department.
Permanent stabilization mulching shall be accomplished within 24 hours of hydraulic application of native seed.
The Contractor shall submit a proposed Permanent Stabilization Phasing Plan to the Engineer for approval showing how the SWMP Permanent
Stabilization Plans will be implemented to minimize damage to seeded areas.
E. SOIL AMENDMENT REQUIREMENTS:
Minimum amendment material requirements for all disturbances to receive seeding (native).
0.179 Total Acres of Seeding (Native) Hydraulic with Topsoil Generated From Topsoil (Onsite), Pay Item Description Amount/Acre Units Total For This Method
212-00702 Biotic Soil Amendments (Hydraulically
Applied) 3500 Pounds 627
212-00704 Mycorrhizae 60 Pounds 11
S e e d in g
N a ti v e
H y d ra u li c
P a y I te m
-0
F. SOIL RETENTION COVERING:
On slopes and ditches requiring a blanket or turf reinforcement mat (trm), the blanket/trm shall be placed in lieu of mulch and mulch tackifier and placed after seeding (native). See SWMP Site Map for blanket/trm locations.
G.PERMANENT STABILIZATION APPLICATION UNDER STRUCTURES:
Under structures shade patterns should be considered and the use of Median Cover Material (Stone) or other stabilized options with an approved
Project Special Provision should be used. See SWMP Site Map for locations.
Only remaining permanent structure is concrete box culvert, therefor shade patterns and use of median cover material is unnecessary.
H.RESEEDING OPERATIONS/CORRECTIVE STABILIZATION:
Prior to partial acceptance.
All seeded areas shall be reviewed by the SWMP Administrator for Construction and or Engineer for bare soils caused by surface or wind erosion.
Bare areas caused by surface or gully erosion, blown away mulch, etc. shall be re-graded, seeded, and have the designated mulching applied as necessary, at no additional cost to the project.
The Contractor shall maintain seeding/mulch/tackifier/blanket/TRM, mow to control weeds or apply herbicide to control weeds in the seeded areas until Partial Acceptance of the stormwater construction work.
7.PRIOR TO PROJECT FINAL ACCEPTANCE
1. When directed by the Engineer, removal and disposal of temporary control measures shall be included in the cost of work.
2. At the end of the project, all ditch checks shall consist of either temporary erosion logs (or equivalent) or permanent riprap.
3. All storm drains shall be cleaned prior to the Final Acceptance of the project. If required, include work in 202-04002 Clean Culvert.
4. Refer to Specification 208.10 for Items to be completed prior to requesting partial acceptance of water quality work
No Revisions:
Revised:
Void: Sheet Subset: SWMP
Detailer: MDG
Designer: RRS
Sheet Number Subset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed 8/15/2024Print Date:
Horiz. Scale: Vert. Scale: As Noted
File Name:
Unit Information
SWMP CONSTRUCTION PLAN
R y a n S u n d b e r g
:1 :1
A
M K
P r o je c ts
\C o u n ty
\C O
\H u e r f a n o \2
H u e r f a n o R iv e r B r id g e R e h a b \C
A D
\P la n s \2
R
D W
Y S
W M
P .d g n
22615RDWY_SWMP_01.dgn
Project No./Code the cover page(s) drawings are applied to
All seals for this set of
HU543-S0.1-S69A
22615
BRO P2C1-004
8.NARRATIVES:
Control Measure Matrixes During Construction:
1. Control measure narratives have been included for the CDOT Standard Specifications and Standard Plan M-208 and M-216 along with any non-standard control measures approved during the design process. If a Non-Standard Control Measure not included in the SWMP is proposed and approved by the
Engineer the SWM P Administrator for Construction shall do the following: Place an "X" in the column for non-standard and complete a Non-Standard Control Measure Specification and Narrative covering the what, when, where and why the control measure is being used shall be add to the SWMP. The appropriate "X" shall also be added to the implementation phase(s).
2. The SWMP Administrator for Construction shall place an "X" in the column In Use On Site when the control measure has been installed.
3. A "B" in the Initial Activities Column indicates that the control measure shall be installed before construction activity starts. Locations and quantities will be discussed during the Environmental Pre-Construction Conference with the Regional Water Pollution Control Manager.
STRUCTURAL Control Measures that may be potentially used on the project for erosion and sediment control; practices may include, but are not limited to:
CONTROL MEASURE IMPLEMENTATION PHASE
INITIAL ACTIVITIES INTERIM
ACTIVITIES
PERMANENT
STABILIZATION
IN USE
ON
SITE
M- 208
STANDARD
or "X" for
NON-STAN
DARD
NARRATIVE
APPLICATION,
CONTROL MEASURE
PROTECTION OF EXISTING WETLANDS
Fence (plastic) and erosion logs
Fence (plastic) shall be placed in combination with erosion logs to prevent encroachment of construction traffic and sediment into state waters prior to start of construction disturbances.
Fence (plastic) shall be placed adjacent to the wetlands; erosion logs shall be placed between the plastic fence and disturbance area. Logs shall be placed to direct flows away from or filter water running into wetlands from disturbance areas.
PROTECTION OF EXISTING TREES/LANDSCAPING
Fence (plastic)
Fence (plastic) shall be used in areas indicated in the plans to prevent encroachment of construction traffic and sediment for the protection of mature trees and/or existing landscaping prior to start of construction disturbances.
CHECK DAM/DITCH CHECK
Erosion log, silt berm, silt dike, rock check dam
Placed in ditches immediately upon completion of ditch grading to reduce velocity of runoff in ditch. For existing ditches, place prior to start of construction disturbances.
M-208
Storm Drain Inlet Protection In Paved Roadways (Type 1, 2 and 3 as shown on M-208-1, sheet 5 of 11)
Manufactured storm drain inlet protection placed prior to construction disturbances as detailed in
M-208-1, to protect existing inlets or immediately upon completion of new inlets to prevent sediment from entering the inlet throughout construction.
M-208
Storm Drain Inlet Protection In Native Seed Areas (M-604
Standard Inlets Type C and D)
Erosion logs or aggregate bags placed around inlet grate to prevent sediment from entering inlet.
Place prior to construction disturbances to protect existing inlets or immediately upon completion of new inlets.
M-208
CULVERT INLET/OUTLET PROTECTION
Erosion logs, aggregate bags
Placed at mouth of culvert inlets and over top of culvert at inlet and outlet where disturbance may be occurring adjacent to pipe to prevent sediment laden water from entering pipe or drainage. Place prior to start of construction disturbances.
M-208
TYPE C, TYPE D AND TYPE 13 PROTECTION
Erosion logs, aggregate bags, erosion bales
Placed around inlet grate or slope and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .