AD2 - DTMB-0414 (Construction Addendum).pdf
PDF 3 MB Posted
- Solicitation number
- RFQ-171-250000000658-3
- Issued by
- Saginaw County, Michigan
About this file
This Construction Bid Addendum No. 2 is issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Jerome T. Hart State Office Building Exterior Entrance Replacement project located in Saginaw, Michigan. The addendum, dated 10/15/2025, modifies the original bidding documents with several architectural updates, including changes to specification 084113, storefront transom glazing, sheet modifications, and door specifications. The project involves replacing the exterior entrance, with a bid opening date of 10/22/2025 and a file number of 171/25046.CTS. The professional architect for the project is WTA Architects, with Chris Schanbeck as the Project Director.
The addendum provides specific details about the modifications, such as changing transom glazing to FRP panels, adding keynotes and core drill notes, updating damp proofing specifications, and clarifying door configurations. For the main entrance (Door A1.1), the specification indicates two 3'-0" x 7'-0" doors with a keyed removable mullion, with the frame elevation of 6'-2" including the mullion. The document emphasizes that bidders must acknowledge the addendum in their bid summary, and failure to do so may result in bid rejection. The addendum becomes part of the contract documents, with the storefront system specified as the Tubelite T14000 series for exterior use, featuring thermally broken framing, mechanically retained glazing, and a color anodic finish.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
10/15/2025
PROJECT NAME
Jerome T. Hart State Office Building – Exterior Entrance Replacement
FILE NUMBER
171/25046.CTS
PROFESSIONAL
WTA Architects
PROJECT DIRECTOR
Chris Schanbeck
BID OPENING DATE:
10/22/2025
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
ARCHITECTURAL
Item A1: Reference specification 084113 (Re-Issued)
A. Transom glazing for all storefronts to be FRP Panels to match existing.
Item A2: Reference Sheet A1.00 (Re-Issued)
A. Added Keynote 23.
Item A3: Reference Sheet A2.01 (Re-Issued)
A. Added core drill note.
Item A4: Reference Sheet A2.32 & A2.33 (Re-Issued)
A. Added damp proofing notes.
Item A5: Reference Sheet A3.21
A. Clarification: Door A1.1 is to be (2) 3’-0” x 7’-0” doors with a keyed removable mullion.
Dimension for the frame elevation calling out 6’-2” includes the said removable mullion.
B. Added notes for spandrel panels.
Item L1: Reference Sheet A1.00 (Re-Issued)
A. Fixed furniture text note leader.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: WTA Architects, Jason Goff DATE: 10/15/2025
APPROVED BY:
PROJECT DIRECTOR: DTMB, Chris Schanbeck DATE: Click to enter date
EXTERIOR ENTRANCE REPLACEMENT FOR:
JEROME T. HART STATE OFFICE BUILDING FILE NO. 171/25046.CTS
SAGINAW, MICHIGAN PROJECT NO. 2025009
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 1
FFSECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Storefront framing.
2. Manual-swing entrance doors.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For aluminum-framed entrances and storefronts. Include plans, elevations, sections, full-size details, and attachments to other work.
1. Show connection to and continuity with adjacent thermal, weather, air, and vapor barriers.
2. Include point-to-point wiring diagrams.
C. Samples: For each type of exposed finish required.
D. Entrance Door Hardware Schedule: Prepared by or under supervision of supplier, detailing fabrication, and assembly of entrance door hardware, as well as procedures and diagrams.
1.3 INFORMATIONAL SUBMITTALS
A. Energy Performance Certificates: NFRC-certified energy performance values from manufacturer.
B. Field quality-control reports.
C. Sample warranties.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.
B. Testing Agency Qualifications: Qualified according to ASTM E 699 for testing indicated.
C. Product Options: Information on Drawings and in Specifications establishes requirements for aesthetic effects and performance characteristics of assemblies. Aesthetic effects are indicated by dimensions, arrangements, alignment, and profiles of components and assemblies as they relate to sightlines, to one another, and to adjoining construction.
1. Do not change intended aesthetic effects, as judged solely by Architect, except with
Architect's approval. If changes are proposed, submit comprehensive explanatory data to Architect for review.
1.6 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of aluminum-framed entrances and storefronts that do not comply with requirements or that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Five years from date of Substantial Completion.
SAGINAW, MICHIGAN PROJECT NO. 2025009
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 2
B. Special Finish Warranty: Standard form in which manufacturer agrees to repair finishes or replace aluminum that shows evidence of deterioration of factory-applied finishes within specified warranty period.
1. Warranty Period: 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Delegated Design: Engage a qualified professional engineer to design aluminum-framed entrances and storefronts.
B. General Performance: Comply with performance requirements specified, as determined by testing of aluminum-framed entrances and storefronts representing those indicated for this Project without failure due to defective manufacture, fabrication, installation, or other defects in construction.
1. Aluminum-framed entrances and storefronts shall withstand movements of supporting structure, including, but not limited to, twist, column shortening, long-term creep, and deflection from uniformly distributed and concentrated live loads.
2. Failure also includes the following:
a. Thermal stresses transferring to building structure.
b. Glass breakage.
c. Noise or vibration created by wind and thermal and structural movements.
d. Loosening or weakening of fasteners, attachments, and other components.
e. Failure of operating units.
C. Structural Loads:
1. Wind Loads: per Michigan Building Code.
2. Other Design Loads: per Michigan Building Code.
D. Deflection of Framing Members: At design wind pressure, as follows:
1. Deflection Normal to Wall Plane: Limited to 1/175 of clear span for spans of up to 13 feet 6 inches (4.1 m) and to 1/240 of clear span plus 1/4 inch (6.35 mm) for spans greater than 13 feet 6 inches (4.1 m) or an amount that restricts edge deflection of individual glazing lites to 3/4 inch (19.1 mm), whichever is less.
2. Deflection Parallel to Glazing Plane: Limited to 1/360 of clear span or 1/8 inch (3.2 mm), whichever is smaller.
a. Operable Units: Provide a minimum 1/16-inch (1.6-mm) clearance between framing members and operable units.
3. Cantilever Deflection: Where framing members overhang an anchor point, as follows:
a. Perpendicular to Plane of Wall: No greater than 1/240 of clear span plus 1/4 inch (6.35 mm) for spans greater than 11 feet 8-1/4 inches (3.6 m) or 1/175 times span, for spans of less than 11 feet 8-1/4 inches (3.6 m).
E. Structural: Test according to ASTM E 330/E 330M as follows:
1. When tested at positive and negative wind-load design pressures, storefront assemblies, including entrance doors, do not evidence deflection exceeding specified limits.
2. When tested at 150 percent of positive and negative wind-load design pressures, storefront assemblies, including entrance doors and anchorage, do not evidence material failures, structural distress, or permanent deformation of main framing members exceeding 0.2 percent of span.
3. Test Durations: As required by design wind velocity, but not less than 10 seconds.
F. Air Infiltration: Test according to ASTM E 283 for infiltration as follows:
1. Fixed Framing and Glass Area:
SAGINAW, MICHIGAN PROJECT NO. 2025009
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 3
a. Maximum air leakage of 0.06 cfm/sq. ft. (0.30 L/s per sq. m) at a static-air-pressure differential of 6.24 lbf/sq. ft. (300 Pa).
2. Entrance Doors:
a. Single Doors: Maximum air leakage of 0.5 cfm/sq. ft. (2.54 L/s per sq. m) at a static-air-pressure differential of 1.57 lbf/sq. ft. (75 Pa).
G. Water Penetration under Static Pressure: Test according to ASTM E 331 as follows:
1. No evidence of water penetration through fixed glazing and framing areas, including entrance doors, when tested according to a minimum static-air-pressure differential of 20 percent of positive wind-load design pressure, but not less than 6.24 lbf/sq. ft.
(300 Pa).
H. Energy Performance: Certify and label energy performance according to NFRC as follows:
1. Thermal Transmittance (U-factor): Fixed glazing and framing areas as a system shall have U-factor of not more than 0.45 Btu/sq. ft. x h x deg F (2.55 W/sq. m x K) as determined according to NFRC 100.
2. Condensation Resistance: Fixed glazing and framing areas as a system shall have an NFRC-certified condensation resistance rating of no less than 45 as determined according to NFRC 500.
I. Thermal Movements: Allow for thermal movements resulting from ambient and surface temperature changes.
1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
2.2 STOREFRONT SYSTEMS
A. Basis-of-Design Product for Aluminum-Framed Entrances and Storefronts: Subject to compliance with requirements, provide Tubelite T14000 series for exterior. Substitutions:
See Section 012500 - Product Requirements.
B. Framing Members: Manufacturer's extruded- or formed-aluminum framing members of thickness required and reinforced as required to support imposed loads.
1. Exterior Framing Construction: Thermally broken.
2. Glazing System: Retained mechanically with gaskets on four sides.
3. Finish: Color anodic finish.
4. Fabrication Method: Field-fabricated stick system.
5. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated.
6. Steel Reinforcement: As required by manufacturer.
C. Backer Plates: Manufacturer's standard, continuous backer plates for framing members, if not integral, where framing abuts adjacent construction.
D. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum with non-staining, nonferrous shims for aligning system components.
E. Insulated Spandrel Panels:
1. FRP-faced flat panels with no deviations in plane exceeding 0.8 percent of panel dimension in width or length.
a. Overall Panel Thickness: 1 inch (25.4 mm).
b. Exterior Skin: FRP.
1) Thickness: Manufacturer's standard for finish and texture indicated.
2) Finish: Color to be determined to match frame color.
c. Interior Skin: FRP.
1) Thickness: Manufacturer's standard for finish and texture indicated.
2) Finish: Color to be determined to match frame color.
d. Thermal Insulation Core: Manufacturer's standard.
SAGINAW, MICHIGAN PROJECT NO. 2025009
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 4
e. Surface-Burning Characteristics: Comply with ASTM E84; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1) Flame-Spread Index: 25 or less.
2) Smoke-Developed Index: 50 or less.
2.3 ENTRANCE DOOR SYSTEMS
A. Entrance Doors: Manufacturer's standard glazed entrance doors for manual-swing or automatic operation.
1. Door Construction: 1-3/4-inch (44.5-mm) overall thickness, with minimum 0.125-inch-
(3.2-mm-) thick, extruded-aluminum tubular rail and stile members. Mechanically fasten corners with reinforcing brackets that are deeply penetrated and fillet welded or that incorporate concealed tie rods.
a. Thermal Construction: High-performance plastic connectors separate aluminum members exposed to the exterior from members exposed to the interior.
2. Door Design: Wide stile; 5-inch (127-mm) nominal width.
3. Glazing Stops and Gaskets: Square, snap-on, extruded-aluminum stops and preformed gaskets.
a. Provide nonremovable glazing stops on outside of door.
2.4 ENTRANCE DOOR HARDWARE
A. Entrance Door Hardware: Hardware not specified in this Section is specified in Section 087100 "Door Hardware."
2.5 GLAZING
A. Glazing: Comply with Section 088000 "Glazing."
B. Glazing Gaskets: Manufacturer's standard sealed-corner pressure-glazing system of black, resilient elastomeric glazing gaskets, setting blocks, and shims or spacers.
C. Glazing Sealants: As recommended by manufacturer.
2.6 MATERIALS
A. Sheet and Plate: ASTM B 209 (ASTM B 209M).
B. Extruded Bars, Rods, Profiles, and Tubes: ASTM B 221 (ASTM B 221M).
C. Extruded Structural Pipe and Tubes: ASTM B 429/B 429M.
D. Structural Profiles: ASTM B 308/B 308M.
E. Steel Reinforcement:
1. Structural Shapes, Plates, and Bars: ASTM A 36/A 36M.
2. Cold-Rolled Sheet and Strip: ASTM A 1008/A 1008M.
3. Hot-Rolled Sheet and Strip: ASTM A 1011/A 1011M.
4. Primer: Manufacturer's standard zinc-rich, corrosion-resistant primer complying with
SSPC-PS Guide No. 12.00; applied immediately after surface preparation and pretreatment. Select surface preparation methods according to recommendations in SSPC-SP COM, and prepare surfaces according to applicable SSPC standard.
2.7 FABRICATION
A. Form or extrude aluminum shapes before finishing.
SAGINAW, MICHIGAN PROJECT NO. 2025009
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 5
B. Weld in concealed locations to the greatest extent possible to minimize distortion or discoloration of finish. Remove weld spatter and welding oxides from exposed surfaces by descaling or grinding.
C. Fabricate components that, when assembled, have the following characteristics:
1. Profiles that are sharp, straight, and free of defects or deformations.
2. Accurately fitted joints with ends coped or mitered.
3. Physical and thermal isolation of glazing from framing members.
4. Accommodations for thermal and mechanical movements of glazing and framing to maintain required glazing edge clearances.
5. Provisions for field replacement of glazing from interior.
6. Fasteners, anchors, and connection devices that are concealed from view to greatest extent possible.
D. Mechanically Glazed Framing Members: Fabricate for flush glazing without projecting stops.
E. Entrance Door Frames: Reinforce as required to support loads imposed by door operation and for installing entrance door hardware.
F. Entrance Doors: Reinforce doors as required for installing entrance door hardware.
G. Entrance Door Hardware Installation: Factory install entrance door hardware to the greatest extent possible. Cut, drill, and tap for factory-installed entrance door hardware before applying finishes.
H. After fabrication, clearly mark components to identify their locations in Project according to Shop Drawings.
2.8 ALUMINUM FINISHES
A. Color Anodic Finish: AAMA 611, AA-M12C22A42/A44, Class I, 0.018 mm or thicker.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General:
1. Comply with manufacturer's written instructions.
2. Do not install damaged components.
3. Fit joints to produce hairline joints free of burrs and distortion.
4. Rigidly secure nonmovement joints.
5. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration and to prevent impeding movement of moving joints.
6. Seal perimeter and other joints watertight unless otherwise indicated.
B. Metal Protection:
1. Where aluminum is in contact with dissimilar metals, protect against galvanic action by painting contact surfaces with materials recommended by manufacturer for this purpose or by installing nonconductive spacers.
2. Where aluminum is in contact with concrete or masonry, protect against corrosion by painting contact surfaces with bituminous paint.
C. Set continuous sill members and flashing in full sealant bed, as specified in Section 079200 "Joint Sealants," to produce weathertight installation.
D. Install components plumb and true in alignment with established lines and grades.
E. Install operable units’ level and plumb, securely anchored, and without distortion. Adjust weather-stripping contact and hardware movement to produce proper operation.
F. Install glazing as specified in Section 088000 "Glazing."
G. Entrance Doors: Install doors to produce smooth operation and tight fit at contact points.
SAGINAW, MICHIGAN PROJECT NO. 2025009
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113 - 6
1. Exterior Doors: Install to produce weathertight enclosure and tight fit at weather stripping.
2. Field-Installed Entrance Door Hardware: Install surface-mounted entrance door hardware according to entrance door hardware manufacturers' written instructions using concealed fasteners to greatest extent possible.
3.2 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
B. Field Quality-Control Testing: Perform the following test on representative areas of aluminum-framed entrances and storefronts.
1. Water-Spray Test: Areas designated by Architect shall be tested according to
AAMA 501.2 and shall not evidence water penetration.
2. Air Infiltration: ASTM E 783 at 1.5 times the rate specified for laboratory testing in
"Performance Requirements" Article but not more than 0.09 cfm/sq. ft. (0.45 L/s per
sq. m) at a static-air-pressure differential of 1.57 lbf/sq. ft. (75 Pa).
3. Water Penetration: ASTM E 1105 at a minimum uniform and cyclic static-air-pressure differential of 0.67 times the static-air-pressure differential specified for laboratory testing in "Performance Requirements" Article, but not less than 6.24 lbf/sq. ft. (300 Pa), and shall not evidence water penetration.
C. Aluminum-framed entrances and storefronts will be considered defective if they do not pass tests and inspections.
D. Prepare test and inspection reports.
END OF SECTION 084113
GENERAL DEMOLITION NOTES:
1. THE OWNER HAS FIRST SALVAGEABLE RIGHTS TO
ALL ITEMS INDICATED FOR DEMOLITION. ITEMS TO
BE SALVAGED PRIOR TO COMMENCING WORK.
THESE ITEMS SHALL BE REMOVED IN GOOD
CONDITION AND TURNED TO THE OWNER.
2. THE CONTRACTOR SHALL PROVIDE ALL SHORING,
TEMPORARY SUPPORTS, AND BRACING REQUIRED
FOR THE SAFE DEMOLITION AND ERECTION OF
STRUCTURAL COMPONENTS.
3. ALL BUILDING MATERIALS BEING DEMOLISHED
SHALL BE DISPOSED OF PROPERLY BY THE
CONTRACTOR, EXCLUDING THOSE ITEMS
SALVAGED BY THE OWNER.
4. PROTECT ADJACENT MEMBERS, FINISHES,
SURFACES, AND VEGETATION FROM DAMAGE
DURING DEMOLITION WORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTION OF BUILDING OCCUPANTS AND
PUBLIC THROUGHOUT THE COURSE OF WORK.
MAINTAIN REQUIRED EGRESS ROUTES AND
ACCESS AT ALL TIMES.
6. ALL AREAS DAMAGED BY DEMOLITION TO BE
PATCHED AND REPAIRED TO MATCH EXISTING
ADJACENT SURFACES. THIS IS TO INCLUDE HOLES
LEFT FROM EQUIPMENT MOUNTING HARDWARE,
BRACKETS, ETC.
7. CONTRACTOR TO PROVIDE A DUST SEPARATION
BETWEEN THE EXISTING AND NEW CONSTRUCTION
TO PREVENT ANY DUST MIGRATION INTO
ADJACENT UNDISTURBED AND/OR OCCUPIED
ZONES.
8. WORK SHALL BE PHASED TO DISRUPT ACCESS TO
ONE ENTRANCE AT A TIME AND ADA ACCESS TO AT
LEAST ONE ENTRANCE IS TO BE MAINTAINED AT
ALL TIMES.
A1
C1 C2
DNDN DN
DNDN
35' - 6" 25' - 6" V.I.F.
10101010
D1B1
10 10
20 20 20
V .I .F
SOUTHWEST AREA
S O
U T
H W
E S
T A
R E
A
SOUTHEAST AREA
S O
U T
H E
A S
T A
R E
A
2 2
JEROME T. HART
STATE OFFICE BUILDING
NORTH AREA NORTH AREA
PROJECT WORK LIMITS
PROJECT WORK LIMITS
NOTE:
DEMO CONCRETE UP TO
EXISTING CONTROL JOINTS.
SOIL EROSION (SESC) NOTES:
1. ALL WORK WITHIN THIS CONTRACT MUST COMPLY
WITH THE APPLICABLE SOIL EROSION AND
SEDIMENTATION CONTROL RULES AND
REGULATIONS (SOIL EROSION AND
SEDIMENTATION CONTROL – 1994 PA 451, PART 91,
AS AMENDED, MCL 324.9101 ET SEQ.) AND SPECIFIC
PROVISIONS FOR SAME WITHIN THE CONTRACT
DOCUMENTS. SOIL EROSION AND SEDIMENTATION
CONTROL WILL BE MONITORED AND ENFORCED BY
THE DEPARTMENT OF TECHNOLOGY,
MANAGEMENT AND BUDGET, STATE FACILITIES
ADMINISTRATION.
2. SOIL EROSION AND SEDIMENTATION CONTROL ON
DEPARTMENT PROJECTS WILL BE MONITORED AND
ENFORCED BY STATE FACILITIES ADMINISTRATION
THROUGH THE REVIEW OF CONTRACTOR
IMPLEMENTATION PLANS AND SITE INSPECTIONS
BY SOIL EROSION AND SEDIMENTATION CONTROL
UNIT PERSONNEL AND/OR STATE FACILITIES
ADMINISTRATION REPRESENTATIVE.
3. IN THE EVENT, THE OWNER DETERMINES
THROUGH SITE INSPECTIONS BY THE STATE
FACILITIES ADMINISTRATION REPRESENTATIVE OR
BY NOTIFICATION BY REGULATORY AUTHORITIES
THAT THE CONTRACTOR HAS NOT MET THE SOIL
EROSION REQUIREMENTS OF THE PROJECT
AND/OR IS IN VIOLATION OF THE APPLICABLE SOIL
EROSION AND SEDIMENTATION CONTROL
STATUTES, THE CONTRACTOR SHALL BE NOTIFIED
IN WRITING AND STOP WORK ORDERS MAY BE
ISSUED BY STATE FACILITIES ADMINISTRATION IN
CONJUNCTION WITH PARAGRAPH 2.3 OF SECTION
00700 GENERAL CONDITIONS.
4. IN THE EVENT, THE OWNER DETERMINES
THROUGH SITE INSPECTIONS BY THE STATE
FACILITIES ADMINISTRATION REPRESENTATIVE OR
BY NOTIFICATION BY REGULATORY AUTHORITIES
THAT THE CONTRACTOR HAS NOT MET THE SOIL
EROSION REQUIREMENTS OF THE PROJECT
AND/OR IS IN VIOLATION OF THE APPLICABLE SOIL
EROSION AND SEDIMENTATION CONTROL
STATUTES, THE CONTRACTOR SHALL BE NOTIFIED
IN WRITING AND CORRECTIVE ACTIONS
UNDERTAKEN BY STATE FACILITIES
ADMINISTRATION IN CONJUNCTION WITH
PARAGRAPH 9.4 OF SECTION 00700 GENERAL
CONDITIONS.
5. IN THE EVENT, THE CONTRACTOR FAILS TO
RESPOND TO WRITTEN NOTICE FROM STATE
FACILITIES ADMINISTRATION REGARDING
NONCOMPLIANCE WITH THE PROVISIONS OF THE
CONTRACT DOCUMENTS AND/OR SOIL EROSION
AND SEDIMENTATION CONTROL REGULATIONS
APPLICABLE TO THIS WORK, STATE FACILITIES
ADMINISTRATION HAS THE RIGHT TO ASSESS A
FINE TO THE CONTRACTOR. FINES SHALL BE IN
ADDITION TO ANY OTHER REMEDIATION COSTS OR
LIQUIDATED DAMAGES APPLICABLE TO THE
PROJECT AND MAY EXCEED THE VALUE OF THE
CONTRACT.
#. DEMOLITION KEYNOTES
1 REMOVE EXISTING PORTION OF CONCRETE SLAB
(HATCHED AREA) FOR NEW CONCRETE SLAB WITH
NEW SNOWMELT SYSTEM.
2 REMOVE EXISTING CONCRETE SLAB.
3 REMOVE EXISTING CONCRETE STAIR STRUCTURE.
4 REMOVE EXISTING CONCRETE RAMP STRUCTURE.
5 REMOVE AND SALVAGE EXISTING HANDRAIL
ASSEMBLY FOR RE-USE AS REQUIRED.
6 REMOVE EXISTING BRICK CHEEK WALL
ASSEMBLY. SALVAGE EXISTING BRICK AND
GRANITE CAP FOR RE-USE AS REQUIRED.
7 REMOVE EXISTING CONCRETE LANDING
(HATCHED AREA) FOR NEW CONCRETE LANDING
WITH NEW SNOWMELT SYSTEM.
8 REMOVE EXISTING STOREFRONT SYSTEM FOR
NEW.
9 REMOVE EXISTING PORTION OF CONCRETE CURB.
10 REMOVE EXISTING TREE. GRIND STUMP AND
ROOT CROWN TO A DEPTH OF 24" INCHES INA 5
FEET RADIUS AROUND THE TREE.
11 REMOVE EXISTING TREE. GRUB OUT ALL ROOTS
IN EXISTING PLANTING AREA AND ANY ROOTS
UNDER SURROUNDING PAVEMENT THAT IS
SCHEDULED TO BE REMOVED.
12 CUT ALL ROOTS EXTENDING NORTH ALONG THIS
LINE. GRUB OUT ALL ROOTS UNDERNEATH
REMOVED CONCRETE WALKWAY.
13 REMOVE EXISTING TREE INCLUDING STUMP,
MAJOR TREE ROOTS, GRATE AND BRICK PAVERS.
14 REMOVE EXISTING POLETOP LIGHTING & POST
FOR NEW. EXISTING BASE FOUNDATION TO
REMAIN (RE: ELECTRICAL).
15 REMOVE EXISTING TABLE AND BENCHES AND
SALVAGE FOR REINSTALLATION. CLEAN, REMOVE
RUST AND REPAINT BASES.
16 REMOVE EXISTING ADA PUSH BUTTON RAIL.
18 REMOVE EXISTING FLOOR DRAIN (RE:
MECHANICAL).
19 REMOVE EXISTING POLETOP LIGHTING, POST AND
FOUNDATION FOR RE-LOCATION.
20 REMOVE EXISTING TREES AND GRIND STUMP AND
ROOT CROWN TO A DEPTH OF 24 INCHES IN A 5
FEET RADIUS AROUND EACH TREE (RE:
ALTNERATE NO. 2 AND PLANTING PLANS).
21 REMOVE EXISTING TRASH CAN AND ASH TRAY
POST RECEPTACLES AND SALVAGE FOR
REINSTALLATION.
22 REMOVE EXISTING STONE MULCH. STOCK PILE
AND RE-USE.
23 REMOVE EXISTING HANDRAIL ASSEMBLY.
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
FILE NO.
171/25046.CTS
/1
/2
:3 :1
A
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-S a g in a w
S tO ff ic e R e p la c e E n t_
V rs o v a W
T A
.r v t
W T
A
2025009
SEPT. 26, 2025
J.R.G.
JEROME T. HART
STATE OFFICE BUILDING
A1.00
SAGINAW, MI 48607
EXTERIOR ENTRANCE
REPLACEMENT FOR:
SITE DEMOLITION PLAN
NORTH SCALE: 1/16" = 1'-0"
SITE DEMOLITION PLAN
NO. REVISION DATE
ISSUE FOR BIDS 09/26/25
A2 ADDENDUM NO. 2 10/15/25
A2A2
A2
A2
GENERAL PLAN NOTES:
1. DIMENSIONS ARE FROM FACE OF MASONRY
UNLESS NOTED OTHERWISE. REFER TO ENLARGED
PLANS FOR ADDITIONAL DIMENSIONS NOT
INDICATED ON OVERALL PLANS.
2. MECHANICAL, PLUMBING AND ELECTRICAL
FIXTURES AND EQUIPMENT ARE SHOWN FOR
REFERENCE ONLY. REFER TO MECHANICAL,
PLUMBING, AND ELECTRICAL DRAWINGS FOR
DETAILS AND SPECIFICATIONS.
3. CONTRACTOR IS RESPONSIBLE TO ENSURE ALL
WORK CONFORMS WITH APPLICABLE NATIONAL,
STATE AND LOCAL CODES, LAWS AND
REGULATIONS.
4. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
BIDDING AND CONSTRUCTION. ARCHITECT SHALL
BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
BEFORE PROCEEDING WITH WORK.
A2.32
A2.31
DN
DNDN DN
DN
DN
DNDN
DN
DNDN
DN
A2.33
A1
C1 C2
D1B1
DN
C3
C4
DN
A2.01
BASEMENT
BELOW
NORTHWEST NORTHEAST
SOUTHEAST
DN
DN
SNOW MELT PUMP EQUIPMENT
(RE: MECHANICAL/ELECTRICAL)
HOUSEKEEPING PAD
(RE: DETAIL )/3 A2.01
SNOW MELT MANIFOLD EQUIPMENT
(RE: MECHANICAL/ELECTRICAL)
CORE DRILL EXISTING FOUNDATION WALL
AND PROVIDE PRE-MANUFACTURED PIPE
SEAL UNIT FOR WATERTIGHT SEAL
DN
EPOXY DOWEL INTO
CONC SLAB
EXISTING FINISHED FLOOR
SLAB SURFACE SHALL BE
ROUGHENED IN PREP
FOR CONC PAD
CONCRETE BASE,
CHAMFER ALL OUTSIDE
CORNERS
6x6 W1.4xW1.4 W.W.F.
W/ 2" COVER (TYP.)
NOTE:
EXTEND EDGE OF PAD MIN. 4" BEYOND
EQUIPMENT FRAME, TYPICAL ALL SIDES.
E M
B E
D M
E N
T
M
IN
#4 @ 12" O.C. ALONG
PERIMETER OF PAD
1' - 0"
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
FILE NO.
171/25046.CTS
/1
/2
:0 :2
P
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-S a g in a w
S tO ff ic e R e p la c e E n t_
V rs o v a W
T A
.r v t
W T
A
2025009
SEPT. 26, 2025
J.R.G.
JEROME T. HART
STATE OFFICE BUILDING
A2.01
SAGINAW, MI 48607
EXTERIOR ENTRANCE
REPLACEMENT FOR:
FIRST FLOOR MASTER
PLAN & PARTIAL
BASEMENT PLAN
NORTH SCALE: 1/16" = 1'-0"
FIRST FLOOR MASTER PLAN
NORTH SCALE: 1/8" = 1'-0"
PARTIAL BASEMENT PLAN
SCALE: 3/4" = 1'-0"A2.01
CONC HOUSEKEEPING PAD DETAIL3
NO. REVISION DATE
ISSUE FOR BIDS 09/26/25
A2 ADDENDUM NO. 2 10/15/25
DN
DN
DN
EXISTING
TURF
@ 1:48 MAX.
5' - 0" LANDING
@ 1:12 MAX.
15' - 0" RAMP RUN
@ 1:48 MAX.
16' - 0" LANDING
@ 1:12 MAX.
22' - 4" RAMP RUN 16' - 8"
:4 M
A X
L A
N D
IN
G
:1 M
A X
R
A M
P R
U N
T
A2.32
PLANTING AREA
1' - 0" 5T @ 12" = 5' - 0"
A2.32
11' - 8" 10' - 0"
R 11' - 8"
R
' - 8
A2.33 SIM
A2.33 SIM
A2.33
A2.33
C1.1
C1.2
W 2.2
W .1
15' - 0" 30' - 0" 10' - 0"
R
R 5' - 0" R
R 5' - 0"
5 6
A2.33
A2.33
100' - 0"
DN
R
R 5' - 0"
1' - 0"
" 4
4' - 0"
1' - 0"
5' - 0"
1' - 0"
22' - 4"1
A2.32
EXISTING
CONCRETE
CURB
21' - 8"
1' - 6"
1' - 0"
EXISTING
CONCRETE
CURB
A2.32 SIM
A1.01
3"
3" 4' - 6" 3"
A D
A C
R
1/8" / FT M
IN
S
LO
P E
/8
F
T M
IN
S L O
P E
1/8" / F
T M
IN
SLOPE
1/8" / FT M
IN
S
LO
P E
/8
F
T M
IN
S L O
P E
A3.21
6' - 8"
NOTE:
SEE LANDSCAPE PLAN SHEET
L1.01 & L1.02 FOR LOCATION OF
JOINTS. PROVIDE TOOL JOINTS
IN AREAS OF SNOWMELT - DO
NOT SAWCUT.
20 20
8' - 8"
GENERAL PLAN NOTES:
1. DIMENSIONS ARE FROM FACE OF MASONRY
UNLESS NOTED OTHERWISE. REFER TO ENLARGED
PLANS FOR ADDITIONAL DIMENSIONS NOT
INDICATED ON OVERALL PLANS.
2. MECHANICAL, PLUMBING AND ELECTRICAL
FIXTURES AND EQUIPMENT ARE SHOWN FOR
REFERENCE ONLY. REFER TO MECHANICAL,
PLUMBING, AND ELECTRICAL DRAWINGS FOR
DETAILS AND SPECIFICATIONS.
3. CONTRACTOR IS RESPONSIBLE TO ENSURE ALL
WORK CONFORMS WITH APPLICABLE NATIONAL,
STATE AND LOCAL CODES, LAWS AND
REGULATIONS.
4. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
BIDDING AND CONSTRUCTION. ARCHITECT SHALL
BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
BEFORE PROCEEDING WITH WORK.
FIRST FLR
100' - 0"
GRADE
97' - 6"
A2.32
B.O. FTG
94' - 0"
T.O. FTG
95' - 0"
1' - 0"
@ 1:12 MAX.
22' - 4" RAMP RUN
@ 1:48 MAX.
16' - 0" LANDING
@ 1:12 MAX.
15' - 0" RAMP RUN1' - 0"
R
IS
E
T .O
W
A L
L
M
IN
CLR
1 1/2"
CLR
1 1/2"
A2.32
5' - 0"
4' - 6"
53' - 4"
FIRST FLR
100' - 0"
GRADE
97' - 6"
A2.32
B.O. FTG
94' - 0"
T.O. FTG
95' - 0"
1' - 0" 15' - 0"
@ 1:48 MAX.
10' - 0" LANDING
5' - 0"
T .O
W
A L
L
" 21
1' - 6" 25' - 0"
R
IS
E
CLR
1 1/2"
4' - 6"
NOTE:
CONTRACTOR TO VERIFY
LOCATION OF ALL WEEP
TUBES. STEP NEW WEEPS AND
FLASHING ABOVE FINAL RAMP
SURFACE.
A2.32
FIRST FLR
100' - 0"
GRADE
97' - 6"
B.O. FTG
94' - 0"
T.O. FTG
95' - 0"
4" 1' - 0" 4"
A2.33
T .O
W
A L
L
M
IN
V A
R
IE
S
1' - 0" CLR
1 1/2"
12" LEG ON BENT
#4 BAR
(3) #4 BARS CONT.
#4 BARS HORIZ.
@ 18" O.C.
#4 BARS HORIZ.
@ 12" O.C.
#4 BARS @ 12" O.C.
EA. FACE
12" MASONRY WALL W/
4" BRICK EA FACE W/
THRU WALL TIES @ 16"
O.C. HORIZ. & VERT.
GROUT CORE SOLID
W/ #4 BARS @ 12" O.C.
VERT. & #4 BARS @ 12"
O.C. HORIZ.
1/2" EXPANSION JOINT
W/ FILLER
5" CONC. SLAB
W/ 6x6-W2.9xW2.9
W.W.F. ON
COMPACTED
GRANULAR FILL
THICKENED SLAB
@ SLEEVE FOR
HANDRAIL (TYP.)
5" CONC. SLAB W/ 6x6- W2.9xW2.9 W.W.F. ON
COMPACTED
GRANULAR FILL
2" THICK HIGH
DENSITY
INSULATION
1-1/2" DIA.
ALUM PIPE
HANDRAIL
4" GROUTED
SOLID C.M.U.
DAMPROOFING
BOTH SIDES
FIRST FLR
100' - 0" 4 1/2"
M
IN
WEEPS @ 32" O.C.
S.S. THRU-WALL
FLASHING W/ 1/2"
HEMMED DRIP EDGE,
EXTEND PAST BRICK
CAVITY DRAINAGE SYSTEM
EXISTING FACE BRICK
CAREFULLY
OVERLAP EXISTING
WEATHER BARRIER
ON NEW FLASHING
A L
IG
N
EXISTING WEEP TUBE
GROUT SOLID CAVITY
BELOW NEW RAMP
FACE BRICK TO
MATCH EXISTING
4" SOLID C.M.U.
M
IN
EXISTING FLOOR
CONSTRUCTION
EXISTING INTERIOR
WALL CONSTRUCTION
EXISTING CONC.
FOUNDATION WALL
DAMPROOFING THIS
SIDE & TOP OF CONC.
WALL
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
FILE NO.
171/25046.CTS
/1
/2
:0 :3
P
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-S a g in a w
S tO ff ic e R e p la c e E n t_
V rs o v a W
T A
.r v t
W T
A
2025009
SEPT. 26, 2025
J.R.G.
JEROME T. HART
STATE OFFICE BUILDING
A2.32
SAGINAW, MI 48607
EXTERIOR ENTRANCE
REPLACEMENT FOR:
ENLARGED NORTHWEST
AREA PLAN & DETAILS
NORTH
SCALE: 1/4" = 1'-0"A2.32
ENLARGED NORTHWEST AREA PLAN1
SCALE: 3/8" = 1'-0"A2.32
NORTHWEST RAMP SECTION5
SCALE: 3/8" = 1'-0"A2.32
NORTHWEST RAMP SECTION3
SCALE: 3/4" = 1'-0"A2.32
NORTHWEST CHEEKWALL SECTION4
. PLAN KEYNOTES
1 5" THICK CONCRETE SLOPED WALK @ 1:20 MAX. W/
6x6-W2.9xW2.9 W.W.F. ON COMPACTED GRANULAR
FILL.
2 5" CONCRETE PAVEMENT W/ 6x6-W2.9xW2.9 W.W.F.
ON COMPACTED GRANULAR FILL.
3 UTILIZE SALVAGED EXISTING HANDRAIL AS ABLE
AND PROVIDE NEW RAILING TO MATCH EXISTING
AS REQUIRED.
4 BRICK VENEER CHEEK WALL INFILL TO MATCH
ADJACENT CONSTRUCTION.
5 CONCRETE CURB. RE: DETAIL 5/A2.33.
6 POLETOP LIGHTING & POLE IN EXISTING LOCATION
(RE: ELECTRICAL).
7 12" MASONRY WALL W/ 4" BRICK EA. FACE W/
THRU-WALL TIES @ 16" O.C. HORIZ. & VERT.,
GROUT CORE SOLID W/ #4 BARS @ 12" O.C. VERT. &
#4 BARS @ 12" O.C. HORIZ.
8 GRANITE WALL CAP. RE-USE SALVAGED GRANITE
CAP PIECES.
9 5" THICK CONCRETE SLAB W/ 6x6-W2.9xW2.9 W.W.F.
ON COMPACTED GRANULAR FILL, TYP. W/ SNOW
MELT SYSTEM (RE: MECHANICAL & COORD. W/
SNOW MELT PROVIDER).
10 5" THICK CONCRETE SLAB LANDING W/
6x6-W2.9xW2.9 W.W.F. ON COMPACTED GRANULAR
FILL, TYP. W/ SNOW MELT SYSTEM (RE:
MECHANICAL & COORD. W/ SNOW MELT
PROVIDER).
11 1-1/2" DIAMETER ALUMIMUM PIPE HANDRAIL.
12 1-1/2" DIAMETER ALUMIMUM POST LOCATION
(TYP.).
13 CONCRETE REINFORCED STAIR ON COMPACTED
GRANULAR FILL, TYP. W/ SNOW MELT SYSTEM (RE:
MECHANICAL & COORD. W/ SNOW MELT
PROVIDER).
14 #4 BAR @ 12" O.C. EACH WAY.
15 #4 BAR TYPICAL @ STAIR NOSING, EPOXY COATED
W/ #3 HAIRPINS.
16 CONCRETE STEM WALL FOUNDATION W/ #4 BARS
@ 12" O.C. EA. FACE & #3 BARS HORIZ @ 12" O.C.
17 20" x 12" CONCRETE SPREAD FOOTING W/ (3) #4
CONT.
18 5" CONCRETE RAMP W/ 6x6-W2.9xW2.9 W.W.F. ON
COMPACTED GRANULAR FILL, TYP. W/ SNOW MELT
SYSTEM (RE: MECHANICAL & COORD. W/ SNOW
MELT PROVIDER).
19 2" THICK HIGH DENSITY INSULATION.
20 LIGHT POLE FIXTURE IN NEW LOCATION (RE:
ELECTRICAL).
21 1/2" EXPANSION JOINT WITH FILLER.
22 REMOVE ALL BLOCKAGES FROM EXISTING BRICK
WEEP TUBES ADJACENT TO THE NEW NORTHWEST
RAMP.
23 LANDSCAPING AREA (RE: LANDSCAPING PLANS).
24 INDICATES MULLION MOUNTED ADA PUSH BUTTON
(ADA) AND CARD READER (CR).
25 CONCRETE REINFORCED WALL W/ #4 BAR VERT. @
12" O.C. & #4 BAR HORIZ. @ 12" O.C.
26 PRECAST CONCRETE CAP.
27 CONCRETE REINFORCED STAIR ON COMPACTED
GRANULAR FILL.
NOTE:
CONTRACTOR TO VERIFY
AMD ADJUST FINAL GRADES
IN FIELD AS REQUIRED.
SCALE: 1 1/2" = 1'-0"A2.32
THRU-WALL FLASHING/WEEP DETAIL6
NO. REVISION DATE
ISSUE FOR BIDS 09/26/25
A2 ADDENDUM NO. 2 10/15/25
EXISTING CONC
SIDEWALK
T
16' - 8" 5T @ 12" = 5' - 0" 1' - 0"
PLANTING AREA
R
1'
C2.2
C2.1
R 6' - 8
10' - 0" 11' - 8"
A2.33
A2.33 SIM
A2.33
A2.33
10' - 0" 35' - 0"
R 5' - 0"
R
R
R 5' - 0"
A2.33
A2.33
W
3.2 W
.1
21' - 8" 8' - 8"
3"
CR
ADA
/8
F
T M
IN
S L O
P E
1/8" / FT MIN.
SLOPE1/
8"
FT M
IN
SLO
PE
1/8" / FT MIN.
SLOPE
A3.21
OPP
6' - 8"
NOTE:
SEE LANDSCAPE PLAN SHEET
L1.01 & L1.02 FOR LOCATION OF
JOINTS. PROVIDE TOOL JOINTS IN
AREAS OF SNOWMELT - DO NOT
SAWCUT.
20 20
100' - 0"
EXISTING CURB TO REMAIN
GENERAL PLAN NOTES:
1. DIMENSIONS ARE FROM FACE OF MASONRY
UNLESS NOTED OTHERWISE. REFER TO ENLARGED
PLANS FOR ADDITIONAL DIMENSIONS NOT
INDICATED ON OVERALL PLANS.
2. MECHANICAL, PLUMBING AND ELECTRICAL
FIXTURES AND EQUIPMENT ARE SHOWN FOR
REFERENCE ONLY. REFER TO MECHANICAL,
PLUMBING, AND ELECTRICAL DRAWINGS FOR
DETAILS AND SPECIFICATIONS.
3. CONTRACTOR IS RESPONSIBLE TO ENSURE ALL
WORK CONFORMS WITH APPLICABLE NATIONAL,
STATE AND LOCAL CODES, LAWS AND
REGULATIONS.
4. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
BIDDING AND CONSTRUCTION. ARCHITECT SHALL
BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY
BEFORE PROCEEDING WITH WORK.
FIRST FLR
100' - 0"
GRADE
97' - 6"
B.O. FTG
94' - 0"
T.O. FTG
95' - 0"
R
M
IN
LANDING - VARIES 5T @ 12" = 5' - 0" 1' - 0"
C
LR
/2
C
LR
4" 1' - 0" 4"
1' - 0"
3"
1' - 0"
1/8" / FT MIN.
SLOPE
4 1/4"
A2.33
PATCH & REPAIR EXISTING
WATER PROOFING OR
PROVIDE NEW
DAMPROOFING AS
REQUIRED
CONCRETE
CURB
#4 BAR CONT. T&B
6"
CONCRETE PAVEMENT
PER PLANS
1/2" EXPANSION JOINT
W/ JOINT FILLER
PLANTING AREA
T.O. SLAB
T
SAWCUT
CONCRETE SLAB
WITH W.W.F. ON
SUPPORTS
COMPACTED
BACKFILL
SEAL JOINT
SAWCUT AND FILL
W/ JOINT FILLER
T.O. SLAB
CONCRETE SLAB WITH W.W.F.
ON SUPPORTS IN TOP
1/3 OF SLAB
COMPACTED
BACKFILL
SAWCUT AND FILL
W/ JOINT FILLER
2' - 0"
T T
CONTROL JOINT (CJ)
CONSTRUCTION JOINT
NOTE:
SEE LANDSCAPE PLAN SHEET L1.01
& L1.02 FOR LOCATION OF JOINTS.
1' - 0" 1' - 0"
3/4" DIA. SMOOTH
DOWELS x 1' - 6" @ 16" O.C., GREASE ONE END
SAWCUT
C L R
E Q
E Q
T /4
T /4
NOTE:
USE 3" MESH SUPPORTS
OR SIMILAR.
T.O. SLAB
TOOL JOINT
CONCRETE SLAB
WITH W.W.F.
COMPACTED
BACKFILL
SEAL JOINT
TOOL JOINT AND FILL
W/ JOINT FILLER -
VERIFY DEPTH W/
SNOWMELT SUPPLIER
CONTROL JOINT (CJ)
W/ SNOWMELT
NOTE:
SEE LANDSCAPE PLAN SHEET L1.01 &
L1.02 FOR LOCATION OF JOINTS.
PROVIDE TOOL JOINTS IN AREAS OF
SNOWMELT - DO NOT SAWCUT.
PEX TUBING
HIGH DENSITY
INSULATION
MIN. COVERAGE
NOTE:
USE 3" MESH SUPPORTS
OR SIMILAR.
FIRST FLR
100' - 0"
A2.33
4" 1' - 0" 4"
T .O
W
A L
L
/4
V .I .F
M
IN
SIM.
EXIST PAVEMENT
1/2" EXPANSION
JOINT W/ FILLER
DAMPPROOFING ON
BOTH SIDES & TOP OF
CONC. WALL @ BRICK
VENEER
12" LEG ON BENT
#4 BAR
(3) #4 BARS CONT.
#4 BARS HORIZ.
@ 18" O.C.
#4 BARS HORIZ.
@ 12" O.C.
#4 BARS @ 12"
O.C. EA. FACE
12" MASONRY WALL
W/ 4" BRICK EA FACE
W/ THRU WALL TIES
@ 16" O.C. HORIZ. &
VERT.
DOVETAIL SLOTS @
24" O.C. W/ ANCHORS
@ 16" O.C.
4 1/2"
INCREASE SLAB DEPTH
@ SLEEVE FOR
HANDRAIL POST (TYP)
1-1/2" DIA. ALUM PIPE
RAILING - UTILIZE
SALVAGED EXISTING
AS ABLE
5" CONCRETE
PAVEMENT W/ 6x6- W2.9xW2.9 W.W.F. ON
COMPACTED
GRANULAR FILL.
1/2" EXPANSION JOINT
W/ FILLER
ROUND
1/2" MAX.
30° MAX.
1"
#5 HAIRPINS
@ 12" O.C.
FIRST FLR
100' - 0"
B.O. FTG
94' - 0"
T.O. FTG
95' - 0"
PLANTING AREA
4" 1' - 0" 4"
1' - 8"
T .O
W
A L
L
/8
V .I .F
M
IN
1' - 0"
A2.33
SIM.
12" MASONRY WALL W/ 4" BRICK
EA FACE W/ THRU WALL TIES @
16" O.C. HORIZ. & VERT.
5" CONCRETE SLOPED WALK
W/ 6x6-W2.9xW2.9 W.W.F. ON
COMPACTED GRAN. FILL
DAMPROOFING THIS SIDE
& TOP OF CONC. WALL
#4 BARS @ 12" O.C. VERT.
#4 BARS @ 12" O.C. HORIZ.
#4 BARS @ 18" O.C.
(3) #4 BARS CONT.
12" LEG ON BENT $4 BAR
1/2" EXPANSION JOINT W/
FILLER
GROUT CORE SOLID W/ #4
BARS @ 12" O.C. VERT. & #4
BARS @ 12" O.C. HORIZ.
/2
/4
1' - 0"
6" 6"
1"
1"
FACE BRICK W/
THRU WALL TIES
@ 16" O.C.
CAULKING THRU WALL COPPER
FLASHING W/ 1/2"
HEMMED EDGE @ HEAD
JOINT IN WALL CAP, TYP.
EXISTING SALVAGED
GRANITE WALL CAP
FASTENED TO TOP OF
WALL PER MANUF. REC.
1" MIN. DEEP CAULKING
@ HEAD JOINTS
FACE BRICK W/ THRU
WALL TIES @ 16" O.C.
CAULKING
GROUT CORE SOLID
W/ #4 BARS @ 12" O.C.
VERT. & #4 BARS @
12" O.C. HORIZ.
A2.31
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
FILE NO.
171/25046.CTS
/1
/2
:5 :4
P
M C
U se rs
\r so va \D o cu m e n ts
\C E
N T
R A
L -2
-S a g in a w
S tO ff ic e R e p la ce E n t_
V rs o va
W T
A .r vt W
T A
2025009
SEPT. 26, 2025
J.R.G.
JEROME T. HART
STATE OFFICE BUILDING
A2.33
SAGINAW, MI 48607
EXTERIOR ENTRANCE
REPLACEMENT FOR:
ENLARGED NORTHEAST
AREA PLAN & DETAILS
NORTH
SCALE: 1/4" = 1'-0"A2.33
ENLARGED NORTHEAST AREA PLAN1
SCALE: 1/2" = 1'-0"A2.33
TYP. NORTH STAIR SECTION2
SCALE: 1" = 1'-0"A2.33
CONC CURB DETAIL6
SCALE: 3/4" = 1'-0"A2.33
CONTROL/CONSTRUCTION JOINTS4
SCALE: 3/4" = 1'-0"A2.33
CONTROL JOINT - SNOW MELT5
SCALE: 3/4" = 1'-0"A2.33
SOUTHEAST CHEEKWALL SECTION9
SCALE: N.T.S.A2.33
STAIR NOSING DETAIL3
SCALE: 3/4" = 1'-0"A2.33
SOUTHEAST SLOPED WALK SECTION8
. PLAN KEYNOTES
1 5" THICK CONCRETE SLOPED WALK @ 1:20 MAX. W/
6x6-W2.9xW2.9 W.W.F. ON COMPACTED GRANULAR
FILL.
2 5" CONCRETE PAVEMENT W/ 6x6-W2.9xW2.9 W.W.F.
ON COMPACTED GRANULAR FILL.
3 UTILIZE SALVAGED EXISTING HANDRAIL AS ABLE
AND PROVIDE NEW RAILING TO MATCH EXISTING
AS REQUIRED.
4 BRICK VENEER CHEEK WALL INFILL TO MATCH
ADJACENT CONSTRUCTION.
5 CONCRETE CURB. RE: DETAIL 5/A2.33.
6 POLETOP LIGHTING & POLE IN EXISTING LOCATION
(RE: ELECTRICAL).
7 12" MASONRY WALL W/ 4" BRICK EA. FACE W/
THRU-WALL TIES @ 16" O.C. HORIZ. & VERT.,
GROUT CORE SOLID W/ #4 BARS @ 12" O.C. VERT. &
#4 BARS @ 12" O.C. HORIZ.
8 GRANITE WALL CAP. RE-USE SALVAGED GRANITE
CAP PIECES.
9 5" THICK CONCRETE SLAB W/ 6x6-W2.9xW2.9 W.W.F.
ON COMPACTED GRANULAR FILL, TYP. W/ SNOW
MELT SYSTEM (RE: MECHANICAL & COORD. W/
SNOW MELT PROVIDER).
10 5" THICK CONCRETE SLAB LANDING W/
6x6-W2.9xW2.9 W.W.F. ON COMPACTED GRANULAR
FILL, TYP. W/ SNOW MELT SYSTEM (RE:
MECHANICAL & COORD. W/ SNOW MELT
PROVIDER).
11 1-1/2" DIAMETER ALUMIMUM PIPE HANDRAIL.
12 1-1/2" DIAMETER ALUMIMUM POST LOCATION
(TYP.).
13 CONCRETE REINFORCED STAIR ON COMPACTED
GRANULAR FILL, TYP. W/ SNOW MELT SYSTEM (RE:
MECHANICAL & COORD. W/ SNOW MELT
PROVIDER).
14 #4 BAR @ 12" O.C. EACH WAY.
15 #4 BAR TYPICAL @ STAIR NOSING, EPOXY COATED
W/ #3 HAIRPINS.
16 CONCRETE STEM WALL FOUNDATION W/ #4 BARS
@ 12" O.C. EA. FACE & #3 BARS HORIZ @ 12" O.C.
17 20" x 12" CONCRETE SPREAD FOOTING W/ (3) #4
CONT.
18 5" CONCRETE RAMP W/ 6x6-W2.9xW2.9 W.W.F. ON
COMPACTED GRANULAR FILL, TYP. W/ SNOW MELT
SYSTEM (RE: MECHANICAL & COORD. W/ SNOW
MELT PROVIDER).
19 2" THICK HIGH DENSITY INSULATION.
20 LIGHT POLE FIXTURE IN NEW LOCATION (RE:
ELECTRICAL).
21 1/2" EXPANSION JOINT WITH FILLER.
22 REMOVE ALL BLOCKAGES FROM EXISTING BRICK
WEEP TUBES ADJACENT TO THE NEW NORTHWEST
RAMP.
23 LANDSCAPING AREA (RE: LANDSCAPING PLANS).
24 INDICATES MULLION MOUNTED ADA PUSH BUTTON
(ADA) AND CARD READER (CR).
25 CONCRETE REINFORCED WALL W/ #4 BAR VERT. @
12" O.C. & #4 BAR HORIZ. @ 12" O.C.
26 PRECAST CONCRETE CAP.
27 CONCRETE REINFORCED STAIR ON COMPACTED
GRANULAR FILL.
SCALE: 3" = 1'-0"A2.33
CHEEK WALL CAP DETAIL7
NO. REVISION DATE
ISSUE FOR BIDS 09/26/25
A2 ADDENDUM NO. 2 10/15/25
FRAME TYPE GENERAL NOTES:
1. REFER TO SPECIFICATIONS NUMBER 088000 FOR
GLAZING TYPE INFORMATION.
2. PROVIDE SAFETY GLAZING PER SPECIFICATION
AS REQUIRED BY CODE.
INDICATES LOCATION OF TEMPERED
GLASS
T
INDICATES INSULATED GLAZING
LOCATIONS
GLAZING TYPES:
INDICATES INSULATED SPANDREL
PANEL LOCATIONS
DOOR & FRAME GENERAL NOTES:
1. ALL DIMENSIONS INDICATE ROUGH OPENING
DIMENSIONS.
2. REFER TO SPECIFICATIONS NUMBER 087100 FOR
DOOR HARDWARE.
3. PROVIDE SEALANT AT JOINTS BETWEEN ALL DOOR
AND WINDOW FRAMES AND ADJACENT MATERIALS
(FIRE RATED SEALANT AT RATED FRAMES).
4. AT ALL DOORS AND FRAMES COORDINATE
SECURITY DEVICES SPECIFICATIONS AND
ELECTRICAL DRAWINGS. COORDINATE WITH
OWNER ACCESS CONTROL REQUIREMENTS FOR
FRAME PREP AND ELECTRICAL ROUTING WHERE
REQUIRED.
FIRST FLR
100' - 0"
W1
EXTERIOR STOREFRONT
GLAZING:GL-A
FRAME:DARK BRONZE
A3.21
A3.21
A3.21
A3.21
OPP.
14' - 1" V.I.F.
DOOR
REMOVABLE
MULLION
2" 3' - 7 1/2" 2" 6' - 2" 2" 3' - 7 1/2" 2"
T
T
T
T
FIRST FLR
100' - 0"
W2.2
EXTERIOR STOREFRONT
GLAZING:GL-A
FRAME:DARK BRONZE
W2.1 CL
RE:
DOOR
T
A3.21
A3.21
A3.21
5' - 2 1/2" V.I.F.
A3.21
/17 A3.21
T
FIRST FLR
100' - 0"
W2.1
EXTERIOR STOREFRONT
GLAZING:GL-A
FRAME:DARK BRONZE
W2.2 CL
RE:
DOOR
T
A3.21
A3.21
A3.21
5' - 2 1/2" V.I.F.
A3.21
/17 A3.21
T
FIRST FLR
100' - 0"
W3.2
EXTERIOR STOREFRONT
GLAZING:GL-A
FRAME:DARK BRONZE
W3.1 CL
RE:
DOOR
T
A3.21
A3.21
A3.21
5' - 4 1/8" V.I.F.
A3.21
/17 A3.21
T
FIRST FLR
100' - 0"
W3.1
EXTERIOR STOREFRONT
GLAZING:GL-A
FRAME:DARK BRONZE
W3.2 CL
RE:
DOOR
T
A3.21
A3.21
A3.21
5' - 2 1/2" V.I.F.
A3.21
/17 A3.21
T
S E
E S
C H
E D
SCHED.
SEE
D1
6" 6"
T
NOTE:
ALL DOOR
GRAPHICS/SIGNAGE
BY OWNER.
DOOR (RE: SCHEDULE
THIS SHEET)
THRESHOLD
EXISTING
BRICK PAVERS
M A
X
/2
M A
X
/4
EXISTING
EXPANSION JOINT
EXISTING
CONCRETE SLAB
EXISTING
BRICK PAVERS
EXISTING METAL STUD
FRAMING
EXISTING RIGID INSULATION
EXISTING ALUM SOFFIT
BACKER ROD & SEALANT
SHIM AS REQUIRED
ALUMINUM STOREFRONT
SYSTEM (RE: FRAMING
ELEVATIONS THIS SHEET)
BACKER ROD
& SEALANT
EXISTING PERIMETER
GYP BD SOFFIT &
FRAMING - PATCH &
REPAIR AS REQUIRED
FOR NEW
STOREFRONT SYSTEM
SPANDREL PANEL
ALUM STOREFRONT
SYSTEM (RE: FRAMING
ELEVATIONS THIS SHEET)
BACKER ROD & SEALANT
SHIM AS REQUIRED
BACKER ROD & SEALANT
EXISTING METAL STUD FRAMING
EXISTING ALUM CLOSURE
PANEL OVER GYP BD
EXISTING ALUM CLOSURE
PANEL OVER GYP BD
EXISTING ALUM STOREFRONT
/2
2"
M A
X
/2
M A
X
/4
DOOR (RE: SCHEDULE
THIS SHEET)
THRESHOLD
1/2" EXPANSION JOINT
CONCRETE SLAB
PER PLAN
EXISTING
CONCRETE
SLAB
2"
/2
BACKER ROD & SEALANT
DOOR (RE: SCHEDULE
THIS SHEET)
SHIM AS REQUIRED
PRE-FINISHED BRAKE
METAL CLOSURE PANEL TO
MATCH STOREFRONT
FINISH, OVER 1/2" EXTR
GRADE GYP BD ON 3 5/8"
METAL STUD FRAMING
EXISTING BRICK VENEER
EXISTING ALUM
CLOSURE PANEL OVER
WALL CONSTRUCTION
BACKER ROD & SEALANT
BACKER ROD & SEALANT
EXISTING BRICK VENEER
ALUMINUM STOREFRONT
SYSTEM (RE: FRAMING
ELEVATIONS THIS SHEET)
BACKER ROD & SEALANT
BACKER ROD
& SEALANT
EXISTING ALUM SOFFIT
PANEL & SUSPENSION
SYSTEM
EXISTING STEEL SHELF
ANGLE
EXISTING RIGID
INSULATION
EXISTING METAL
STUD FRAMING
SHIM AS REQUIRED
EXISTING ACOUSTICAL
CEILING SYSTEM -
PATCH & REPAIR AS
REQUIRED FOR NEW
STOREFRONT SYSTEM
SPANDREL PANEL
1/2"
V.I.F.
40.00°
/2 " 4
/2
2" 2"
ALUM STOREFRONT
BRAKE METAL, MATCH
STOREFRONT FINISH
WEATHER BARRIER
FRAMING BACKER ROD & SEALANT
BACKER ROD & SEALANTBRAKE METAL, MATCH
STOREFRONT FINISH
SHIM
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
FILE NO.
171/25046.CTS
/1
/2
:0 :3
P
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-S a g in a w
S tO ff ic e R e p la c e E n t_
V rs o v a W
T A
.r v t
W T
A
2025009
SEPT. 26, 2025
J.R.G.
JEROME T. HART
STATE OFFICE BUILDING
A3.21
SAGINAW, MI 48607
EXTERIOR ENTRANCE
REPLACEMENT FOR:
DOOR & FRAME
SCHEDULE, TYPES AND
DETAILS
DOOR SCHEDULE
DOOR
WIDTH HEIGHT THK.
DOOR PANEL DOOR FRAME DETAILS *=SIM. FIRE RATING
REMARKS
HW
SETNUMBER TYPE MAT. FINISH TYPE MAT. FINISH HEAD JAMB SILL LABEL MIN.
FIRST FLR
A1.1 (2) 3' - 0" 7' - 0" 1 3/4" D1 ALUM DB W1 ALUM DB SEE FRAME SEE FRAME SEE FRAME ADA PUSH BUTTON, CARD READER 1
C1.1 3' - 0" 7' - 0" 1 3/4" D1 ALUM DB W2.1 ALUM DB SEE FRAME SEE FRAME SEE FRAME ADA PUSH BUTTON, CARD READER 2
C1.2 3' - 0" 7' - 0" 1 3/4" D1 ALUM DB W2.2 ALUM DB SEE FRAME SEE FRAME SEE FRAME 3
C2.1 3' - 0" 7' - 0" 1 3/4" D1 ALUM DB W3.1 ALUM DB SEE FRAME SEE FRAME SEE FRAME 3
C2.2 3' - 0" 7' - 0" 1 3/4" D1 ALUM DB W3.2 ALUM DB SEE FRAME SEE FRAME SEE FRAME ADA PUSH BUTTON, CARD READER 2
1/4" = 1'-0"
DOOR TYPES
SCALE: 1 1/2" = 1'-0"A3.21
SILL DTL @ A111
SCALE: 1 1/2" = 1'-0"A3.21
HEAD DTL @ A112
SCALE: 1 1/2" = 1'-0"A3.21
JAMB DTL @ A113
SCALE: 1 1/2" = 1'-0"A3.21
SILL DTL @ C1 & C214
SCALE: 1 1/2" = 1'-0"A3.21
JAMB DTL @ C1 & C216
SCALE: 1 1/2" = 1'-0"A3.21
HEAD DTL @ C1 & C215
SCALE: 3" = 1'-0"A3.21
JAMB @ 40 DEG DETAIL17
NO. REVISION DATE
ISSUE FOR BIDS 09/26/25
A2 ADDENDUM NO. 2 10/15/25
A2
(3) JUNIPERUS HORIZONTALIS 'WILTONII'
(12) HELICTOTRICHON SEMPERVIRENS 'SAPPHIRE'
(1) ACER CAMPESTRE 'METRO GOLD'
(3) JUNIPERUS HORIZONTALIS 'WILTONII'EXISTING TURF
EXISTING TURF
EXISTING TURF
(2) JUNIPERUS HORIZONTALIS 'WILTONII'
(12) HELICTOTRICHON SEMPERVIRENS 'SAPPHIRE'
(1) ACER CAMPESTRE 'METRO GOLD'
(2) JUNIPERUS HORIZONTALIS 'WILTONII'
CONTROL JOINT (RE: 4/A2.33) EXISTING SALVAGED RE-INSTALLED BENCH,
PROVIDE BASE ANCHORS TO MATCH EXISTING
EXISTING SALVAGED RE-LOCATED BENCH,
PROVIDE BASE ANCHORS TO MATCH EXISTING
EXISTING RE-LOCATED TRASH
CAN & ASH TRAY RECEPTACLES
EXISTING RE-INSTALLED
BENCH
EXISTING RE-INSTALLED
TABLE
EXISTING RE-LOCATED TRASH
CAN & ASH TRAY RECEPTACLES
PROJECT WORK LIMITS
EXISTING CURB
TO REMAIN
NORTH AREA NORTH AREA
LANDSCAPE NOTES:
1. ALL TURF SPECIES SHALL BE HARDY IN CITY OF
SAGINAW, PER AMERICAN ASSOCIATION OF
NURSERYMAN.
2. ALL STONE MULCH SHALL MATCH EXISTING. REUSE
TO THE EXTENT FEASIBLE.
3. SEE IRRIGATION PLAN FOR SYSTEM EXTENT,
COMPONENTS, AND IMPLEMENTATION
REQUIREMENTS.
4. RESTORE TURF DAMAGED BY DEMOLITION AND
CONSTRUCTION WITH BLUEGRASS FESCUE BLEND
COMMONLY USED INT HE SAGINAW AREA.
LANDSCAPING LEGEND:
TURF
COMPOSTED LEAVES
18" THICK LAYER
STONE MULCH
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
FILE NO.
171/25046.CTS
/1
/2
:1 :0
P
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-S a g in a w
S tO ff ic e R e p la c e E n t_
V rs o v a W
T A
.r v t
W T
A
2025009
SEPT. 26, 2025
M.G.R.
JEROME T. HART
STATE OFFICE BUILDING
L1.03
SAGINAW, MI 48607
EXTERIOR ENTRANCE
REPLACEMENT FOR:
LANDSCAPE PLAN -
NORTH AREA
NORTH SCALE: 1" = 10'-0"
LANDSCAPE PLAN - NORTH AREA
NO. REVISION DATE
ISSUE FOR BIDS 09/26/25
A2 ADDENDUM NO. 2 10/15/25
| AD2 - DTMB-0414 (Construction Addendum) |
| 084113 - Aluminum Framed Entrances and Storefronts_AD2 |
| AD2 DWGS_2025009-SaginawStOfficeReplaceEnt_101525 |
| AD2_A1.00_2025009-SaginawStOfficeReplaceEnt_101525 |
| AD2_A2.01_2025009-SaginawStOfficeReplaceEnt_101525 |
| AD2_A2.32_2025009-SaginawStOfficeReplaceEnt_101525 |
| AD2_A2.33_2025009-SaginawStOfficeReplaceEnt_101525 |
| AD2_A3.21_2025009-SaginawStOfficeReplaceEnt_101525 |
| AD2_L1.03_2025009-SaginawStOfficeReplaceEnt_101525 |
File details come from the government source that posted it. Updated .