The document is a General Demolition Plan for the VA Medical Center in Buffalo, New York, detailing interior entry renovations for Building 1, E-Wing on the first floor. The plan includes a detailed floor plan and demolition key notes specifying removal of existing elements such as partitions, flooring, wall-mounted accessories, and repositioning of equipment like the "Evolv" Express Sensor Gate. The renovation focuses on the entry area, reception, and adjacent spaces, with careful preservation of existing structural elements like glass panels, chrome railing, and entry/exit points. The project drawing is dated 5/20/2025 and is marked as issued for internal review, with the work area clearly delineated on the floor plan and key demolition activities numbered and mapped out systematically.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 8.7.25 528-25-116 Addendum 02.pdf | ||
| 36C24225B0045 0004.docx | DOCX document | |
| 528-25-116 Pre-bid sign in sheet.pdf | ||
| 8.6.25 528-25-116 Bid Addendum 01.pdf | ||
| 36C24225B0045 0003.docx | DOCX document | |
| 36C24225B0045 0002.docx | DOCX document | |
| 36C24225B0045 0001.docx | DOCX document | |
| Combined Specs PDF.pdf | ||
| P07-WAGE RATE.pdf | ||
| 36C24225B0045_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
ELEVATORS
100C-5
111C
107C-8
101-2
107C-5
#1
115D
114D
CORRIDOR
117D
118D
E-14 113D
112D
121D
122D
#1
124D
111D 127D1
110D
109D
108D
133133D1
4D136137D138D139D
E-40
106D
104D
146-D
145-D
146D-1
100-D
125124123122
103-D
148D-1
149-D
0A
-3
1-
D 134-E
135E-1
8-
E
139-E
144-E
103-E
105-E 107-E
108-E109-E
111-E
114-E
116-E117-E
115-E
113-E
115-A114-A113-A112-A111-A
116-A117-A118-A
9-
A
1-
A
120-A
132-A 131-A
130-A
129-A133-A
128-A
127-A
126-A
125-A
124-A
134-A
135-A
136-A
137-A
138-A 123-A
#1
122-A
0A
-9
100A-8110-A1
108-A1
108-A 110-A
113E-1
107-ATRIAGE
#2
TRIAGE
#1
139-A
140-A
141-A
106-E
123-E
146-A
101-5
101-3
101-4
E-170
E-171
140B
E-180
101A-1
110-1
103-1
105-1
106-3
106-2
101-D
114113112
120-1
134 133
140141
139-C
138C-3
138C-2
138C
137C135C
134C
133C
132C
131C
130C
129C
128C
127C
126C
125C
124C 123C
122C
121C
120C
119C
0C
-3
118C116C114C113C
113C-1
100C-1107C
110C110C-1 112C
112C-1
111C-4
111C-9 111C-7
111C-5
111C-11
111C-1
111C-2
111C-6
107C-1
107C-2
107C-3
107C-4
107C-6
111C-3
111C-10
#1
107C-7
106C
105C
104C
103C
102C
101C
110-2
100C-4
E-316
117C-1
126D
127D 128D 129D 130D 131D 132D 132D3
132D2
CORRIDOR
104D-1 143-E
112-E 110-E
WAITING AREA
RECEPTION
103-A
106-A
100A-4
100A-5
104-A3
0A
-2
129 121
102-D
148A
100-C
100C-2 100C-6
0C
-4
138C1
114-B
101-1
#1
101A 102A
103A
104A
104A-1
104A-2
101B
101B-2 101B-1
102B
101B-3
135B134B133B132B
122B
120B
105B
103B
104B
109B
110B
106B
107B
111B
112B
113B 116B
117B
115B
119B
121B
123B
125B
127B 126B
130B
130B-1
130B-2
131B
136B
137B
138B
139B
141B
#1
DN DN
TEMPORARY LOCATION FOR
"Evolv" Express SENSOR GATE
RELOCATED BY VA ELECTRICAL
EXISTING GLASS
PANELS TO REMAIN
22 33
55555555
EXISTING GLASS
PANELS TO REMAIN
77 77
88 88
EXISTING
WAITING
ROOM
EXISTING
SECURITY
SCREENING
EXISTING CHROME
RAILING TO REMAIN
EXISTING
PHARMACY
WINDOWS
EXISTING
ENTRY/EXIT
M
IN
. TEMPORARY
CONSTRUCTION
BARRIER (TBD)
TEMPORARY
CONSTRUCTION
BARRIER (TBD)
EXISTING OPENING
TO REMAIN
EXISTING
GREETING
101010101111
DATE:
AD-100
BLDG. 1, 1ST FLR.,
E-WING INTERIOR
ENTRY RENOVATIONS
11 1ST FLOOR KEY PLAN
NTS
WORK AREA
NN
PROJECT NO.
BUILDING NUMBER: CHECKED: DRAWN:
LOCATION:
STATION NO. 528 VAMC BUFFALO, NEW YORK
MEDICAL CENTER DIRECTOR:
ASSOCIATE MEDICAL CENTER DIRECTOR:
DATE:
DATE:
CLINICAL ENGINEERING DATE
SAFETY OFFICER DATE:
INFECTION CONTROL
DATE
DATE
DATE
DATE
ENGINEERING MANAGER
CHIEF OF STAFF
CARELINE MANAGER
ARCHITECT / ENGINEER: A/E FIRM SEAL PROJECT TITLE:
GENERAL
DEMOLITION PLAN
DRAWING TITLE
VA
U.S. Department of Veterans Affairs
01 ZR/MP RAD
5/20/2025
N/A
22 FLOOR PLAN
1/4" = 1'-0" NN
ISSUED FOR INTERNAL REVIEW 5/20/25