About this file

This document is a Scope of Work for the Jefferson Elementary School demolition and removal project. The project encompasses the comprehensive demolition and removal of the school building and associated structures, including all foundations, slabs, and utilities. The scope includes removal of all playground equipment with footings, edging, and play surface materials; demolition of outbuildings in their entirety including slabs and foundations; removal of the existing sign; relocation of an existing memorial rock to 550 Maple Street; and sawcutting of concrete and asphalt at specified locations. Fencing work includes retaining existing fence at certain locations, adding chain and bollard posts at the entrance, and removing fence at other designated areas. The project also requires installation of temporary construction fencing and gates as needed during demolition operations.

Post-demolition restoration work requires all areas affected by demolition and removal operations to be restored to lawn condition, including screened topsoil application and hydroseeding. The contractor must maintain the hydroseeding until the second cutting of grass is established. Concrete and asphalt elements specified to remain at the completion of demolition operations must be preserved. The document does not contain information regarding pricing terms, contract duration, award dates, bidder meetings, response deadlines, or funding sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REMOVE ALL

PLAYGROUND

EQUIPMENT

INCLUDING

FOOTINGS, EDGING,

AND PLAY SURFACE

MATERIAL

REMOVE OUTBUILDINGS

IN THEIR ENTIREITY

INCLUDING

SLABS/FOUNDATIONS

REMOVE OUTBUILDINGS

IN THEIR ENTIREITY

INCLUDING

SLABS/FOUNDATIONS

REMOVE OUTBUILDINGS

IN THEIR ENTIREITY

INCLUDING

SLABS/FOUNDATIONS

REMOVE

EXISTING

SIGN

MOVE

EXISTING

MEMORIAL

ROCK TO

550 MAPLE

STREET

REMOVE BUILDINGS IN THEIR

ENTIREITY INCLUDING

SLABS/FOUNDATIONS/UTILITIES

JEFFERSON ELEMENTARY

BUILDING AND STRUCTURES

DEMOLITION AND REMOVAL

SAWCUT CONCRETE

AT INTERSECTION TO

SIDEWALK AT ALL

LOCATIONS

SAWCUT EXISTING

ASPHALT AT

COMPLETION OF

DEMOLITION

OPERATIONS

REMOVE

CONCRETE PADS,

PLAY EQUIPMENT,

AND FOOTINGS

CONCRETE AND

ASPHALT TO REMAIN

AT COMPLETION

JEFFERSON ELEMENTARY

ASPHALT, CONCRETE AND MISC

SITE REMOVALS

FENCE TO REMAIN -

ADD CHAIN AND

BOLLARD POSTS AT

ENTRANCE

EXISTING

FENCE TO

REMAIN

REMOVE

EXISTING

FENCE

REMOVE

EXISTING

FENCE

JEFFERSON ELEMENTARY

FENCING REMOVALS

TEMPORARY

CONSTRUCTION

FENCE (AND GATES AS

NEEDED)

JEFFERSON ELEMENTARY

POST DEMOLITION

RESTORATION

RESTORE ALL AREAS EFFECTED BY

DEMOLITION AND REMOVAL OPERATIONS TO

LAWN. INCLUDING SCREENED TOPSOIL AND

HYDROSEEDING. MAINTAIN HYDROSEEDING

UNTIL 2ND CUTTING OF GRASS ESTABLISHED