FormSF1449_and_Bid_Schedule__Amendment_1.pdf
PDF 295 KB Posted
- Attached to
- Drydock Repairs for NOAA ship Oscar Dyson
- Solicitation number
- AB-133M-13-RB-0009
About this file
Formf1499 and Bid Schedule Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| RefZip9.zip | ZIP file | |
| RefZip8.zip | ZIP file | |
| RefZip7.zip | ZIP file | |
| RefZip8.zip | ZIP file | |
| RefZip7.zip | ZIP file | |
| RefZip6.zip | ZIP file | |
| RefZip5.zip | ZIP file | |
| RefZip4.zip | ZIP file | |
| RefZip3.zip | ZIP file | |
| RefZip2.zip | ZIP file | |
| RefZip1.zip | ZIP file | |
| FormSF1449_and_Bid_Schedule.pdf | ||
| Other_Applicable_Provisions_and_Clauses_R5.pdf | ||
| STATEMENT_OF_WORK-Drydock_FY14_Dyson_8-2013_Rev_4.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ IFB RFP
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE AUG 28, 2013
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATE . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
EDWOSB
SMALL BUSINESS PROGRAM
NMAN7200-13-01207
AB-133M-13-RB-0009
LEVIS KNOX
LEVIS.D.KNOX@NOAA.GOV 206-526-4888
2:00 PM PT
AJ630031
WESTERN ACQUISITION DIVISION
CONTRACTS BRANCH
7600 SAND POINT WAY NE, WC3
SEATTLE WA 98115-6349
336611
AN794131
NOAA SHIP OSCAR DYSON, R224
SHIP, RCVG, BLDG 26 C ST
USCG BASE
KODIAK AK 99619
see continuation page for line item details.
See Schedule
SEP 17, 2013
Please
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
AB-133M-13-RB-0009
Attachment Page
PAGE 3 OF 9 AB-133M-13-RB-0009
BID SCHEDULE
The Contractor shall furnish all necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform dockside repair services required by the statement of Work/Specifications, Attachment 3, and shall perform those services in accordance with the following schedule of prices.
In order to be considered responsive, the bidder must bid on all items in the quantities stated in the schedule below.
Failure to enter an amount may result in bid rejection.
CLASS "A" ITEMS, BASIC WORK
TEMPORARY SERVICES AND UTILITIES
JB
ROUTINE DRYDOCKING AND FRESHWATER WASH-
DOWN
UNDERWATER BODY PRESERVATION
HULL FREEBOARD PRESERVATION
ANCHOR CHAIN RANGED AND PAINTED
CHAIN LOCKERS, CLEAN AND INSPECT
UNDERWATER BODY INSPECTION AND REPAIR
PAGE 4 OF 9 AB-133M-13-RB-0009
SCHEDULE Continued
Item No. Supplies/Services Quantity Unit Unit Price Amount
REPLACEMENT OF SEA CHEST CATHALCO COPPER
ANODES
REPLACEMENT OF BOW THRUSTOR CATHALCO
COPPER ANODES
BALLAST & WASTE WATER TANK INSPECTION AND
REPAIR
CENTERBOARD OVERHAUL
SCIENTIFIC SEAWATER SYSTEM LINE INSTALLATION
HULL VALVE REPAIR/REPLACEMENT/CLEANING
POTABLE WATER TANK INSPECTION AND REPAIR
WELD PORT AND STARBOARD PLIMSOLL MARKS AND
DECK LINES
SHAFT BEARINGS INSPECTION AND MAINTENANCE
ABS DRYDOCKING SURVEY
ABS SPECIAL PERIODICAL SURVEY – HULL 2 AND
UNDERWATER BODY AND INSPECTIONS AND REPAIRS
PAGE 5 OF 9 AB-133M-13-RB-0009
ABS SPECIAL PERIODICAL SURVEY – MACHINERY 2
ABS SPECIAL PERIODICAL SURVEY – TAIL SHAFT AND
MAIN PROPULSION SHAFTING AND PROPELLER
INSPECTION & REPAIRS
RENEWAL LOAD LINE SURVEY 2
ANNUAL LOAD LINE SURVEY 4
ANNUAL HULL SURVEY 4
ANNUAL MACHINERY SURVEY
PROVIDE TEMPORARY BERTHING/HOTEL
ACCOMODATIONS
Total Class "A" Items
CLASS "B" OPTIONAL ITEMS,
REPLACE POTABLE WATER TANK VENTS
RELOCATE STBD AFT CRANE BOOM STOWAGE
PEDESTAL TO STBD AFT TUNA TOWER
PAGE 6 OF 9 AB-133M-13-RB-0009
BILGE AND TANK CLEANING
GALLEY VENT SYSTEM CLEANING AND REPAIRS
CRANES, WINCHES, DAVITS, AND ANCHOR WINDLESS,
ANNUAL INSPECTION/MAINTENANCE
ADD 2.5 TONNES OF PERMANENT BALLAST
INSTALL GFE WIRE ON NETSONDE WIRE WINCH
TUNA TOWER MODIFICATIONS FOR SAFETY
STEERING GEAR
OILY WATER SYSTEM CALIBRATION AND INSPECTION
CENTERBOARD OVERHAUL, ES333 TRANSDUCER
INSTALL
PROVIDE ADDITIONAL TEMPORARY BERTHING/HOTEL
ACCOMODATIONS
DY
SWITCHBOARD PANEL INSPECTIONS AND
MAINTENANCE
PAGE 7 OF 9 AB-133M-13-RB-0009
CUTLER HAMMER MAIN BREAKERS, INSPECT
ZINC REPLACEMENTS
UTILITIES AND SERVICES, DAILY RATE
DA
PROVIDE DRYDOCK LAY DAYS
DA
SATELLITE ANTENNA SYSTEMS REMOVAL AND
INSTALLATIONS
ANNUAL FIRE EQUIPMENT INSPECTION AND
MAINTENANCE
ANNUAL LIFE RAFT INSPECTIONS AND REPAIRS
Total Class "B" Items
PAGE 8 OF 9 AB-133M-13-RB-0009
CLASS "C" ITEMS, ADDITIONAL ITEM
REQUIREMENTS (AIR)
Additional Work Requirements:
(See notes 1,2 and 3 below)
2,000 man hours multiplied by the labor rate of
$________ per man hour equals the estimated additional work requirements labor cost of
Material/Subcontractor markup rate of multiplied by $50,000 = estimated markup cost of
Total Additional Work Requirement Cost labor cost + markup cost + $50,000 =
LS
GROWTH TO RESTORE POTABLE WATER TANKS,
PRESERVE 100%
GROWTH TO CHAIN LOCKER, PRESERVE 100%
GROWTH TO BALLAST TANKS, PRESERVE 100%
PAGE 9 OF 9 AB-133M-13-RB-0009
Total Class "C" Items
TOTAL ALL ITEMS (CLASS A + CLASS B + CLASS C)
Schedule Notes:
Offeror(s) must submit pricing for every line item in the above schedule, and all travel costs shall be determined in accordance with the Federal Travel Regulation (www.gsa.gov/ftr). Failure to quote in this manner may result in proposal rejection.
Notes for item 0301:
1. The labor rate entered in the Schedule above shall be fully loaded billable rates, which include costs of overhead, G&A, fringe benefits, profit, insurance and so forth. This rate shall be used for the performance of Additional Item Requirements over the life of this contract regardless of the number of hours actually ordered.
2. The materials markup rate shall be used for the performance of Additional Item Requirements over the life of this contract regardless of the value of materials actually orderded.
3. The quantities listed in schedule for these items represent the Government's best estimate of the requirement for evaluation purposes. The numbers listed do not guarantee the contractor the total number of estimated hours or dollars indicated.
KEY:
DA = Day JB = Job LS = Lump Sum
File details come from the government source that posted it. Updated .