1. Sample Subcontract, AA-2024-03.pdf
PDF 248 KB Posted
- Attached to
- ATS/STA Magnets for ALS-U
- Solicitation number
- AA-2024-03
- Issued by
-
Department of Energy
About this file
This document is a sample subcontract (Subcontract No. TBD) between The Regents of the University of California, Lawrence Berkeley National Laboratory (University) and a Subcontractor for the fabrication and delivery of ATS/STA Magnets in support of the Advanced Light Source Upgrade project.
The subcontract specifies the ordered items, which include various dipole and quadrupole magnets, with associated delivery schedules and pricing. Acceptance of the items is based on successful completion of the acceptance criteria list. The subcontractor must comply with federal electrical device certification requirements and obtain a Notice to Proceed before commencing work. The fixed price subcontract includes payment terms, shipping requirements, reporting obligations, and approval of technical data. The subcontractor must also comply with the University's sustainability requirements for environmentally preferable products and services. The subcontract incorporates several referenced documents, including the Statement of Work, technical specifications, and drawing lists.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontract No. TBD Page 1
SUBCONTRACT
NO. TBD
The Regents of the University of California Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720
Subcontractor:
TBD
University Procurement Representative:
Name: Arielle Anoop Phone: (510) 486-5519 Fax: (510) 486-4380 E-Mail: AAnoop@lbl.gov
Introduction This is a fixed price subcontract (hereinafter "Subcontract") for ATS/STA Magnets in support of the Advanced Light Source Upgrade project, as further described herein.
This Subcontract is between The Regents of the University of California, (hereinafter "University") and the party identified above as the "Subcontractor".
This Subcontract is issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter "U.S. Government"), represented by the Department of Energy (hereinafter "DOE") for the management and operation of the Lawrence Berkeley National Laboratory (hereinafter "LBNL") and the performance of certain research and development work.
Agreement The parties agree to perform their respective obligations in accordance with the terms, conditions, and provisions of the attached SCHEDULE OF ARTICLES and the documents referenced or incorporated therein, which together with this Signature Page shall collectively constitute the entire Agreement and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.
TBD
THE REGENTS OF THE
UNIVERSITY OF CALIFORNIA
By:
By:
Name:
Name:
Title:
Title:
Date:
Date:
Subcontract No. TBD Page 2
SCHEDULE OF ARTICLES
ARTICLE 1 – ORDERED ITEMS
A. Description
The Subcontractor shall furnish and deliver the following ordered item(s), in accordance with this Subcontract:
Item
Name Description Qty Price Amount Delivery
Schedule:
1 TBENDJ-A dipole magnets AL-1437-1565 2 $TBD $TBD 2 TBENDJ-B dipole magnets AL-1437-1567 4 $TBD $TBD 3 TBENDK-A dipole magnets AL-1595-2412 2 $TBD $TBD 4 TQDJ-A quadrupole magnet AL-1437-1569 1 $TBD $TBD 5 TQDK-A quadrupole magnets AL-1437-1571 3 $TBD $TBD 6 TQDK-B quadrupole magnets AL-1437-1573 2 $TBD $TBD 7 TQDL-A quadrupole magnets AL-1437-1574 2 $TBD $TBD 8 TQDL-B quadrupole magnets AL-1437-1576 2 $TBD $TBD 9 TQDM-A quadrupole magnets AL-1437-1577 2 $TBD $TBD 10 TQFJ-A quadrupole magnets AL-1437-1572 2 $TBD $TBD 11 TQFJ-B quadrupole magnet AL-1583-7952 1 $TBD $TBD 12 TQFJ-C quadrupole magnet AL-1584-0842 1 $TBD $TBD 13 TQFK-A quadrupole magnets AL-1437-1575 2 $TBD $TBD 14 TBENDJ spare coil set One of each TBENDJ coil variant (2)
1 $TBD $TBD
15 TBENDK spare coil set One of each TBENDK coil variant (3)
1 $TBD $TBD
16 TQDJ-A spare coil set One of each TQDJ-A coil variant (4)
1 $TBD $TBD
17 TQFJ/TQDK spare coil set One of each TQFJ/TQKD coil variant (5)
1 $TBD $TBD
18 TQFK/TQDL spare coil set One of each TQFK/TQDL coil variant (6)
1 $TBD $TBD
19 TQDM-A spare coil set One of each TQDM-A coil variant (7)
1 $TBD $TBD
20 Closeout Checklist Per Appendix A, SOW 1 $TBD $TBD
2: AL-1528-8997 and AL-1550-0991 3: AL-1559-4102 and AL-1553-3451 4: AL-1599-8959, AL-1613-7509, AL-1613-7670, and AL-1613-7720 5: AL-1528-7717, AL-1545-7948, AL-1546-0384, and AL-1546-1265 6: AL-1551-1681, AL-1551-2245, AL-1551-2303, and AL-1551-2336 7: AL-1660-5727, AL-1595-2307, AL-1660-9790 and AL-1662-0012
*These numerical footnotes match the footnotes within Section 3.1 of the Statement of Work. (Page 8 & Page 9)
TOTAL $TBD
Subcontract No. TBD Page 3
The above delivery schedule identifies the date(s) by which the specified item(s) shall be delivered to the shipping address indicated in the article below entitled Shipping Requirements.
A. Acceptance B. Acceptance
Acceptance of the items described above is based upon successful completion of the acceptance criteria list (ACL) as referenced within Section 6.3 – Acceptance Criteria, of the Statement of Work (SOW) AL-1700-9211 Rev. B incorporated into this Subcontract.
C. Electrical Device Certification Requirement
All electrical equipment, components, conductors and other items delivered to the University, or to any subcontractor facility or remote work location, of the type requiring testing by a Nationally Recognized Testing Laboratory (NRTL) recognized by the Occupational Safety and Health Administration (OSHA) shall be NRTL listed, labeled, and certified in accordance with Part 1910, Occupational Safety and Health Standards, of Title 29 of the Code of Federal Regulations (29 CFR 1910). The Subcontractor shall notify the Technical Representative, TBD, in writing, of any item to be delivered that does not meet this requirement. The University reserves the right to refuse delivery of or return any such items. Information on required NRTL testing is available at https://www.osha.gov/nationally-recognized-testing-laboratory-program.
Notice to Proceed
The following documents shall be submitted to the University. Acceptable documents, as determined by the University, must be submitted and a Notice to Proceed must be issued before any work may commence, unless otherwise noted below.
1. Hold Point (HP) – The Subcontractor must not proceed beyond a hold point (HP) per the incorporated Statement of Work (SOW) AL-1700-9211 Rev. B, Section 4.5 – Hold Points, without a formal written Notice to Proceed (NTP).
ARTICLE 2 – PRICE AND PAYMENT
A. Fixed Price
The Subcontractor shall furnish and deliver the ordered item(s) for the total fixed price of $TBD.
B. Sales or Use Tax
Items purchased by the University hereunder are treated as for resale, per the University's California State Resale Permit No. SR-CH 21-835970 for LBNL, and shall not be subject to any California or other State sales or use tax if shipped to California. Any items furnished hereunder for rentals or leases are subject to California State sales or use tax, and such tax is included in the fixed prices/rates stated herein.
The University of California State Resale Permit No. SR-CH 21-835970 for LBNL is available at: http://procurement.lbl.gov/supplier-forms/.
https://www.osha.gov/nationally-recognized-testing-laboratory-program http://procurement.lbl.gov/supplier-forms/
Subcontract No. TBD Page 4
C. Invoices
1. The Subcontractor shall email invoice(s) directly to the LBNL Accounts Payable Office at APInvoice@lbl.gov, upon completion of a milestone/deliverable or within thirty days of the acceptance of the item(s). The "subject" line of the email shall state the Subcontractor's name and the Subcontract number. If final invoices are not submitted within 180 days of acceptance, then any amounts paid by the University to that point will represent satisfaction in full by LBNL under this Subcontract and an Accord and Satisfaction. This means that LBNL will not be obligated to make any further payments under this Subcontract.
To avoid delays in processing and payment, Subcontractors should include only one attachment per email. Multiple invoices should be combined and attached as a single portable document format (PDF) or Microsoft Word or rich text format (RTF) file (up to 30 individual invoices per attachment) or emailed separately (one attachment per email).
Do not include icons/pictures in the email (logos, etc.) and ensure only one subcontract number is listed on the invoice.
2. If unable to submit an invoice by email, the Subcontractor may submit the invoice to the following address:
Lawrence Berkeley National Laboratory Accounts Payable Office, Subcontract No. TBD One Cyclotron Road, M/S 971-AP Berkeley, CA 94720
3. Invoice(s) shall state: the Subcontract number; the Subcontractor (including business heading or logo); bill to address (same address as above); invoice date; unique invoice number; remittance address; sufficiently identify the items/services being invoiced; and identify any separately payable freight charges (with receipts if available) and taxes.
Invoice(s) in a spreadsheet format are not acceptable, but a spreadsheet can be used to support an invoice. The Subcontractor shall maintain records which support all invoiced amounts, and provide them to the University Procurement Representative upon request.
D. Payment Terms
All invoices except the final invoice shall be payable within 30 days of receipt; provided, however, that payments made thereafter shall not be subject to any penalty, interest, or late charges. Only those items/services identified in this Subcontract or a Subcontract Modification will be considered for payment. Payment amounts may be adjusted for any applicable credits, offsets, or withholds. Full payment shall not be due until any final acceptance requirements of this Subcontract have been satisfied. For inquiries about the status of an invoice, call (510) 486- 6954 or aphelp@lbl.gov.
ARTICLE 3 – SUBCONTRACT ADMINISTRATION
A. Notices, Requests, and Modifications The Subcontractor shall submit all notices and requests for approval by email to the University mailto:APInvoice@lbl.gov mailto:aphelp@lbl.gov
Subcontract No. TBD Page 5
Procurement Representative indicated on the signature page or at the following mail address:
Attn: Arielle Anoop One Cyclotron Road M/S 971-PROC
Only the University Procurement Representative is authorized to modify the terms, conditions, and requirements of this Subcontract, including any changes to the description of the work, and to issue any notices and approvals required by this Subcontract. Certain changes to this subcontract may be made only by the University Procurement Representative without subcontractor agreement or negotiation prior to the change. Such changes may include: changes of an administrative nature, directed changes pursuant to the clause incorporated herein entitled:
“CHANGES,” unilateral modifications authorized by clauses other than the Changes clause, and termination notices. Apart from the University Procurement Representative’s authority to issue unilateral changes, the parties may mutually agree to make changes in the work ordered, or modify any other term or condition of the subcontract, resulting in an amendment to the subcontract, but only by a written modification signed by the authorized representatives of both parties.
B. Technical Representative
TBD is the Technical Representative for this Subcontract. This individual is designated to monitor performance of the work and to interpret and clarify the technical requirements, but is not authorized to make changes to the work or to modify any of the terms and conditions of this Subcontract, including those related to the completion schedule or pricing.
(Technical Representative contact information shall be listed herein)
C. Closeout
The Subcontractor shall, as a condition of full payment, assist the University after the completion of the work in accomplishing the administrative closeout of this Subcontract, including, as necessary or required, the furnishing of documentation and reports, the disposition of property, the disclosure of any inventions, the execution of any required documents (including an Assignment and Release form if this form is an incorporated document), the performance of any audits, and the settlement of any interim or disallowed costs.
ARTICLE 4 – GOVERNMENT FURNISHED MATERIAL
The University will furnish the material as outlined within Section 2.1 – Government Furnished Material of the incorporated Statement of Work for use under the Subcontract. The Subcontractor is required to incorporate this material into the fabricated end product and return any unused materials with the delivery of the ordered items.
ARTICLE 5 – SHIPPING REQUIREMENTS
A. Shipping Terms
Subcontract No. TBD Page 6
The shipping terms are Delivered at Place Unloaded (DPU) (per Incoterms 2020) to the delivery address. All shipments shall be shipped via a U.S. flag air carrier or U.S. ocean vessel and a U.S.
licensed common carrier selected by the Subcontractor, at the University's expense.
OR
A. Shipping Terms The shipping terms are FOB Destination, freight prepaid and add. All shipments shall be shipped via a licensed common carrier selected by the Subcontractor, at the University's expense.
B. Shipping Address All shipments shall be shipped to the following address:
Lawrence Berkeley National Laboratory For the U.S. Department of Energy One Cyclotron Road, Building 69
C. Shipping Point The shipping point is: ___________ (City, State or Foreign country).
D. Customs Clearance To facilitate customs clearance, 48 hours prior to vessel departure Subcontractor shall email or fax interfreight copies of the following documents to Aeronet Worldwide (broker identified below) and the University Procurement Representative (identified in the Subcontract):
• Bill of Lading
• Commercial Invoice
• Packing List
Aeronet Worldwide 1755 Rollins Road Burlingame, CA 94010 Phone: (650) 259-2155 Fax: (650) 259-2150 Email: SFOimport@aeronet.com
ARTICLE 6 – REPORTS
A. Type of Reports The Subcontractor shall prepare and submit the reports as referenced in Section 4.2 – Reporting / Communication Requirements of the Statement of Work (SOW) AL-1700-9211 Rev. B, included in this subcontract to the University:
B. Submittal
Subcontract No. TBD Page 7
Reports shall be separately submitted to the following recipients at the following email or mailing address:
Attention: [Intended Recipient; see below] One Cyclotron Rd., Mail Stop [see below]
Recipient Email Technical Representative TBD@lbl.gov Arielle Anoop AAnoop@lbl.gov
ARTICLE 7 – APPROVAL OF TECHNICAL DATA
If this Subcontract requires the Subcontractor to furnish any drawings, specifications, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance or test data, or other technical data for approval by the University prior to Subcontractor performance, the approval of the data by the University shall not relieve the Subcontractor from responsibility for any errors or omissions in such data or from responsibility for complying with the requirements of this Subcontract, except as specified below. Any work done prior to such approval shall be at the Subcontractor's risk.
Unless otherwise specified, the University requires a period of 10 working days from date of receipt to review and approve the data. If the University does not approve the data within the allotted time period, the parties will establish a new time period for review and approval of the data and, if necessary, the delivery schedule or completion date will be equitably adjusted.
If the data includes any variations from the Subcontract requirements, the Subcontractor shall describe such variations in writing at the time of submission of the data. If the University approves any such variation(s), a change order to the Subcontract shall be issued by the University and, if appropriate, a bilateral modification to the Subcontract shall be negotiated.
ARTICLE 8 – PRELIMINARY INSPECTION
The University reserves the right to observe and witness all phases of the manufacturing of the items, including design, fabrication, assembly, testing, and inspection, conducted at the Subcontractor's facility or at any of its sub-tier subcontractors' facilities.
Preliminary in-process and source inspections may be performed at the Subcontractor's facility or at any of its sub-tier subcontractors' facilities. The inspection shall allow the University to verify that the Subcontractor has met the requirements of this Subcontract. Prior to University inspection, the Subcontractor shall perform a complete inspection and document the results. The Subcontractor shall present this documentation to the University at the time of the preliminary inspection. Such preliminary inspection does not waive the right of the University to inspect and accept or reject at the destination.
The University reserves the right to subcontract with a qualified third party to conduct on its behalf any or all of the University inspections.
Subcontract No. TBD Page 8
ARTICLE 9 - ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES
The Laboratory is subject to several interacting initiatives and federal and DOE requirements related to sustainability, including waste reduction, Recycled Content Products (EPA Designated Products), Biobased (BioPreferred®), energy efficient products (EnergyStar®), environmentally preferable and energy efficient electronics (EPEAT® and Federal Energy Management Program (FEMP) Designated Products), Non-Ozone Depleting Alternative Products (SNAP) and Water Efficient Plumbing Products (EPA Watersense®). The Laboratory also implements State of California requirements on packaging and electronic waste recycling.
The subcontractor must deliver products and services in compliance with this article which implements the requirements of DOE’s Sustainable Acquisition Program, as well as other federal- and state-mandated sustainability requirements.
In the performance of this Subcontract, the Subcontractor must specify, furnish, and use environmentally preferable products and services (i.e., products and services with a lesser or reduced effect on human health and the environment), to the maximum possible extent consistent with the Subcontract requirements herein, the General Provisions, and the intended end use of the products or services. The Laboratory generally considers the requirements practicable unless a specific program exception applies.
Refer to SFTool.gov/Vendor Resources for links to sustainability resources and information on environmental programs the Laboratory and its suppliers/subcontractors are required to comply with, including exceptions.
DOE Order 436.1.A. In addition to the above programs, DOE Order 436.1.A requires:
The subcontractor must maximize, to the extent feasible, the procurement of materials and operations with lower embodied emissions and alternatives to ozone-depleting substances and high global warming potential hydrofluorocarbons.
The subcontractor must minimize, to the extent feasible, the supply of products and services determined by the EPA to be contaminants of emerging concern (CEC), including pharmaceuticals and personal care products and CECs found therein. The subcontractor shall provide Safer Choice labeled products under this subcontract, as applicable. The subcontractor is encouraged to visit https://www.epa.gov/saferchoice for updated lists of qualifying products.
The subcontractor must minimize the supply of products with toxic and hazardous characteristics, and minimize the generation of toxic and hazardous waste, to the maximum extent practicable.
E-Waste Recycling Requirements. All recyclers of electronic equipment must be e-Steward certified by the Basel Action Network (BAN).
For any equipment removed by the subcontractor and scheduled to be refurbished or recycled, the subcontractor must attest that those actions will be handled by a refurbisher or recycler that is third-party certified to one of the known electronics recycling certification programs that is used in the United States, the Responsible Recycling Standard (R2) or the E-Stewards Standard.
Information on environmentally preferable products and services is also available at:
https://www.epa.gov/contracts/greening-government-procurement. State of California sustainable https://sftool.gov/learn/about/652/vendor-resources#sftoolpages https://www.epa.gov/saferchoice https://www.epa.gov/contracts/greening-government-procurement
Subcontract No. TBD Page 9 procurement information can be found at: https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html
Questions regarding these sustainable acquisition requirements may be directed to the Laboratory Sustainable Procurement Representative (Business-Assurance-Sustainable@lbl.gov).
ARTICLE 10 – INCORPORATED DOCUMENTS
The following documents are hereby incorporated as a part of this Subcontract. The order of precedence for each document must be as specified in the Entire Agreement and Order of Precedence clause in the General Provisions. Any other documents not incorporated herein by specific reference are excluded from this Subcontract. The documents marked with an asterisk are available at http://procurement.lbl.gov/supplier-forms/.
• AL-1700-9211 Rev. B Statement of Work for the ALS-U ATS/STA Transfer Line Magnets
• AL-1704-5147 Rev. A, Technical Specification for the ALS-U STA/ATS Dipole Magnets
• AL1704-5148 Rev. B, Technical Specification for the ALS-U STA/ATS Quadrupole Magnets
• AL-1704-0625 Rev. A, Drawing List for the ATS/STA Dipole Magnets
• AL-1704-0849 Rev. A, Drawing List for the ATS/STA Quadrupole Magnets
• 10068 Rev. B, Paint Specification
ARTICLE 11 – GENERAL PROVISIONS
The following General Provisions are incorporated by reference into this Subcontract and are available at: http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/.
A. General Provisions for Commercial Supplies & Services, dated 12/22/23
OR
General Provisions for Commercial Supplies & Services (Foreign), dated 12/22/23.
B. The clauses listed in the referenced General Provisions shall be applicable to this Subcontract, based on the value of the Subcontract, the status of the Subcontractor, or the nature and location of the Services, as indicated in the General Provisions.
(END OF SCHEDULE OF ARTICLES)
https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html mailto:Business-Assurance-Sustainable@lbl.gov http://procurement.lbl.gov/supplier-forms/ http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/
| ARTICLE 4 – GOVERNMENT FURNISHED MATERIAL |
| ARTICLE 9 - ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES |
File details come from the government source that posted it. Updated .