This document is a comprehensive set of engineering and construction drawings for the Oklahoma City Solid Waste Operations Center Improvements project (Project No. SW-0234-1), prepared by Smith Roberts Baldischwiler, LLC. The project involves multiple improvements across several buildings and site areas, including ADA ramp installations, backstep replacements, perimeter fence replacement, parking lot resurfacing and restriping, concrete paving repairs, building interior remodeling, and roof repairs at 11501 N Portland Ave. Key improvements include installing new aluminum ramps and stairs, replacing 1,640 linear feet of chain-link security fence, resurfacing front and back parking lots with 142 main parking spaces and 7 accessible spaces, and performing various building renovations across Buildings A through G.
The project is estimated to require unclassified excavation of 705 cubic yards, aggregate base of 10 cubic yards, processing existing base and surface over 4,230 square yards, and includes asphalt and concrete paving with specific material specifications. The total site area is approximately 0.90 acres, with an estimated disturbance area of 1.80 acres. The project will require a Storm Water Pollution Prevention Plan (SWPPP) to comply with Oklahoma Pollution Discharge Elimination System (OPDES) regulations, with specific erosion control measures including silt fencing, straw waddles, and maintenance requirements. The project is scheduled for completion in 2025, with detailed civil, architectural, mechanical, electrical, and plumbing improvements across multiple site structures.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Business Relationship Affidavit.pdf | ||
| SW-0234-1 Solid Waste Ops Center - Specifications and Standard Provisions Book-Signed.pdf | ||
| Anti Noncollusion Affidavit.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
mary.greyson Snapshot mary.greyson Text Box
SW-0234-1
1/
/2
1:
P
M B
R A
N D
O N
.E V
E R
H A
R T
Z :\1
- S
W -0
S O
LI
D
W A
S
TE
O P
E R
A
TI
O N
S C
E N
TE
R
IM
P
R O
V E
M E
N
TS
\T A
S K
-E
N G
IN
E
E R
IN
G
\D R
A W
IN
G
S \1
4- G
E N
E R
A L
N O
TE
S
.D W
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
1. ALL CONSTRUCTION PERFORMED AND MATERIALS SUPPLIED SHALL CONFORM TO THE PLANS AND/OR PROJECT SPECIFICATIONS. ANY WORK NOT COVERED, IN THE PLANS OR SPECIFICATIONS SHALL CONFORM TO THE OKLAHOMA CITY "STANDARD SPECIFICATIONS FOR THE CONSTRUCTION OF PUBLIC
IMPROVEMENTS" AND/OR DETAILS.
2. CONTRACTOR SHALL NOTIFY ENGINEER OR ENGINEER'S DESIGNEE FOR ANY DISCREPANCIES BETWEEN
DESIGN INFORMATION AND CITY OF OKLAHOMA CITY STANDARD REQUIREMENTS PRIOR TO
CONSTRUCTION.
3. AT CONTRACTORS CONVENIENCE, CONTRACTOR MAY REQUEST SUBSTITUTION OF ALTERNATE
METHODS OF CONSTRUCTION FROM THAT CALLED FOR, SUBJECT TO APPROVAL BY THE ENGINEER. THE CONTRACTOR SHALL THEN BE PAID THE LESSOR OF THE SUM OF THE ASSOCIATED BID ITEMS FOR THE
RESPECTIVE METHODS.
4. ALL OTHER ITEMS NOT SPECIFICALLY IDENTIFIED IN THE SUMMARY OF PAY ITEMS BUT NECESSARY FOR THE WORKING COMPLETION OF THIS PROJECT SHALL BE INCIDENTAL TO OTHER ITEMS OF WORK. NO
ADDITIONAL PAYMENT SHALL BE CLAIMED OR APPROVED.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING STRUCTURES, FENCES, AND
LANDSCAPING NOT SHOWN TO BE REMOVED AND SHALL BE RESPONSIBLE FOR THE COST OF ANY
REPAIRS TO THESE ITEMS UPON COMPLETION OF CONSTRUCTION.
6. UNDERGROUND UTILITIES DEPICTED IN DRAWINGS HAVE BEEN DEVELOPED FROM FIELD INFORMATION AND AS BUILT DRAWINGS. THE CITY OR ENGINEER ARE NOT RESPONSIBLE FOR THEIR ACCURACY.
PRIOR TO COMMENCING ANY CONSTRUCTION OR DIGGING OPERATIONS WITHIN THE AREA OF THESE DRAWINGS, A FIELD VERIFICATION AND PHYSICAL EXAMINATION OF THE LIMITS SHALL BE MADE BY
THE CONTRACTOR. THE CONTRACTOR SHALL ASSUME THAT ADDITIONAL UNDERGROUND LINES DO
EXIST AND ARE NOT SHOWN ON THESE DRAWINGS. THE LOCATIONS, BOTH HORIZONTAL AND
VERTICAL, SHOWN ON THESE DRAWINGS ARE ONLY APPROXIMATE.
7. SUBMITTALS AND PERMITS
A. ALL MATERIAL SPECIFIED IN THE PLANS MUST BE SUBMITTED FOR APPROVAL PRIOR TO
PLACEMENT. SUCH SUBMITTALS SHALL INDICATE THE INSTALLATION LOCATIONS OF THE
PROPOSED MATERIAL AND SHALL INCLUDE SUFFICIENT MANUFACTURER'S INFORMATION TO
DETERMINE WHETHER THE MATERIAL IS IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
B. THE ENGINEER SHALL APPLY AND OBTAIN THE BUILDING PERMIT PRIOR TO BIDDING, HOWEVER THE CONTRACTOR SHALL PAY THE PERMIT FEES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING ANY OTHER PERMITS REQUIRED BY THE CITY.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPROVED PLANS AND WORK
ORDERS REQUIRED BY THE CITY.
D. A NOTICE OF INTENT (NOI) SHOULD BE SUBMITTED 30 DAYS PRIOR TO THE INITIAL DISTURBANCE
OF SOILS.
E. THE CONTRACTOR MUST SUBMIT AN OSHA TRENCH AND EXCAVATION PLAN SIGNED AND SEALED
BY A LICENSED P.E. IN THE STATE OF OKLAHOMA.
F. SEE SPECIAL PROVISIONS IN THE SPECIFICATION BOOK FOR ADDITIONAL SUBMITTAL
REQUIREMENTS.
G. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING AND SUBMITTING PRE-CONSTRUCTION
AND POST-CONSTRUCTION DVD'S OF THE PROJECT EXTENTS.
8. SURVEY REQUIREMENTS
A. CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION STAKING. STAKING MUST BE
DONE BY A REGISTERED PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF OKLAHOMA
WHICH WILL BE VERIFIED AT PRE-WORK CONFERENCE.
B. CONTRACTOR SHALL FURNISH A DRAWING FILE OF (GPS) AS BUILT SURVEY, WITH LINE WORK
REPRESENTING ALL ABOVE GROUND IMPROVEMENTS, WITH FIELD NOTES, INCLUDING ALL
BELOW GROUND IMPROVEMENTS, AND QUANTITIES TO THE ENGINEER UPON COMPLETION OF
THE PROJECT.
9. GRADING
A. CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING ALL DISTURBED AREAS TO DRAIN AS GOOD
OR BETTER THAN EXISTING CONDITIONS.
B. THE COST FOR REMOVAL OF ANY TREES SHALL BE CONSIDERED INCIDENTAL AND INCLUDED IN
THE UNIT PRICE BID FOR OTHER ITEMS.
10. EROSION
A. A COPY OF THE EROSION CONTROL SITE PLAN MUST BE ON SITE AT ALL TIMES AND MADE
AVAILABLE TO INSPECTOR UPON REQUEST.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS & REPLACEMENT OF ALL EROSION CONTROL
MEASURES DAMAGED DURING CONSTRUCTION.
C. LIST EROSION CONTROL QUANTITIES AND WHO WILL BE RESPONSIBLE FOR THE INSTALLATION
AND MAINTENANCE OF THE EROSION CONTROL.
D. BLOCK OFF ACCESS OR ADD CONSTRUCTION ENTRANCE.
E. SOLID SLAB SODDING TO INCLUDE SUPPLY AND INSTALLATION OF SOLID SLAB SOD, FERTILIZER, HAND RAKING, WATERING AND ROLLING.
F. SOLID SLAB SODDING SHALL BE BERMUDA OR FESCUE.
G. PLACE SOD IN A POSITION PERPENDICULAR TO ALL SLOPES. STAKE IN PLACE AS NEEDED.
H. PROVIDE A SMOOTH TRANSITION BETWEEN SOD AND EXISTING TURF AREAS.
I. ROLL SODDED AREAS TWICE WITH WATER FILLED HAND ROLLER, NOT EXCEEDING 250 LBS. EACH
ROLLING PERPENDICULAR TO EACH OTHER.
J. WATER SUFFICIENTLY TO MOISTEN GRASS AND SOIL. DO NOT OVER-WATER, CAUSING EROSION.
REPAIR DAMAGED OR ERODED AREA AS SPECIFIED.
K. FERTILIZE WITH 10-20-10 IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AT A RATE OF
6 LBS. PER 1,000 SQUARE FEET. LIGHTLY WATER TO DISSIPATION OF FERTILIZER.
L. MAINTAIN SOD FOR 45 DAYS IF PLACED DURING GROWING SEASON OR UNTIL THE FOLLOWING
GROWING SEASON IF PLACED DURING DORMANT SEASON. MAINTENANCE SHALL INCLUDE
MOWING AND WATERING OF INSTALLED SOD. CONTRACTOR TO NOTIFY PROPERTY OWNER AT
END OF MAINTENANCE PERIOD.
M. CONTRACTOR SHALL CONSTRUCT SILT FENCES OR OTHER PHYSICAL BARRIERS AS NECESSARY
AROUND DISTURBED AREAS TO CONTROL EROSION, OFF-SITE SILTATION, AND COMPLY WITH
APPLICABLE ENVIRONMENTAL LAWS AND REGULATIONS.
11. AGGREGATE
A. TYPE "A" AGGREGATE BACKFILL SHALL BE PLACED IN ALL DITCHES UP TO GROUND LEVEL WHERE LINES CROSS UNDER PROPOSED OR EXISTING PAVING. TYPE "A" AGGREGATE BACKFILL SHALL BE
COMPACTED IN ACCORDANCE WITH THE CITY OF OKLAHOMA CITY STANDARD SPECIFICATIONS.
THE MAXIMUM PAY QUANTITY REQUIRED TO FILL A NEAT MINIMUM WIDTH DITCH, LISTED IN
THE TRENCH WIDTH DETAIL, FROM THE FLOWLINE OF THE PIPE TO THE PAVEMENT SUBGRADE
ELEVATION TO 5' BACK OF CURB ON EACH SIDE OF THE STREET. ANY ADDITIONAL TYPE "A"
AGGREGATE REQUIREMENTS ARE CONSIDERED INCIDENTAL.
B. ODOT TYPE A AGGREGATE WILL NOT BE PAID DIRECTLY, COST SHALL BE INCLUDED IN OTHER
ITEMS. THE SEWER MAIN AT DRIVEWAY AND PAVEMENT CUT REPAIR LOCATIONS SHALL BE
BACKFILLED WITH ODOT TYPE A AGGREGATE.
12. SIGNING & STRIPING
A. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO
THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION. ALL PAVEMENT
STRIPING SHALL BE FOUR (4) INCHES WIDE, UNLESS SHOWN OTHERWISE ON THE PLANS.
13. FINAL CLEANUP
A. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ALL LANDSCAPING IN AS GOOD OR BETTER
CONDITION AS EXISTING LANDSCAPING.
GENERAL CONSTRUCTION NOTES:
G1 Project #:SW-0234-1
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
G
EN
ER
A
L N
O
TE
S
SW-0234-1 SUMMARY OF PAY ITEMS
ITEM
NO.
SPEC.
NO. ITEM UNIT ESTIMATED
QUANTITY AS-BUILT
1 200 UNCLASSIFIED EXCAVATION 1 C.Y. 705.00
2 225 AGGREGATE BASE 2,3 C.Y. 10.00
3 226 PROCESSING EXISTING BASE AND SURFACE, METHOD B (12-IN DEPTH) 1 S.Y. 4,230.00
4 307 TACK COAT GAL. 320.00
5 311 SUPERPAVE, TYPE S3 (3.75-IN) TON 880.00
6 311 SUPERPAVE, TYPE S5 (2.25-IN) TON 530.00
7 314 PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE) 3 S.Y. 42.00
8 729 ADA PARKING SIGN 4 EA. 7.00
9 734 TRAFFIC STRIPE (PAINT) (4-IN WIDE) (WHITE) L.F. 2,590.00
10 734 TRAFFIC STRIPE (PAINT) (ADA PARKING SYMBOL) EA. 5.00
11 735 TRAFFIC STRIPE (THERMOPLASTIC) (4-IN WIDE) (WHITE) L.F. 530.00
12 735 TRAFFIC STRIPE (THERMOPLASTIC) (ADA PARKING SYMBOL) EA. 2.00
13 801 GPS "AS-BUILT" SURVEY L.S. 1.00
14 801 COLOR AUDIO/VIDEO RECORDING, PRE & POST CONSTRUCTION L.S. 1.00
15 809 MOBILIZATION L.S. 1.00
16 812 REMOVE SIDEWALK (CONCRETE) S.Y. 25.00
17 812 REMOVE CHAIN LINK SECURITY FENCE L.F. 1,640.00
18 820 SAWCUT PAVEMENT (CONCRETE) L.F. 109.00
19 823 CONCRETE SIDEWALK (4-IN) S.Y. 11.00
20 823 CONCRETE SIDEWALK (6-IN) S.Y. 14.00
21 823 PRECAST CONCRETE WHEEL STOPS EA. 7.00
22 828 STANDARD CHAIN LINK SECURITY FENCE 5 L.F. 1,640.00
23 840 SOLID SLAB SODDING 6 S.Y. 100.00
24 900 SEDIMENT AND EROSION CONTROL L.S. 1.00
25 982 HANDRAIL L.F. 37.00
26 SPEC TRAILER STEPS AND RAMP (FRONT AND BACK) L.S. 1.00
27 SPEC DEMOLITION & REMODELING OF KITCHEN & BATHROOM (BUILDING A) L.S. 1.00
28 SPEC ROOF REPLACEMENT (BUILDING A) 7 L.S. 1.00
29 SPEC LIGHTWEIGHT INSULATING CONCRETE ROOF DECK REPAIR (BUILDING A & D) 8 S.F. 2,760.00
30 SPEC VAPOR BARRIER (BUILDING A) 9 L.S. 1.00
31 SPEC CANOPY (BUILDING B) L.S. 1.00
32 SPEC DEMOLITION & REMODELING OF KITCHEN & BATHROOM (BUILDING B) L.S. 1.00
33 SPEC TORNADO SHELTER (BUILDING C) L.S. 1.00
34 SPEC ROOF REPLACEMENT (BUILDING D) L.S. 1.00
35 SPEC VAPOR BARRIER (BUILDING D) 9 L.S. 1.00
36 SPEC CANOPY (BUILDING E) L.S. 1.00
37 SPEC DOWNSPOUT REPLACEMENT (BUILDINGS E & F) L.S. 1.00
38 SPEC SITE LIGHTING L.S. 1.00
39 SPEC EXTERIOR DOORS L.S. 1.00
PAY ITEM NOTES:
1. AFTER PROCESSING EXISTING BASE AND SURFACE (METHOD B) AND COMPACTING TO A 12-INCH DEPTH, THE TOP 6-INCHES OF THE PROCESSED EXISTING BASE/SURFACE IS TO BE
EXCAVATED, REMOVED, AND DISPOSED OF BY THE CONTRACTOR ACCORDING TO OKC SPECIFICATION SECTION 200. PAY ITEM INCLUDES ANY OTHER NECESSARY EARTHWORK.
2. QUANTITY TO BE USED FOR AGGREGATE BACKFILL AT THE EXISTING GAS LINE UTILITY LOCATION OR AS DIRECTED BY THE ENGINEER.
3. PAY ITEM INCLUDES BASE REPAIR AND ANY REQUIRED TRAFFIC CONTROL AND/OR WORK ZONE PERMIT. SEE OKC DETAIL D-800A.
4. PAY ITEM INCLUDES REMOVAL OF EXISTING SIGN, NEW SIGN POST, AND COMPLETE INSTALLATION OF A NEW AMERICANS WITH DISABILITIES ACT (ADA) PARKING STALL SIGN.
5. PAY ITEM INCLUDES AT LEAST ONE CHAIN LINK SECURITY GATE. ACCESS CONTROL ONTO GATE TO BE INSTALLED BY OTHERS.
6. QUANTITY TO BE USED AT DISTURBED AREAS OR AS DIRECTED BY THE ENGINEER.
7. PAY ITEM INCLUDES GUTTER REPLACEMENT FOR BUILDING A.
8. THIS PAY ITEM TO BE USED AS NEEDED AND AS APPROVED BY THE ENGINEER FOR PATCHING OR REPLACING DAMAGED EXISTING INSULATING CONCRETE DECK TOPPING ROOF SECTION ON BUILDING A OR D. CONTRACTOR TO MATCH THE EXISTING THICKNESS OF THE EXISTING INSULATING CONCRETE DECK TOPPING.
9. THIS PAY ITEM TO BE USED AS NEEDED AND AS APPROVED BY THE ENGINEER. IF VAPOR BARRIER IS REQUIRED, IT WILL BE INSTALLED FOR THE ENTIRE AREA OF ROOF
REPLACEMENT.
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
VD
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
AVD
Project #: SW-0234-1The
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
3/
/2
9:
A
M B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
SI
TE
.D
W G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
O F
TH
E
C
IT
YOF
OK
L A H O M A
Y
IT
C
ADMIN BUILDING
(BUILDING "A")
CREW BUILDING
(BUILDING "B")
TR
AI
LE
R
(B
LD
G.
"G
IMPROVEMENTS 002, 008, 009, & 010
IMPROVEMENTS 001, 008, 009, & 012
IMPROVEMENT 003
IMPROVEMENT 007
PORTLAND AVENUE
IMPROVEMENT 004 & 016
Scale: 1"=40'
SITE PLAN1
IMPROVEMENT 007
FLEET MAINTENANCE SHOP
(BUILDING "D")
WEST PARKING BAY
(BUILDING "E")
SO
U
TH
P
AR
KI
N G
BA
Y
(B U
IL
DI
N G
"F
IMPROVEMENT 006
IMPROVEMENT 015
IMPROVEMENT 011
IMPROVEMENT 014
IMPROVEMENT 013
TORNADO SHELTER
(BUILDING "C")
G4 Project #:SW-0234-1
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
SI
TE
P
LA
N
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
FRONT PARKING LOT
BACK PARKING LOT
IMPROVEMENT 005 & 006
INDEX OF SHEETS
IMPROVEMENT
# DESCRIPTION LOCATION SHEET NUMBERS
CIVIL ARCH. MECH. ELEC. PLUMB.
001 CONCRETE ADA RAMP ADMIN BUILDING (BUILDING "A") C1 - - - -
002 BACKSTEP REPLACEMENT CREW BUILDING (BUILDING "B") C2 - - - -
003 RAMP AND STAIRS REPLACEMENT
(FRONT AND BACK) TRAILER (BUILDING "G") C3-C4 - - - -
004 PERIMETER FENCE REPLACEMENT FACILITY PERIMETER C5 - - - -
005 PARKING LOT RESURFACING FRONT PARKING LOT C6 - - - -
006 PARKING LOT RESTRIPING FRONT AND BACK PARKING LOTS C6 - - - -
007 CONCRETE PAVING REPAIRS DRIVEWAY AND NEAR SOUTH PARKING BAY
(BUILDING "F")
C7 - - - -
008 RESTROOM AND KITCHEN REMODELS ADMIN BUILDING (BUILDING "A")
CREW BUILDING (BUILDING "B")
- A2-A21 M0.1-M4.1 E0.1-E2.1 P0.1-P3.1
009 DOOR REPLACEMENTS ADMIN BUILDING (BUILDING "A")
CREW BUILDING (BUILDING "B") -
A5, A7-A9, A14-A16, A21, A29-A30
010 CANOPY ADDITION CREW BUILDING (BUILDING "B") - A16, A27 - - -
011 TORNADO SHELTER TORNADO SHELTER (BUILDING "C") - A1, A6 - - -
012 ROOF REPLACEMENT - BUILDING "A" ADMIN BUILDING (BUILDING "A") - A22 - - -
013 ROOF REPLACEMENT - BUILDING "D" FLEET MAINTENANCE SHOP (BUILDING "D") - A23-A24 - - -
014 GUTTER REPLACEMENTS WEST PARKING BAY (BUILDING "E")
SOUTH PARKING BAY (BUILDING "F")
- A25-A26 - - -
015 CANOPY ADDITION WEST PARKING BAY (BUILDING "E") - A28 - - -
016 SITE LIGHTING IMPROVEMENTS FACILITY - - - ES1.1 -
DYH
DYH
EXISTING FIRE HYDRANT
EXISTING FIRE HYDRANT
DYH
EXISTING FIRE HYDRANT
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
0.90 ACRES
EROSION AND SEDIMENT CONTROLSSITE DESCRIPTION
X
X
X
X X
LAT: 35°35'11" N / LONG: 97°25'11" W
11501 N PORTLAND AVE (CITY OF OKC SOLID WASTE OPERATIONS CENTER)
ADA IMPROVEMENTS (RAMP & STAIRS), PERIMETER FENCE
REPLACEMENT, PARKING LOT RESURFACING & RESTRIPING, TORNADO SHELTER INSTALLATION,
PAVEMENT REPAIRS, BUILDING INTERIOR REMODELING, AND ROOF REPAIRS.
1. INSTALL EROSION CONTROL MEASURES
2. EXCAVATE AREA FOR PROPOSED IMPROVEMENTS.
3. CONSTRUCT IMPROVEMENTS.
4. BACKFILL AREA FOR PROPOSED IMPROVEMENTS.
5. SODDING, SPRIGGING AND/OR SEEDING.
6. REMOVE EROSION CONTROL MEASURES, CLEAN SITE & DRESS UP.
3/
/2
:1
PM B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
ER
OS
IO
N.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
E1 Project #: SW-0234
DATE:
DRAWN BY:
CHECKED BY:
3/13/25
WWG
RCS
PROJECT LIMITS:
PROJECT DESCRIPTION:
IF YES, LIST IMPAIRMENT:
SOIL STABILIZATION PRACTICES:
STRUCTURAL PRACTICES:
SUGGESTED SEQUENCE OF EROSION CONTROL ACTIVITIES:
ESTIMATED AREA TO BE DISTURBED:
OFFSITE AREA TO BE DISTURBED:
(FOR CONTRACTOR USE)
NOTE:
THIS SHEET SHOULD BE USED IN CONJUNCTION WITH A DRAINAGE MAP
THAT ILLUSTRATES THE DRAINAGE PATTERNS/PATHWAYS AND RECEIVING WATERS
FOR THIS PROJECT. THIS SHEET SHOULD ALSO BE USED WITH THE EROSION
CONTROL SUMMARIES, PAY ITEMS, & NOTES.
SOIL TYPE:
LATITUDE & LONGITUDE
OF CENTER OF PROJECT:
LOCATED IN A TMDL: YES NO
YES NOLAKE THUNDERBIRD TMDL:
YES NOMS4 ENTITY:
IF YES, LOCATION
SENSITIVE WATERS OR WATERSHEDS: YES NO
YES NO303 (d) IMPAIRED WATERS:
NAME OF RECEIVING WATERS:
TOTAL IMPERVIOUS AREA
POST-CONSTRUCTION:
TOTAL IMPERVIOUS AREA
PRE-CONSTRUCTION:
PROJECT WILL DISCHARGE TO:
TOTAL AREA OF THE
CONSTRUCTION SITE:
POST-CONSTRUCTION RUNOFF
COEFFICIENT OF THE SITE:
A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS REQUIRED TO COMPLY WITH THE OKLAHOMA POLLUTION DISCHARGE ELIMINATION SYSTEM (OPDES) REGULATIONS. THIS PLAN IS INITIATED DURING THE DESIGN PHASE, CONFIRMED IN THE PRE-WORK MEETINGS AND AVAILABLE ON THE JOB SITE ALONG WITH COPIES OF THE NOTICE OF INTENT (NOI) FORM AND PERMIT CERTIFICATE THAT HAVE BEEN FILED WITH THE OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY (ODEQ). THE PLAN MUST BE KEPT CURRENT WITH UP-TO-DATE AMENDMENTS DURING THE PROGRESSION OF THE PROJECT. ALL CONTRACTOR OFF-SITE OPERATIONS ASSOCIATED WITH THE PROJECT MUST BE DOCUMENTED IN THE SWPPP, I.E., BORROW PITS, WORK ROADS, DISPOSAL SITES, ASPHALT/CONCRETE PLANTS, ETC. THE BASIC GOAL OF STORM WATER MANAGEMENT IS TO IMPROVE WATER QUALITY BY REDUCING POLLUTANTS IN STORM WATER DISCHARGES. RUNOFF FROM CONSTRUCTION SITES HAS A POTENTIAL FOR POLLUTION DUE TO EXPOSED SOILS AND THE PRESENCE OF HAZARDOUS MATERIALS USED IN THE CONSTRUCTION PROCESS. THE PREVENTION OF SOIL EROSION, CONTAINMENT OF HAZARDOUS MATERIALS AND/OR THE INTERCEPTION OF THESE POLLUTANTS BEFORE LEAVING THE CONSTRUCTION SITE ARE THE BEST PRACTICES FOR
CONTROLLING STORM WATER POLLUTION.
PROPER MANAGEMENT AND DISPOSAL OF HAZARDOUS WASTE MATERIALS IS REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING MANUFACTURER'S RECOMMENDATIONS, STATE AND FEDERAL REGULATIONS TO ENSURE CORRECT HANDLING, DISPOSAL, SPILL PREVENTION AND CLEANUP MEASURES. EXAMPLES INCLUDE BUT ARE NOT LIMITED TO: PAINTS, ACIDS, CLEANING SOLVENTS, CHEMICAL ADDITIVES, CONCRETE CURING
COMPOUNDS AND CONTAMINATED SOILS.
PROPER MANAGEMENT AND DISPOSAL OF CONSTRUCTION WASTE MATERIAL IS REQUIRED BY THE CONTRACTOR.
MATERIALS INCLUDE STOCKPILES, SURPLUS, DEBRIS AND ALL OTHER BY-PRODUCTS FROM THE CONSTRUCTION PROCESS. PRACTICES INCLUDE DISPOSAL, PROPER MATERIALS HANDLING, SPILL PREVENTION AND CLEANUP MEASURES. CONTROLS AND PRACTICES SHALL MEET THE REQUIREMENTS OF ALL FEDERAL, STATE AND LOCAL
AGENCIES.
103.05 104.10 104.12 104.13 106.08 107.01 107.20
IN ADDITION:
THE FOLLOWING SECTIONS OF THE 2019 ODOT STANDARD SPECIFICATIONS
SHOULD BE NOTED:
GENERAL NOTES:
HAZARDOUS MATERIALS:
WASTE MATERIALS:
THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE
FOLLOWING:
MAINTENANCE AND INSPECTION:
ALL EROSION AND SEDIMENT CONTROLS WILL BE MAINTAINED IN GOOD WORKING ORDER FROM THE BEGINNING OF CONSTRUCTION UNTIL AN ACCEPTABLE VEGETATIVE COVER IS ESTABLISHED. INSPECTION BY THE CONTRACTOR AND ANY NECESSARY REPAIRS SHALL BE PERFORMED ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCH AS RECORDED BY A NON-FREEZING RAIN GAUGE TO BE LOCATED ON SITE. POTENTIALLY ERODIBLE AREAS, DRAINAGE WAYS, MATERIAL STORAGE, STRUCTURAL DEVICES, CONSTRUCTION ENTRANCES AND EXITS ALONG WITH EROSION AND SEDIMENT CONTROL LOCATIONS ARE
EXAMPLES OF SITES THAT NEED TO BE INSPECTED.
"ODEQ GENERAL PERMIT (OKR10) FOR STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITIES WITHIN THE
STATE OF OKLAHOMA." ODEQ, WATER QUALITY DIVISION, OCTOBER 18, 2022.
ADDITIONAL PERMITS REQUIRED FROM OKLAHOMA WATER RESOURCES BOARD AND / OR MUNICIPALITY FOR USE
OF SURFACE, GROUND OR CITY WATER SOURCES FOR ACTIVITIES SUCH AS WATERING.
BONDING REQUIREMENTS
FINAL CLEANING UP
CONTRACTOR'S RESPONSIBILITY FOR WORK
ENVIRONMENTAL PROTECTION
STORAGE AND HANDLING OF MATERIAL
LAWS, RULES AND REGULATIONS TO BE OBSERVED
STORM WATER MANAGEMENT
MANAGEMENT OF EROSION, SEDIMENTATION, AND STORM WATER POLLUTION PREVENTION
TEMPORARY SEDIMENT CONTROL
EROSION AND SEDIMENT CONTROLSSITE DESCRIPTION
STORMWATER POLLUTION PREVENTION PLAN
OFFSITE VEHICLE TRACKING:
NOTES:
STABILIZED CONSTRUCTION EXIT
TEMPORARY SILT FENCE
TEMPORARY SILT DIKES
TEMPORARY FIBER LOGS
DIVERSION, INTERCEPTOR OR PERIMETER DIKES
DIVERSION, INTERCEPTOR OR PERIMETER SWALES
ROCK FILTER DAMS
TEMPORARY SLOPE DRAIN
PAVED DITCH W/ DITCH LINER PROTECTION
TEMPORARY DIVERSION CHANNELS
TEMPORARY SEDIMENT BASINS
TEMPORARY SEDIMENT TRAPS
TEMPORARY SEDIMENT FILTERS
TEMPORARY SEDIMENT REMOVAL
RIP RAP
INLET PROTECTION
TEMPORARY BRUSH SEDIMENT BARRIERS
SANDBAG BERMS
TEMPORARY STREAM CROSSINGS
FLEXAMAT /ARTICULATED CONCRETE BLOCK
COMPOST FILTER SOCKS
EROSION CONTROL MATS AND BLANKETS
HAUL ROADS DAMPENED FOR DUST CONTROL
LOADED HAUL TRUCKS TO BE COVERED WITH TARPAULIN
EXCESS DIRT ON ROAD REMOVED DAILY
TEMPORARY SEEDING
PERMANENT SODDING, SPRIGGING OR SEEDING
VEGETATIVE MULCHING
SOIL RETENTION BLANKET
PRESERVATION OF EXISTING VEGETATION
HYDROMULCH / HYDROSEED
NOTE: TEMPORARY EROSION CONTROL METHODS MUST BE USED ON ALL DISTURBED AREAS WHERE CONSTRUCTION ACTIVITIES HAVE CEASED FOR OVER 14 DAYS. METHODS USED WILL BE AS SHOWN
ON PLANS, OR AS DIRECTED BY THE ENGINEER.
CITY OF OKLAHOMA CITY
DO, MERCURY
HEFNER LAKE
RENTHIN-URBAN LAND
X
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
ST
O
R M
W A
TE
R
P O
LL
U
TI
O
N P
R
EV
EN
TI
O N
P
LA
N
1.80 ACRES
0.89 ACRES
0.90 ACRES
0.88
X
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
X
X
X
X
SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF SF
SF SF
SF
SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
CONST. 388.00 LF
SILT FENCE
CONST. 31.00 LF
SILT FENCE
CONST. 185.00 LF
SILT FENCE
CONST. 418.00 LF
SILT FENCE
X
X X
CONST. 30.00 LF
STRAW WADDLE
CONST. 27.00 LF
STRAW WADDLE
CONST. 82.00 LF
STRAW WADDLE
CONST. 84.00 LF
STRAW WADDLE
CONST. 38.00 LF
STRAW WADDLE
CONST. 185.00 LF
SILT FENCE
CONST. 26.00 LF
SILT FENCE
NOTE: CONCRETE PANEL REPLACEMENT ONLY. CONTRACTOR TO
ATTEMPT TO REUSE & NOT DISTURB EXISTING AGGREGATE BASE.
CONST. 582.00 LF
SILT FENCE
SUGGESTED CONCRETE
WASHOUT AREA
(INCIDENTAL)
117511801185
CONST. 572.00 LF
SILT FENCE
NOTE: PREFABRICATED METAL STAIR AND RAMP
REPLACEMENT. NO LAND DISTURBANCE.
3/
/2
:1
PM B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
ER
OS
IO
N.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
ADMIN BUILDING
(BUILDING "A")
CREW BUILDING
(BUILDING "B")
TR
AI
LE
R
(B
LD
G.
"G
PORTLAND AVENUE
Scale: 1"=40'
SITE PLAN1
FLEET MAINTENANCE SHOP
(BUILDING "D")
WEST PARKING BAY
(BUILDING "E")
SO
U
TH
P
AR
KI
N G
BA
Y
(B U
IL
DI
N G
"F
E2
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
ER
O
SI
O
N C
O N
TR
O
L
PL
A N
DRAWN BY: WWG
CHECKED BY: RCS
DATE: 3/13/25
FRONT PARKING LOT
BACK PARKING LOT
LEGEND
SILT FENCESF SF
X X STRAW WADDLE
NOTE: TRIANGULAR SILT DIKES AND/OR
ROCK BAG SILT FENCES ARE ACCEPTABLE
ALTERNATIVES TO STRAW WADDLES.
TORNADO SHELTER
(BUILDING "C")
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
/2
1:
P
M B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
AD
M
IN
B
LD
G.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
ADMINISTRATION BUILDING
(BUILDING "A")
ADMINISTRATION BUILDING
(BUILDING "A")
21.08'
6.50'
ADMINISTRATION BUILDING
(BUILDING "A")
14.58' 6.50'
21.08'
ELEV. 1191.60
ELEV. 1190.50
1:13
6.
PROVIDE ADDITIONAL TOP SOIL (INCIDENTAL)
AND SOD TO LEVEL AREA FLUSH WITH RAMP
AND GRADE TO DRAIN
Scale: 1"=2'
RAMP PLAN1
Scale: 1"=2'
RAMP SECTION2
14.58'
1.
3.
2.
6" P.C. CONCRETE SIDEWALK
6" P.C. CONCRETE SIDEWALK
TOP OF EX. CONCRETE SIDEWALK
MATCH EXISTING
SIDEWALK ELEVATION
1.
2" SAND
COMPACTED SUBGRADE
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
C O
N C
R
ET
E A
D A
R A
M P
IM
PR
O
VE
M
EN
T N
O . 0
C1 Project #: SW-0234
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
MATCH EXISTING
THRESHOLD ELEVATION
EXPANSION JOINT & SEALANT
REMOVE & REPLACE CONCRETE SIDEWALK - 14 SY
EXPANSION JOINT & SEALANT
MAX. SLOPE 1:50
(ALL DIRECTIONS)
SLOPE 1:13
LANDING
SLOPE 1:13
1.00'
MIN.
3.
HA
N
DR
AI
L
HE
IG
HT
HANDRAIL - 22 LF
4"
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
Project #: SW-0234Project #: SW-0234-1The
3/
/2
9:
A
M B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
CR
EW
B
LD
G.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
P
IR
E S J
U N
E
SE
AL
O F
TH
E
C
IT
YOF
OK
L A H O M A
Y
IT
C
10.00'
8.
3.
S
ID
EW
A
LK
0.
EXISTING CONCRETE WALL
PROPOSED HANDRAIL (TYP.)
CREW BUILDING
(BUILDING "B")
STEP
PROPOSED HANDRAIL
8.00'
18"
7"
CREW BUILDING
(BUILDING "B")
PROPOSED CANOPY
(SEE ARCH. SHEETS
FOR DETAILS)
4"
Scale: 1"=2'
STAIRS PLAN1 Scale: 1"=2'
STAIRS SECTION2
7"
3.50'3.00'3.50'
PROPOSED AWNING COLUMN (TYP.)
(SEE ARCH. SHEETS FOR DETAILS)
4" P.C. CONCRETE SIDEWALK
2" SAND
COMPACTED SUBGRADE
8"
4" P.C. CONCRETE SIDEWALK
2" SAND
COMPACTED SUBGRADE
Scale: 1"=1'
STAIRS SECTION3
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
B A
C K
ST
EP
R
EP
LA
C
EM
EN
T I
M
PR
O
VE
M
EN
T N
O . 0
C2 Project #: SW-0234
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
MATCH EXISTING ELEVATION
EXISTING CONCRETE SIDEWALK
MATCH EXISTING
THRESHOLD ELEVATION
MATCH EXISTING
ELEVATION
HA
N
DR
AI
L
HE
IG
HT
PROPOSED HANDRAIL
HANDRAIL - 15 LF
REMOVE & REPLACE CONCRETE SIDEWALK - 11 SY
TOP OF EX. CONCRETE SIDEWALK
STAIR NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND PROPER DISPOSAL OF EXISTING HANDRAILS AND CONCRETE STAIRS AND LANDINGS.
2. CONCRETE SLOPES OF FINISHED BACKSTEP REPLACEMENT NOT TO EXCEED 1:50 IN ANY DIRECTION.
3. EXTENDING CONCRETE DEPTH TO MATCH EXISTING HARDSCAPE DEPTHS AND/OR ANY ADDITIONAL CONCRETE SIDEWALK NECESSARY TO COMPLIANTLY
CONNECT TO EXISTING PEDESTRIAN HARDSCAPES TO BE CONSIDERED INCIDENTAL.
EXPANSION JOINT & SEALANT
TOP OF EX. ROCK LANDSCAPING / BRICK PAVERS
MATCH EX. HARDSCAPE THICKNESS OR 4" MIN. DEPTH
LANDING
(REMOVE & REPLACE AS NECCESSARY)
(INCIDENTAL)
EXPANSION JOINT & SEALANT
LANDING
45°
D D/
D
D/
~21"
(VERIFY)
~1.75'
CONTRACTOR
TO FIELD VERIFY
& TIE TO EX. S/W
~1 .7
5'
FI
EL
D
VE
RI
FY
MATCH EXISTING ELEVATION (TYP.)
45°
18"
N.T.S.
HANDRAIL BASE PLATE DETAIL4
1-1/2" O.D. MIN. SCH. 40
STEEL HANDRAIL POST
3/16TYP.
1/2" DIA. X 8"
HEADED STUD
(PARALLEL TO
POST)
1/2" PLATE
1/4
1/2" DIA. X 8"
HEADED STUD
1/2" PLATE
STEEL HANDRAIL POST
4"
MIN.
1-1/2"1-1/4"
(TYP.)
PLAN
ELEVATION
MIN.
HA
N
DR
AI
L
HE
IG
HT
3.00' MIN.
MANEUVERING
CLEARANCE
5.
' M
IN
M
AN
EU
VE
RI
N
G
CL
EA
RA
N
CE
4"
4"
MATCH EX. CONCRETE THICKNESS OR 4" MIN. DEPTH
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
/2
:0
AM B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
TR
AI
LE
R.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
ALUMINUM RAMP ACCESS AS SUPPLIED BY
NEXT DAY ACCESS OR APPROVED EQUAL
Scale: 1"=2'
FRONT RAMP & STAIRS PLAN1
5.00'
4.
9.
5.00'
5.
1.
3.
(C O
N
TR
AC
TO
R
TO
V
ER
IF
Y)
MAX. SLOPE 1:12
MAX. SLOPE 1:12
15.00'
23.50'
LANDING
Scale: 1"=2'
FRONT RAMP & STAIRS NORTH ELEVATION2
ALUMINUM RAMP ACCESS AS SUPPLIED BY
NEXT DAY ACCESS OR APPROVED EQUAL
ALUMINUM STAIR ACCESS AS SUPPLIED BY
NEXT DAY ACCESS OR APPROVED EQUAL
ALUMINUM STAIR ACCESS AS SUPPLIED BY
NEXT DAY ACCESS OR APPROVED EQUAL
TRAILER (BUILDING "G")
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
R A
M P
A N
D S
TA
IR
S R
EP
LA
C
EM
EN
T
(F R
O N
T) I
M
PR
O
VE
M
EN
T N
O . 0
C3 Project #: SW-0234
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
0.
(T
YP
MATCH EXISTING
THRESHOLD ELEVATION
HANDRAILS
PREPARE SUBGRADE & PROVIDE FOOTINGS PER
MANUFACTURER RECOMMENDATIONS (TYP.)
0.53' (TYP.)
NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL AND PROPER DISPOSAL OF EXISTING RAMP AND STAIRS (FRONT & BACK).
2. PROPOSED RAMPS, STAIRS, LANDINGS, AND HANDRAILS SHALL BE ADA-COMPLIANT, OPEN-WEAVE ALUMINUM STRUCTURES AS SUPPLIED
BY NEXT DAY ACCESS OR APPROVED EQUAL.
MATCH EXISTING
THRESHOLD ELEVATION
MATCH EXISTING
ASPHALT ELEVATION
MAX. SLOPE 1:50
(ALL DIRECTIONS)
LANDING
MAX. SLOPE 1:50
(ALL DIRECTIONS)
3.
HA
N
DR
AI
L
HE
IG
HT
1.00' (TYP.)
1.00'
(TYP.)
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
/2
:0
AM B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
TR
AI
LE
R.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
Scale: 1"=2'
BACK STAIRS PLAN1
ALUMINUM STAIR ACCESS AS SUPPLIED BY
NEXT DAY ACCESS OR APPROVED EQUAL
TRAILER (BUILDING "G")
4.00'
5.
' 6.
LANDING
Scale: 1"=2'
BACK STAIRS SOUTH ELEVATION2
2.
(C O
N
TR
AC
TO
R
TO
V
ER
IF
Y)
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
R A
M P
A N
D S
TA
IR
S R
EP
LA
C
EM
EN
T
(B A
C K
I
M
PR
O
VE
M
EN
T N
O . 0
C4 Project #: SW-0234
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
HANDRAILS
ALUMINUM STAIR ACCESS AS SUPPLIED BY
NEXT DAY ACCESS OR APPROVED EQUAL
MATCH EX.
THRESHOLD
ELEVATION
PREPARE SUBGRADE & PROVIDE FOOTINGS PER
MANUFACTURER RECOMMENDATIONS (TYP.)
NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL AND PROPER DISPOSAL OF EXISTING RAMP AND STAIRS (FRONT & BACK).
2. PROPOSED RAMPS, STAIRS, LANDINGS, AND HANDRAILS SHALL BE ADA-COMPLIANT, OPEN-WEAVE ALUMINUM STRUCTURES AS SUPPLIED
BY NEXT DAY ACCESS OR APPROVED EQUAL.
0.92' (TYP.)
0.51' (TYP.)
MATCH EX.
THRESHOLD
ELEVATION
MATCH EX.
ELEVATION
MAX. SLOPE 1:50
(ALL DIRECTIONS)
3.
HA
N
DR
AI
L
HE
IG
HT
1.00'
1.00'
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
X X X X
X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X
X
X
/5
/2
9:
A
M B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
FE
NC
IN
G.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
P
IR
E S J
U N
E
SE
AL
O F
TH
E
C
IT
YOF
OK
L A H O M A
Y
IT
C
REMOVE AND REPLACE
1,507 LF 6' CHAINLINK FENCE
WITH 3-STRAND BARBED WIRE
Scale: 1"=50'
FENCING PLAN1
REMOVE AND REPLACE
133 LF 6' CHAINLINK FENCE WITH
3-STRAND BARBED WIRE
ADMINISTRATION BUILDING
(BUILDING "A")
CREW BUILDING
(BUILDING "B")
FLEET MAINTENANCE SHOP
(BUILDING "D")
WEST PARKING BAY
(BUILDING "E")
SO
U
TH
P
AR
KI
N G
BA
Y
(B U
IL
DI
N G
"F
TR
AI
LE
R
(B U
IL
DI
N G
"G
TORNADO
SHELTER
(BUILDING "C")
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PE
R
IM
ET
ER
F
EN
C
E R
EP
LA
C
EM
EN
T
I M
PR
O
VE
M
EN
T
N O
. 0
C5 Project #: SW-0234-1
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 3/24/25
3 STRANDS 4 PT.
BARBED WIRE WITH
12 12 GA. WIRES -
BARBS AT 5"
SPACES (MAX.)
PRESSED STEEL OR MALLEABLE
IRON EXTENSION ARMS AT 45°
OUTWARD (TYP.)
1 5/8" O.D. GALV.
TOP RAIL
8' -0
M
AX
1/
2" 6'
-0
12"
10'-0" C/C MAX
END POST
(OR CORNER)
LINE POST TYPICAL POST EMBEDMENT
NOTE: FENCE SHOWN
STRAIGHT FOR CLARITY
3000 PSI CONCRETE
3' 6"
1 5/8" O.D. GALV. BOTTOM RAIL
@ 1" ABOVE GROUND
FABRIC TO POSTS 15"
O.C.
11 GAUGE (MIN.) GALV. FABRIC
BANDS - 14" C/C, ON POST 24" C/C
TOP RAIL
9 GAUGE STEEL CHAIN LINK
FABRIC 2" MESH 72" WIDE
1 5/8" O.D. GALV.
PIPE BRACE
3/8" GALV. TRUSS ROD
WITH ADJUSTABLE
TRUSS TIGHTNER
TOP RAIL
SLEEVE
6" MIN. LENGTH
3/16" X 3/4" (MIN) FLAT GALV.
STEEL STRETCHER BAR
2 3/8" O.D. LINE
POST
6" 3'
0"
FINISH GRADE:
GRADE SMOOTHLY BEFORE
CONSTRUCTION OF FENCE, SET
FENCE ACCURATELY TO GRADE.
6" 3'
0"
N.T.S.
CHAINLINK FENCE DETAIL2
NOTE: TIE TO EXISTING CORNER
STRUCTURES & GATE ENTRANCE
REMOVE AND REPLACE
1 EA 6' CHAINLINK GATE WITH
3-STRAND BARBED WIRE
(INCIDENTAL TO FENCE)
PORTLAND AVENUE
FRONT PARKING LOT
ACCESS CONTROL TO BE
INSTALLED BY OTHERS
GATE FRAME
2" O.D. STD
PIPE
DOUBLE SWING LEAF GATE
5'-0" OPENING BETWEEN POSTS
(LEAF TO SWING 180 DEG E.W.)
3' 6"
N.T.S.
CHAINLINK GATE DETAIL3
NOTE: TIE TO EXISTING GATE
CERTIFICATE OF SURVEY
Date of Last Field Visit: April 30, 2024
I, Justin Smith, Professional Land Surveyor, certify that this project was completed under my direct responsible charge from an actual survey made under my supervision; that this ground survey was performed at the 95 percent confidence level to meet Federal Geographic Data Committee Standards; that this survey was performed to meet the Oklahoma Minimum Standards for the Practice of Land Surveying and the Specifications of Topographic and Planimetric Mapping contained in the Oklahoma Minimum Standards for the Practice of Land Surveying as adopted by the Oklahoma State Board of Licensure for Professional Engineers and Land Surveyors. The original data was obtained on April 30, 2024; that the survey was completed on May 6, 2024; that contours shown as “Obscured Areas” may not meet the stated standard; and all coordinates are based on Oklahoma State Plane North Zone NAD83 (NSRS 2007) and all elevations are based on North American Vertical Datum of 1988 (NAVD
88) Geoid 03 Model.
LEGAL DESCRIPTION
NE/4, NE/4, SE/4, Section 23, Township 13 North, Range 4 West, Indian Meridian, Oklahoma County, State of Oklahoma, containing Ten (10) acres, more or less.
Justin Smith, Professional Land Surveyor No. 1868
Date of Plat or Map: 5/6/2024 Date of Signature: 5/9/2024
GENERAL NOTES:
1. The bearing of South 00°38'45” East as shown on the east line of the subject property as established using the Oklahoma State Plane Coordinate System North Zone NAD83 (NSRS 2007) was used as the basis of bearing for this survey.
2. A title commitment, indicating applicable easements, has not been provided, therefore all easements may not be shown hereon.
3. Said described property is located within an area having a Zone Designation “X” by the Federal Emergency Management Agency (FEMA), on Flood Insurance Rate Map No. 40109C0155H, with a date of identification of 12/18/2009, for Community No. 5378, in Oklahoma County, State of Oklahoma, which is the current Flood Insurance Rate Map for the community in which said premises is situated.
4. UTILITY STATEMENT: The underground utilities shown have been located from field survey information and existing drawings. The Surveyor makes no guarantee that the underground utilities shown comprise all such utilities in the area, either in service or abandoned. The Surveyor further does not warrant that the underground utilities shown are in the exact location indicated although he does certify that they are located as accurately as possible from information available. The Surveyor has not physically located the underground utilities.
N
4 W
/5
/2
:0
AM B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
PA
RK
IN
G.
DW
G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
10 SPACES 22 SPACES
4 SPACES
4 SPACES
13 SPACES13 SPACES4 SPACES
4 SPACES 13 SPACES 13 SPACES
41 SPACES
8'
TYP.
5'
TYP.
11'
TYP.
TY
P.
INSTALL PRECAST CONCRETE WHEEL STOP (TYP.)
INSTALL ADA PARKING SIGN (TYP.)
PROCESSING EXISTING BASE AND SURFACE, METHOD B (12" DEPTH) - 4230 SY
UNCLASSIFIED EXCAVATION - 705 CY
SUPERPAVE, TYPE S3 (3.75") - 880 TONS
SUPERPAVE, TYPE S5 (2.25") - 530 TONS
TACK COAT - 320 GAL
STALL & ACCESSIBLE PARKING SPACES
SEE DETAIL THIS SHEET
MAIN PARKING SPACE COUNT:
142 SPACES
5 ACCESSIBLE SPACES
(PAINT STRIPING)
BACK PARKING SPACE COUNT:
23 SPACES
2 ACCESSIBLE SPACES
(THERMOPLASTIC STRIPING)
Scale: 1"=20'
PARKING LOT RESURFACING AND RESTRIPING PLAN1
Scale: 1"=5'
PARKING STALL DETAIL3
PORTLAND AVENUE
ADMINISTRATION BUILDING
(BUILDING "A")
CREW BUILDING
(BUILDING "B")
10 SPACES13 SPACES
Scale: 1"=1'
PAVEMENT SECTION DETAIL2
SUPERPAVE, TYPE S5 (2.25 IN)
SUPERPAVE, TYPE S3 (3.75 IN)
PROCESSING EXISTING BASE AND
SURFACE, METHOD B (6 IN DEPTH)
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
PA
R
K
IN
G L
O T
R
ES
U R
FA
C
IN
G
R
ES
TR
IP
IN
G I
M
PR
O
VE
M
EN
T N
O . 0
C6 Project #: SW-0234
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
EX. CURB
EX. CURB
TRAFFIC STRIPE (PAINT) (4" WIDE) (WHITE) - 2590 LF
TRAFFIC STRIPE (PAINT) (ADA PARKING SYMBOL) - 5 EA
4" SOLID WHITE
GORE STRIPES
@ 4' C/C (TYP.)
4" SOLID
WHITE
STRIPES
(TYP.)
TACK COAT
TRAFFIC STRIPE (THERMOPLASTIC) (4" WIDE) (WHITE) - 530 LF
TRAFFIC STRIPE (THERMOPLASTIC) (ADA PARKING SYMBOL) - 2 EA
4-1/2"6"
6'-0"
9"
5" 6"
1/4"
2"
3"
1/4"
2"
1-3/4"
SEAL 1/2" DEEP
HOLE W/ MORTAR
#6 @ 2'-6" LONG
(2) #3 REBARS
PLAN
SECTION
3'-0" TO EDGE OF
PARKING STALL
CL OF PARKING STALL
WHEEL STOP
PAINTED STRIPES IF SHOWN
ON THE DRAWINGS OR REQ'D
BY THE SPECIFICATIONS
ISOMETRIC
SYMBOLS TO BE WHITE ON
BLUE BACKGROUND PER
MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES
(MUTCD).
R=4"
10" 8"
16" 8"
3'-9"
3' -1
0"
22"
22"
10"
2"
R=16"
PARKING
HANDICAP
1'-6"
4"
1"
3' -0
" 1'-6" CONC. BASE
(3000 PSI)
FINISH GRADE2 1/2" DIA.
GAL. METAL
SIGN POST
7' -0
AL
L
SI
GN
S)
WHITE LETTERS, BLUE
BACKGROUND, PER
A.D.A. REQUIREMENTS
12" x 18" SIGN
BOLTED TO POST
VAN
ACCESSIBLE
USE VAN
ACCESSIBLE
SIGNAGE IF
APPLICABLE
N.T.S.
ADA PARKING SYMBOL DETAIL4 N.T.S.
ADA PARKING SIGN DETAIL5 N.T.S.
PRECAST CONCRETE WHEEL STOP DETAIL6
INSTALL ADA PARKING SYMBOL (TYP.)
PRECAST CONCRETE WHEEL STOP - 7 EA
ADA PARKING SIGN - 7 EA
8' 5'
PROPOSED PAVEMENT SECTION
EXISTING PAVEMENT PROCESSING SECTION
6" 33 4"
4"
4" (TYP.)
PR
O
CE
SS
IN
G
EX
. B
AS
E
S
U
RF
AC
E
6"
EX
CA
PROCESSING EXISTING BASE AND SURFACE
METHOD B (12 IN DEPTH)
UNCLASSIFIED EXCAVATION AFTER
PROCESSING & COMPACTING (6 IN)
EX. CURB
BACK PARKING LOT
(CONCRETE PAVEMENT)
FRONT PARKING LOT
(ASPHALT PAVEMENT)
FRONT PARKING LOT
(ASPHALT PAVEMENT)
BACK PARKING LOT
(CONCRETE PAVEMENT)
EX. ASPHALT PAVEMENT
EX. CURB
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
G G G G G G G G G G
/2
9:
A
M B
RA
ND
ON
.E
VE
RH
AR
T Z :\1
- S
W -0
SO
LI
D W
AS
TE
O
PE
RA
TI
ON
S
CE
NT
ER
IM
PR
OV
EM
EN
TS
\T
AS
K
2-
EN
GI
NE
ER
IN
G\
DR
AW
IN
GS
\1
4-
EN
TR
AN
CE
.D
W G
SHEET NUMBER
VERIFY SCALE
0 1"
BAR IS ONE INCH ON ORIGINAL
DRAWING. IF NOT ONE INCH ON
THIS SHEET, ADJUST ACCORDINGLY.
R E
V
IS
IO
N
S N
O
D A
TE
D
E S
C R
IP
TI
O N
SM
IT
H
RO
BE
RT
S
BALD
ISC
H W
IL
ER
, L
LC
C E R
T
IF
IC
A
T E O
F A
U T H
O R
IZ
A
T
IO
N N
O
E X
P
IR
E S J
U N
E
SE
AL
OF
TH
E
C
IT
YOF
OK
LA
H O M A
Y
IT
C
EXIST. JOINT
Scale: 1"=4'
CONCRETE PAVING REPAIR (NORTH ENTRANCE)2
EXIST. PAVEMENT CRACK
EXIST. PAVEMENT CRACK
PORTLAND AVENUE
PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE)
39 SY (28' X 12.5') SEE OKC STD. DETAIL D-800A
PAVEMENT CUT AND PERMANENT REPAIR (CONCRETE)
3 SY (12' X 2') (SEE OKC STD. DETAIL D-800A)
CAUTION:
UNDERGROUND
GAS LINE
SAWCUT - 28 LF
EXIST. JOINT
EXIST. JOINT
SOUTH PARKING BAY
(BUILDING "F")
SCALE: 1"=4'
CONCRETE PAVING REPAIR (BUILDING F)1
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
SO
LI
D
W A
ST
E
O
PE
R A
TI
O
N S
C
EN
TE
R
IM
PR
O
VE
M
EN
TS
PH
A
SE
C O
N C
R
ET
E
PA
VI
N
G R
EP
A
IR
S
I M
PR
O
VE
M
EN
T
N O
. 0
C7 Project #: SW-0234
DRAWN BY: EBL
CHECKED BY: RCS
DATE: 1/24/25
EXIST. JOINT
SAWCUT - 81 LF
SAWCUT NOTE: ENSURE SAWCUT FULLY REMOVES CRACKED EDGES AND SEGMENTS
WHEN SAWCUTTING ALONG EXISTING PAVEMENT CRACKS.
ADMINISTRATION BUILDING
(BUILDING "A")
CREW BUILDING
(BUILDING "B")
FLEET MAINTENANCE SHOP
(BUILDING "D")
WEST PARKING BAY
(BUILDING "E")
SO
U
TH
P
AR
KI
N G
BA
Y
(B U
IL
DI
N G
"F
TORNADO
SHELTER
(BUILDING "C")
PORTLAND AVENUE
TR
AI
LE
R
(B U
IL
DI
N G
"G
Scale: 1"=60'
REFERENCE SITE MAP3
O C
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
m an eet ds for a ional 6, ahoma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
W U
T
PR
O
JE
C T
N O
. S W
-0
4-
SO
LI
D W
A
ST
E O
PE
R
A
TI
O N
S C
EN
TE
R
IM
PR
O
VE
M
EN
TS
an et s for nal oma
| Sheets and Views |
| TITLE |
| G1 GENERAL NOTES |
| G4 SITE PLAN |
| C1 CONCRETE ADA RAMP |
| C2 BACKSTEP REPLACEMENT |
| C3 RAMP AND STAIRS REPLACEMENT (FRONT) |
| C4 RAMP AND STAIRS REPLACEMENT (BACK) |
| C5 PERIMETER FENCE REPLACEMENT |
| C6 PARKING LOT RESURFACING & RESTRIPING |
| C7 CONCRETE PAVING REPAIRS |
| PLANS 2025-01-24 (Half-size) |
| MECH HALF |
| ELEC HALF |
| PLUMBING HALF |
| OKC BACKENDS-HALF |
| EROSION HALF |
| 117064-EROSION-SWPPP |
| 117064-EROSION-EC |
ERO-D1 [HALF]