A8 Redacted CDRL.pdf
PDF 361 KB Posted
- Solicitation number
- N61331-26-Q-KS17
About this file
This is a Contract Data Requirements List (DD Form 1423-1) that specifies the data deliverables required for a contract titled "Lithium Battery Locker" under contract line item A001. The requiring office is NSWC PCD, and the contract reference is SOW Paragraph 3.1–3.2. The contractor must submit Work Summary Reports as the primary deliverable, with the subtitle specifying these as work summary reports. The form indicates that 1 copy of both draft and final versions should be delivered to the NSWC PCD addressee.
Key submission requirements include: work summary reports must be submitted within five days after completion of construction (Blocks 10, 12, 13); the contractor format is acceptable for submissions (Block 4); and reproducible copies must be submitted as signed PDF files via email (Block 14). The form references SEE BLK 16 for the first submission date and frequency of submissions. The estimated total price field is left blank on this form. The document is DD Form 1423-1, JUN 90, and includes comprehensive instructions on the reverse side for both government personnel and contractors regarding proper completion of data requirements lists, including guidance on categorizing data items into Groups I through IV based on whether costs are essential, required for conformance, or internal to the contractor's operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .