| File | Type | Posted |
|---|---|---|
| a8 amend2 12010920Q0065.pdf | ||
| 12010920Q0065 amend1.pdf | ||
| a7 attach4 Relevant Experience Evaluation Form.pdf | ||
| a7 Clarification Items.pdf | ||
| a7 attach1 AK20200007 2.7.2020.pdf | ||
| a7 12010920Q0065 naha trail.pdf | ||
| a7 attach2 NAHA Trail Recon phase 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME: NAHA TRAIL RECONSTRUCTION PHASE 1
CONSTRUCTION LOG
KEY TO WORK ITEMS:
ABBREV. DESCRIPTION
ASD AGGREGATE SURFACING WITH DITCH
AS AGGREGATE SURFACING
CRS CUT ROCK STEP
LRS LOG RISER STEP
CUL CULVERT
NW NO WORK
GENERAL NOTES
1). The beginning of work areas are marked on the ground by wood stakes with the work area number written upon them. Leave all stakes in place until such time that the work is accepted by the Government.
Should a stake be missing, notify the Government for replacement prior to the commencement of work in that area.
2). The work areas value shown is approximate feet from the beginning of the project or as referenced.
3). The Minimum Aggregate Surfacing Depth shown is the depth after placement and light compaction.
4). The quantities of steps/stones shown for Types LRS/CRS are estimates given for the contractors convenience only. The actual quantities may vary and the contractor is responsible for verifying the actual quantities.
WORK
AREA
BEGIN
DIST. AHEAD QUAN.
WORK
AREA
END
WORK ITEMS
MIN. AGGR.
SURFACING
DEPTH
(INCHES)
FINISHED
TRAIL
SURFACE
MIN. WIDTH
(INCHES)
ESTIMATED
C.Y. AGGR.
SURFACING
NOTES
0+00 80 6 0+80 AS, LRS 4" 30" 2.5 Grub, Gravel to grade, Include up to 6 steps to maintain grade, Cut into slope at 0+80
0+80 84 1+64 AS 4" 30" 2.5 Grub, Gravel to grade
1+64 30 6 1+94 CRS 4" 30" Cut RS out of existing large rock step up to 6 steps and continue with grade, add gravel where needed
1+94 113 3+07 AS 4" 30" 3.5 Grub, Gravel to grade
3+07 132 4+39 DEMO, AS 10" 30" 10.5 Remove boardwalk, Grub, Gravel to grade
4+39 28 4 4+67 AS, LRS, 4" 30" 1.0 Grub, Include up to 4 steps to maintain grade, Gravel to grade
4+67 105 6 5+72 ASD, LRS, CUL 6" 30" 5.0 Remove board walk steps and railing, build up to 6 LRS, Ditch for drainage, Gravel, 12" Culvert at 5+72
5+72 1397 19+92 NW
19+92 12 20+04 AS 4" 30" 0.5 Grub, Gravel to grade
20+04 24 20+28 DEMO, AS 4" 30" 0.5 Remove boardwalk. Grub, Gravel to grade
20+28 31 20+59 AS 4" 30" 1.0 Grub, Gravel to grade
20+59 30 20+89 DEMO, AS 4" 30" 1.0 Remove boardwalk, Grub, Gravel to grade
20+89 70 21+59 AS 4" 30" 2.0 Grub, Gravel to grade
21+59 39 21+98 DEMO, AS 4" 30" 1.0 Remove boardwalk, Grub, Gravel to grade
21+98 73 22+71 AS 4" 30" 2.5 Grub, Gravel to grade
22+71 33 23+04 DEMO, AS 4" 30" 1.0 Remove boardwalk, Grub, Gravel to grade
23+04 30 23+34 NW
23+34 228 25+52 DEMO. AS 4" 30" 7.0 Remove Boardwalk, Grub, Gravel to grade
WORK
AREA
BEGIN
DIST. AHEAD QUAN.
WORK
AREA
END
WORK ITEMS
MIN. AGGR.
SURFACING
DEPTH
(INCHES)
FINISHED
TRAIL
SURFACE
MIN. WIDTH
(INCHES)
ESTIMATED
C.Y. AGGR.
SURFACING
NOTES
25+52 47 25+99 AS 4" 30" 1.5 Grub, Gravel to grade
25+99 27 26+26 DEMO, AS 4" 30" 1.0 Remove boardwalk, Grub, Gravel to grade
26+26 43 26+69 DEMO, AS-Bench 4" 30" 2.0 Remove boardwalk, Grub, Gravel to grade (bench into sideslope)
26+69 24 26+93 DEMO. LRS 6" 30" 2.0 Remove existing staircase, Grub, Gravel to grade, Include up to 8 steps to maintain grade
SPUR
0+00 45 0+45 AS 4" 30" 1.5 Grub, Gravel to grade
0+45 21 0+66 AS, LRS 4" 30" 1.0 Grub, Gravel to grade, (Remove hump or install up to 6 steps)
0+66 39 1+05 AS 4" 30" 1.5 Grub, Gravel to grade
1+05 37 1+42 AS, Tree 4" 30" 1.5 Grub Gravel to grade, Hazard tree removal @ 1+05
1+42 58 2+00 AS 4" 30" 2.0 Grub, Gravel to grade, Remove roots
RE-RTE
0+00 21 0+21 AS 6" 30" 1.0 Re route away from root wad blocked trail, Grub,Clear, Gravel to grade
0+21 20 0+41 AS 6" 30" 1.0 Grub,Clear, Gravel to grade
0+41 23 0+64 AS 6" 30" 1.0 Grub,Clear, Gravel to grade, Tie into existing trail
OPT 1
23+04 30 23+34 DEMO, Bridge Remove Bridge-incules aprox: 4' elevated boardwalk on each side, install new timber bridge, blend aproaches into trail
Trail Log