This is a test procedure document (K-301-D) for verifying the tightness of a Periscope Mast Control Valve prior to installation in an SDV (SEAL Delivery Vehicle). The procedure outlines an air tightness test for the Mast Control Valve (P/N 7005580-1) to be performed by a Test Conductor and Reviewer.
The test procedure requires pressurizing various valve ports to 205-215 psig and observing for leaks while the valve is fully immersed in clean water for 5-6 minute intervals. The test is performed in multiple valve positions using calibrated pressure gauges (0-250 to 0-400 psig with ±0.5% accuracy). Key equipment includes clean connecting hoses, fittings, clean water container, and regulated compressed air supply. The document includes detailed steps, safety requirements, data recording sheets, and acceptance criteria specifying no leaks are acceptable during the test intervals. This procedure was prepared by NSWC PCD Code E43 and received NAVSEA approval, with the latest revision (Rev D) dated April 28, 2017.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A8 CDRL.pdf | ||
| SOW WORD REDACTED.pdf | ||
| C14 BNJ REDACTED.pdf | ||
| C12 Clauses-Supply.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSWC PCD
SEAL DELIVERY VEHICLE
TEST PROCEDURE
TEST PROCEDURE NO.
K-301
REV.
D
TITLE: Mast Control Valve Tightness, PIT
PREPARING ACTIVITY: NSWC PCD, Code E43 NAVSEA APPROVAL
PREPARED BY: DATE:
David M. Fonzi 15-Nov-95
APPROVED BY: DATE:
D.A. Whithaus 15-Nov-95
APPROVED BY: DATE:
R.S. Cummins 01-Oct-96
RECORD OF REVISIONS
LETTER DESCRIPTION DATE APPROVED
A Revised in accordance with DRN 1997-003 dated 21-Jan-97. 27-Jan-97 David M. Fonzi
B Revised in accordance with NOR R-0379 dated 04-Apr-05 on ECP E-0297. 25-Apr-05 R.E. Mattson
C Revised in accordance with NOR R-0534 dated 19-Mar-10 on ECP E-0423. 02-Dec-10 Steven D.
Albertson
D Revised in accordance with NOR R-0860 dated 01-Nov-16 on ECP E-0666. 28-Apr-17 D. Maglich
PART NAME AND PART NUMBER(S) WITH ASSOCIATED SERIAL NUMBER(S)
Part Name P/N S/N
Mast Control Valve 7005580-1
CERTIFICATION, REVIEW, AND APPROVAL OF TEST RESULTS
Test Certification Signature
TEST CERTIFIED COMPLETE AND ACCURATE
Testing Activity:
TEST CONDUCTOR: DATE:
QCI: DATE:
Not Required
TEST DIRECTOR: DATE:
Review & Acceptance Signatures
REVIEW AND ACCEPTANCE OF TEST RESULTS
Reviewing Activity: NSWC PCD, Code ________
REVIEWER: DATE:
BRANCH HEAD: DATE:
NAVSEA ACCEPT: DATE:
K-301-D
1.0 TEST DESCRIPTION
1.1 TITLE: Mast Control Valve Tightness
1.2 AUTHORITY
1.2.1 This Test Procedure is generated per the requirements of the MK8 MOD1 SDV drawing package and in accordance with CSS-SDV-0019, Integrated Test Plan for MK8 MOD1 SEAL Delivery Vehicles.
1.3 OBJECTIVE
1.3.1 To verify the tightness of a Periscope Mast Control Valve prior to installation in an SDV.
1.4 TYPE OF TESTING REQUIRED
1.4.1 The following testing is required for each Control Valve tested.
a. Air Tightness Test
2.0 REFERENCES
NOTE
Only current revisions of direct support and/or supplemental documents shall be used in the conducting of this test.
2.1 DIRECT SUPPORT DOCUMENTS
2.1.1 None
2.2 SUPPLEMENTAL DOCUMENTS
2.2.1 CSS-SDV-0019, Integrated Test Plan for MK8 MOD1 SEAL Delivery Vehicles
2.2.2 Drawing 7005580, Mast Control Valve
2.2.3 Title 29, Code of Federal Regulations, Part 1910 Subpart S of the Occupational Safety and Health Standards.
3.0 GENERAL NOTES
3.1 NOTIFICATION
3.1.1 This test requires only a Test Conductor and a Reviewer.
3.2 TEST DATA RECORDING
3.2.1 Remarks and general observations are particularly important in maintaining an accurate and meaningful record. Any unusual event occurring during the performance of the test shall be noted on the Data Sheet.
3.2.2 If space is not provided on the Data Sheet for recording certain data, it shall be recorded on Supplemental Data Sheet(s), Section 7.0.
3.2.3 The Data Sheet(s) shall be completely filled in, dated, and signed. If certain data called for was not recorded, an entry shall be made explaining the missing data.
3.2.4 Any substitution of components or equipment during the course of the test must carry complete documentation in accordance with Section 3.3.
3.2.5 All times shall be documented using 24-hour time convention notation using one of the following formats: ‘hh:mm’ or ‘hhmm’ (e.g. 09:23 or 0923).
3.3 DEPARTURES
3.3.1 No deviations from test methods specified or changes in installation from approved plans shall be made without prior written approval from cognizant Lead Engineer through the procuring Government agency, as required.
3.3.2 Any changes to the specified tolerances will require NSWC PCD Engineering concurrence. Every effort shall be made to meet specific tolerances. Where this is not possible, the NSWC PCD cognizant Lead Engineer shall be consulted immediately, through the procuring Government agency, as required.
4.0 PREPARATION
4.1 PREREQUISITE AND CONCURRENT TESTS
4.1.1 There are no prerequisite tests.
4.1.2 There are no concurrent tests to be performed.
4.2 TEST LOGISTICS
4.2.1 Applicable test equipment used in conducting this test shall be maintained to the same cleanliness level of the equipment being tested.
4.2.2 Calibrated Test Equipment
NOTE
Test equipment shall have been calibrated in accordance with ISO 10012-1, Calibrated System Requirements. The Test Conductor shall be responsible for using only IN DATE calibrated instruments.
4.2.2.1 0-250 to 0-400 psig Pressure Gauge with an accuracy of +0.5% or better
4.2.3 Special Test Equipment
4.2.3.1 Plug, No.4. Straight Thread
4.2.4 Standard Test Equipment
4.2.4.1 Clean Connecting hoses and fittings
4.2.5 Test Spares and Consumables
4.2.5.1 Container of clean water
4.2.5.2 Clean regulated compressed air supply
4.3 SAFETY AND EMERGENCY CONSIDERATIONS
4.3.1 The Test Conductor shall be familiar with the Occupational Safety and Health Standard
29 CFR 1910. The Test Conductor shall also be aware of potential hazards, safety precautions, and emergency procedures associated with this test.
4.3.2 The Test Conductor shall:
• Review this test procedure throughout to become familiar with specific tasks to be performed, as well as any warning or caution statements which may be contained herein;
• Verify that the test and support equipment meet the requirements of this test procedure; and
• Inspect all test and support equipment for serviceability and repair or replace as required prior to commencement of this test.
If any condition develops which, in the judgement of the Test Conductor, constitutes a danger to personnel or equipment, the test shall be stopped until the condition is corrected.
4.3.3 Specific Safety Procedures
4.3.3.1 Fittings shall not be tightened nor loosened while under pressure.
4.3.3.2 Safety Glasses shall be worn while working with compressed air.
4.3.4 Specific Emergency Procedures
4.3.4.1 None
4.3.5 Additional Required Personnel
4.3.5.1 None
5.0 PROCEDURE
5.1 TEST PREPARATION
5.1.1 Verify that the valve has been tagged QC acceptable and has been serialized.
5.1.2 If the valve has no handle, install a temporary handle for the test.
5.1.3 Operate the valve through all positions to verify that it is operating correctly.
5.1.4 If the valve is not operating correctly or is otherwise unacceptable, abort the test.
5.2 AIR TIGHTNESS TEST (Refer to Figure 1)
5.2.1 Connect the clean air supply with the calibrated pressure gauge in line to valve port D.
5.2.2 Install the plug in valve port A.
5.2.3 Rotate the valve handle to position 1 and pressurize the system to 205 +10/-0 psig. No air should pass through the valve.
5.2.4 Fully immerse the valve in clean water. Record the start time on the Data Sheet.
5.2.5 Observe the water for evidence of escaping air for 5 +1/−0 minutes. No leaks are acceptable. If no leaks are detected, record the results and the stop and elapsed times on the Data Sheet. If a leak is detected, record the results on the Data Sheet and abort the test.
5.2.6 Depressurize the system by securing the air supply and slowly rotating the valve handle to purge the lines.
5.2.7 Remove the plug from port A and install it into valve port C.
5.2.8 Rotate the valve handle to position 2 and pressurize the system to 205 +10/−0 psig. No air should pass through the valve.
5.2.9 Repeat steps 5.2.5 and 5.2.6.
5.2.10 Connect the clean air supply with the calibrated pressure gauge in line to valve port B.
5.2.11 Rotate the valve handle to position 1 and pressurize the system to 205 +10/-0 psig. No air should pass through the valve.
5.2.12 Repeat steps 5.2.5 and 5.2.6.
5.2.13 Remove the plug from port C and install it into valve port A.
5.2.14 Rotate the valve handle to position 2 and pressurize the system to 205 + 10/−0 psig. No air should pass through the valve.
5.2.15 Repeat steps 5.2.5 and 5.2.6.
5.2.16 Remove the valve from the water.
5.2.17 Depressurize the system by securing the air supply and slowly rotating the valve handle to purge the lines. Remove the valve from the test setup and complete the Data Sheet.
FIGURE 1. MAST CONTROL VALVE
DATA SHEET
MAST CONTROL VALVE TIGHTNESS
Mast Control Valve, PN 7005580-1, SN
Required Actual Serial Calibration Accuracy Accuracy Number Due Date
0- psig Pressure Gauge +/-0.5% (0-250 to 0-400 psig)
AIR TIGHTNESS TEST (5.3)
Measurement Required Actual
Position 1 Air Pressure 205-215psig psig
Start Date/Time As Observed
Stop Date/Time As Observed
Elapsed Time 5-6 Min. min
Position 2 Air Pressure 205-215 psig psig
Start Date/Time As Observed
Position 1
Start Date/Time As Observed
DATA SHEET (Continued)
MAST CONTROL VALVE TIGHTNESS
Mast Control Valve, PN 7005580-1, SN
AIR TIGHTNESS TEST (5.3) – (Continued)
Position 2
Start Date/Time As Observed
TEST ACCEPTANCE CRITERIA:
No leaks during the 5 minute test interval.
THE OVERALL TEST RESULTS ARE: ( ) SAT ( ) UNSAT
Sections 2.0 and 4.1 have been fully complied with, as required.
Supplemental Data Sheet(s) are used: ( ) No ( ) Yes pgs.
Test Conductor ORG Date
Signature
QC Inspector Not Required ORG Date
6.0 CONCLUSION
6.1 DEFICIENCIES
6.2 EVALUATION OF TEST
6.2.1 Actual in-service conditions and environment have been encountered or simulated.
( ) Yes ( ) No
Comments:
6.2.2 The system has complied with test objectives. ( ) Yes ( ) No
Comments:
6.3 RESULTS ( ) Satisfactory ( ) Unsatisfactory
( ) Satisfactory with Conditions
6.4 COMMENTS
Mast Control Valve, P/N 7005580-1, SN ______________
Reviewer: Date:
Title: Code:
7.0 SUPPLEMENTAL DATA SHEET
TEST NAME: PART NO. / SERIAL NO:
REASON FOR TEST:
COMMENTS:
RESULTS:
Test Conductor ORG Date
QC Inspector Not Required ORG Date