A6_0-1449RFQ-12970223Q0043-7Apr2023.pdf

PDF 8 MB Posted

Attached to
USFS Region 3 Burned Area Emergency Response (BAER) Gates and Fencing Delivery and Installation
Solicitation number
12970223Q0043
Issued by

View the file

Other files

File Type Posted
A07_RFQ-QA-19Apr2023.pdf PDF
A1-JA-USFSR3NREPostDisaster-20220622.pdf PDF
A07_RFQ-QA-18Apr2023.pdf PDF
A6_1-FillableSOI-12970223Q0043BAERGates.xlsx XLSX spreadsheet
A6_1-WDOL-NM20220042.pdf PDF
A6_1-WDOL-NM20220010.pdf PDF
A6_1-WDOL-NM20220012.pdf PDF
A6_1-WDOL-NM20220011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1081888

USDA FOREST SERVICE

SPOC SOUTHWEST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

MATTHEW KILLIAN 800-832-1355

104/07/2023

12970223Q0043

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Title: USFS Region 3 Burned Area Emergency Response (BAER) Gates & Fencing

Fabrication & Installation

Project Description: USFS Region 3 is pursuing a contract to provide gate and fencing fabrication and installation in response to the Bear Trap, Black, and

Hermits Peak/Calf Canyon Fires. Project shall be performed by the awardee in accordance with the Statement of Work found in Section B of this Solicitation.

This Request for Quotes (RFQ) is set aside 100% for Small Business entities. In accordance with the Natural Resources and Environment (NRE) Mission Area

Justification & Approval, dated 22 June 2022, and FAR 6.302-2, this Request for

Quotes is further set aside for local business concerns. See the referenced

Justification and Approval for a definition of "local." Quotes from business entities outside of the defined local business area will not be considered for award.

Project Location: Various Region 3 National Forest Locations, in accordance with

Solicitation specifications, Statement of Work, and Schedule of Items

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

1 95 calendar days and complete it within ________________ ________________ calendar days after receiving

04/21/2023

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

SPOC SOUTHWEST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

KLENISE S. WALLACE

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

Company Name:

Address:

UEI #:

POC Name:

POC Email:

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

MatthewKillian Highlight

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 38

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12970223Q0043

Quotes shall be submitted on or before the proposal due date/time designated in block 13 of this form. Inquiries shall be submitted to the

Solicitation Point of Contact listed below, in accordance with the instructions in Section E of this Solicitation.

*SEE SECTION E FOR DETAILED INSTRUCTIONS TO

OFFERERS*

Solicitation Point of Contact:

Contract Specialist, Matthew (Matt) Killian

Email: matthew.killian@usda.gov

Delivery: 08/04/2023

Delivery Location Code: 8399

USDA FOREST SERVICE

GILA NATIONAL FOREST SUPERVISORS

3005 E CAMINO DEL BOSQUE

SILVER CITY NM 88061 US

Mark For:

USDA FOREST SERVICE

SPOC SOUTHWEST

1400 INDEPENDENCE AVE SW MS-1138

WASHINGTON DC 20250-0001

Period of Performance: 05/01/2023 to 08/04/2023

0001 Fabrication and Installation of gates for Bear

Trap, Black Fire, Hermits Peak/Calf Canyon Fire.

See Schedule of Items for detailed description.

0002 Pipe Fence exclosure repair for Bear Trap. See

Schedule of Items for detailed description.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. QNTY UNIT UNIT PRICE AMOUNT

1 LSQ

1 Fabrication (only) of Phase 1 single arm gates (Bear Trap) 7 EA

2 Fabrication & painting of Phase 1 single arm gates (Black) 6 EA

3 Fabrication & painting of Phase 1 double arm gate (Black) 1 EA

4 Fabrication (only) of Phase 1 single arm gate (HPCC-Carson) 1 EA

5 Installation of Phase 1 Gates 10 EA

6 Delivery of Phase 1 Gates 5 EA

7 Fabrication (only) of Phase 2 single arm gates (Bear Trap) 4 EA

8 Installation of Phase 2 single arm gate 1 EA

9 Delivery of Phase 2 gates 3 EA

10 Fabrication (only) of Phase 3 single arm gates (HPCC - Santa Fe) 4 EA

11 Fabrication (only) of Phase 3 double arm gates (HPCC - Santa Fe) 2 EA

12 Delivery of Phase 3 gates 2 EA

13 Installation of all Phase 3 gates 4 EA

14 Fabrication (only) of Phase 4 single arm gate (HPCC - Carson) 1 EA

15 Fabrication (only) of Phase 4 double arm gates (HPCC - Carson) 3 EA

16 Delivery of Phase 4 double arm (only) gates 3 EA

17 Delivery of Phase 4 single arm (only) gate 1 EA

18 Mobilization/Demobilization 1 EA

1 LSQ

1 Fabrication (only) of Phase 2 - 200ft of pipe fence (Bear Trap) 1 EA

2 Installation of Phase 2 - 200 ft of pipe fence 1 EA

3 Mobilization/Demobilization 1 EA

Total

SOI NOTES:

1 VENDOR INPUT REQUIRED

4 EA - EACH

5 ANY AWARD WILL BE TO ONE QUOTER

LSQ - LUMP SUM QUANTITY

DATE:

AUTHORIZED TO SIGN:

(NAME & TITLE)

SIGNATURE:

BUSINESS EMAIL:

BUSINESS PHONE:

R3 BAER Gates & Fencing Fabrication & Installation Carson, Santa Fe, Cibola, Gila National Forests

SECTION B - CONTINUATION OF 1442

Fabrication & Installation of gates for Bear Trap, Black Fire, Hermits Peak/Calf Canyon (HPCC) Fire

VENDORS PLEASE NOTE: BEFORE PREPARING QUOTE, CAREFULLY READ THE CONTENTS OF THIS SOLICITATION.

SCHEDULE OF ITEMS

VENDOR NAME:

SAM UEI #:

DESCRIPTION

Pipe Fence Exclosure Repair for Bear Trap Fire

DESCRIPTION/SPECIFICATION/STATEMENT OF WORK

This work shall consist of installing road closure devices using fabricated gates for three fires including Bear Trap, Black, and Hermits Peak/Calf Canyon. The work will also involve reinstalling a fabricated pipe fence for one fire, Bear Trap.

Description of Work

Project #1: Fabrication and Installation of Gates:

This project consists of fabricating 18 gates (17 single arm gates with warning signs and 1 double arm gate) for the Bear Trap, Black, and Hermits Peak/Calf Canyon Fires in which 10 of them will be installed and 8 of them will be delivered. These gates will be installed and delivered in two phases which are outlined in Tables 1 and 2.

Gates for Hermits Peak/Calf Canyon and Bear Trap fires will be unfinished (no paint). All gates fabricated for the Black Fire will be painted with Fed Std 595C 20059 (brown). See attached specification drawings for gate design and sign placement. Any deviations from the above plan and attached specifications need prior approval from the CO.

Project #2: Re-Installation of Pipe Fencing:

This project is to occur as part of the phase 2 gate installation and will include the reinstallation of approximately 200 feet of pipe fence that was damaged during fire suppression efforts around Eagle Spring on the Bear Trap Fire. Replacement of the 200 feet pipe fence consists of two fences, an interior high fence, and an exterior low fence. Installation of two hinged water gaps is also needed. Installation of the new 200-foot sections (both exterior and interior) will need to be constructed and attached in a way a contiguous feature is formed (i.e. one fence) with the intact/remaining portion of the previous fence. The contractor is responsible for both the removal and the disposal of the damaged portions of the fence (both interior and exterior).

See specification Photos 1 and 2 below for interior and exterior pipe fence details.

Project #3: Additional Fabrication and Installation of Gates on Hermits Peak/Calf Canyon (Santa Fe NF)

This project consists of fabricating 6 gates and is composed of installing 2 single arm and 2 double arm gates, delivering 1 single arm gate to the Las Vegas RD in Las Vegas, NM for use on the Hermits Peak/Calf Canyon Fires, and delivering 1 single arm gate to the Santa Fe NF SO.

These gates will be installed and delivered as outlined in Table 4.

Additional gates for Hermits Peak/Calf Canyon will be unfinished (no paint), fabricated, and installed to the specifications outlined in this statement of work.

Project #4: Additional Fabrication and Installation of Gates on Hermits Peak/Calf Canyon (Carson NF)

This project consists of fabricating and delivering 4 gates (1 single arm gate and 3 double arm gates) to the Camino Real Ranger District Office (15160 State Road 75, Penasco, NM 87553).

The gates will be delivered as outlined in Table 5.

Additional gates for Hermits Peak/Calf Canyon will be unfinished (no paint), fabricated, and delivered to the specifications outlined in this statement of work.

Project Location

Projects are located on the Carson/Santa Fe (Hermits Peak/Calf Canyon), Cibola (Bear Trap fire), and Gila (Black fire) National Forests. Delivery and installation are anticipated to occur within Grant, Socorro, San Miguel, Santa Fe, Taos, Catron, and Sierra Counties. See the attached maps for specific locations.

Table 1 Project #1: Phase 1 Approximate Gate Locations Fire Gate # Latitude / Longitude Bear Trap (2 single arms – close together at the same location)

#1&2 33 53’48.4 N, -107 30’39.6 W

Bear Trap (single arm) #3 33 50’14.4 N, -107 34’36.9 W Bear Trap (single arm) #4 33 47’12.1 N, -107 36’51.9 W Bear Trap (single arm) #5 33 41’42.3 N, -107 33’40.8 W Bear Trap (single arm) #6 33 48’06.4 N, -107 27’33.1 W Black (single arm) #1 Fort Bayard, Silver City, NM 88061 Black (single arm) #2 Fort Bayard, Silver City, NM 88061 Black (single arm) #3 Fort Bayard, Silver City, NM 88061 Black (single arm) #4 Fort Bayard, Silver City, NM 88061 Black (single arm) #5 Fort Bayard, Silver City, NM 88061 Black (single arm) #6 33 11’ 37.4 N, - 108 01’ 54 W Black (double arm) #7 33 10’ 44 N, -108 12’ 16 W Hermits Peak/Calf Canyon (Carson) (single arm)

#1 36 07’00.2 N, -105 30’11.7 W

Table 2 Project #1: Phase 2 Approximate Gate Locations Fire Gate # Latitude / Longitude Bear Trap (single arm) #1 Magdalena, NM Bear Trap (single arm) #2 33 45’44.7 N, -107 33’09.2 W Bear Trap (single arm) #3 Magdalena, NM Bear Trap (single arm) #4 Magdalena, NM

Table 3 Project #2: Phase 2 Approximate Pipe Fence Location Fire Latitude / Longitude Bear Trap (fence) Pipe

Fence 33 52’31.9 N, -107 31’01.1 W

Table 4 Project #3: Phase 3 Approximate Gate Locations Fire – HPCC Santa Fe Gate

Latitude / Longitude

Hermits Peak/Calf Canyon (single arm)

#1 Deliver to Las Vegas RD in Las Vegas, NM

Hermits Peak/Calf Canyon (double arm)

#2 35° 33' 58.12" N, -105° 29' 31.39" W

Hermits Peak/Calf Canyon (single arm)

#3 35° 34' 20.56" N, -105° 28' 54.20" W

Hermits Peak/Calf Canyon (single arm)

#4 35° 34' 9.14" N, -105° 28' 1.73" W

Hermits Peak/Calf Canyon (double arm)

#5 35° 34' 9.99" N, -105° 28' 2.41" W

Hermits Peak/Calf Canyon (single arm)

#6 Deliver to Santa Fe NF SO 11 Forest Lane, Santa Fe, NM 87508

Table 5 Project #4: Phase 4 Approximate Gate Locations Fire – HPCC Carson Gate # Latitude / Longitude Hermits Peak/Calf Canyon (double arm) #1 Deliver to Camino Real RD in

Penasco, NM Hermits Peak/Calf Canyon (double arm) #2 Deliver to Camino Real RD in

Penasco, NM Hermits Peak/Calf Canyon (double arm) #3 Deliver to Camino Real RD in

Penasco, NM Hermits Peak/Calf Canyon (single arm) #4 Deliver to Camino Real RD in

Penasco, NM

Contractor Furnished Items

The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Specifications. The contractor is also responsible for clean-up of the work area to include but not limited too; hauling materials from broken pipe fence, trash accumulated during construction, site cleanup, etc.

Government Furnished Items

Type II Object Markers for all gate posts to be installed on BEAR TRAP ONLY.

Performance

The overall Period of Performance for this requirement is Notice to Proceed (NTP) +95 days.

The projected Period of Performance start date is 1 May 2023, for a projected overall Period of Performance of 1 May 2023 through 4 August 2023.

Projects #1, #3, and #4: Fabrication and Installation of Gates

A. Road closure devices (gates) shall be placed at the location SHOWN ON THE ATTACHED MAPS. All devices shall be constructed to the dimensions SHOWN IN THE ATTACHED DRAWINGS (i.e. single arm vs double arm).

B. Welding required in assembling gates shall be done in accordance with the best modern practice and the applicable requirements of AWS D1.1.

C. After assembly, each pipe gate shall be cleaned. Bear Trap and Hermits Peak/Calf Canyon gates may remain unfinished (i.e. no paint). Black fire gates shall be painted with one coat of zinc-rich primer and one coat of exterior enamel Fed Std 595C 20059 (brown).

D. All posts for all gates shall be set vertically, leveled, and embedded to the depth SHOWN ON THE DRAWINGS. Concrete may be required to achieve stabilization and in areas where the minimum set depth cannot be achieved. Backfill shall be compacted in 6-inch layers to finished grade.

E. All signs and/or reflective warning markers accessory to the road closure device as SHOWN ON THE DRAWINGS shall be furnished and installed by the contractor

PER EM 7100-15 CHAPTER 3D TRAFFIC CONTROL DEVICES PLACEMENT

AND INSTALLATION (See Figures 1a, 1b, 2a, and 2b).

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprd3810021.pdf

Figure 1a. Elevation view of single arm gate w/ Type II Object Markers and red and white retroreflective tape.

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprd3810021.pdf

Figure 1b. Plan View of Single Arm Gate w/ Type II Object Markers.

Figure 2a. Elevation view of Double Arm Gate w/ Type II Object Markers and red and white retroreflective tape.

Figure 2b. Plan view of Double Arm Gate w/ Type II Object Markers and red and white retroreflective tape. (Note: Barricade Markers not needed.)

Project #2: Re-Installation of Pipe Fencing

A. Interior and exterior pipe fence shall be placed at the location SHOWN ON THE ATTACHED MAPS. Both sections of fence (interior and exterior) shall be constructed to the dimensions SHOWN IN THE CAPTIONS OF PHOTOS 1 AND 2

BELOW and shall correspond with the remaining undamaged portion of fence in the field.

B. Welding required in assembling the interior and exterior fence shall be done in accordance with the best modern practice and the applicable requirements of AWS D1.1.

C. After assembly, each pipe fence shall be cleaned to the extent possible. The fence may remain unfinished (i.e. no paint).

D. All posts shall be set vertically, leveled, and embedded to the minimum set depth SHOWN IN THE CAPTIONS OF PHOTOS 1 and 2 BELOW. Concrete may be required to achieve stabilization of the 200-foot fence (both interior and exterior) and in areas where the minimum set depth cannot be achieved.

Bio-based/ Sustainable Products

The contractor must comply with the Agriculture Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 9FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance”, dated October 2, 2009; EO 13423, “Strengthening Federal Environmental, Energy and Transportation Management”, dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products. All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.

In the performance of this contract, the Contractor shall make maximum use of biobased oils and lubricants that are designated by the United States Department of Agriculture unless the product cannot be acquired: (1) Competitively within a time frame providing for compliance with the contract performance schedule; (2) meeting contract performance requirements; or (3) at a reasonable price. Information about these products is available at http://sftool.gov/green-products/1/construction-materials.

The Federal Acquisition Regulation (FAR) requires Contractors to report the purchase of biobased products under service and construction contracts during the previous Government fiscal year (October 1 thru September 30) and to submit this report no later than October 31 of each year during contract performance and at the end of contract performance (as applicable).

Information about this requirement is available at

HYPERLINK

"https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml"https://www.biopreferr ed.gov/BioPreferred/faces/catalog/Catalog.xhtml#.

Project Drawings/Guides/Photos/Exhibits

The included drawings, reference guides, photos, and map exhibits are part of this solicitation and any resultant contract.

Figure 1a & 1b: Gate Installation Typical Single Arm Figure 2a & 2b: Gate Installation Typical Double Arm Reference 1: Chapter 3D Traffic Control Devices Placement and Installation Photo 1: Interior Fence Photo 2: Exterior Fence Exhibit 1: USDA FS Sign Installation Guide (page 20-21) Exhibit 2: Map-Black Fire Exhibit 3: Map-Beartrap Fire Exhibit 4: Map-Hermits Peak/Calf Canyon Fire Gate #1 Project 1 Phase 1 Exhibit 5: Map-Hermits Peak/Calf Canyon Fire Gate #1 Project 3 Phase 3

Photo 1- Interior fence will be approximately 8 feet tall with fixed-knot or similar wire. Posts will be approximately 10 feet apart, level, and set in concrete if necessary. See example above. Minimum set post depth of 36 inches.

Photo 2- Exterior fence will be two pipe rails approximately 36-42 inches tall as shown in the photo above. Posts will be approximately 10 feet apart, level, and set in concrete if necessary. Minimum set post depth of 18 inches.

Page cut line. Do not print.

Page cut line. Do not print.

Gate Sign Installation

Barricade Markers (BM), Type 2 Object Markers (OM), and End-of-Roadway Markers (OM4-1, 2, or 3) Used on Gates

If motorized or nonmotorized use (such as bicycles) occurs behind a gate, the back side may require signing also. The size of barricade markers depends on approach speeds.

Type 2 OM

One-lane road

OM4-1, 2, or 3

Traveled way

Min. 32 to 42 in

One-lane road

Plan view

Locking device

E dg e of r oa d

Two-lane road

Note: Sign and/or mark both sides of gates if traffic can approach from behind gate.

Elevation view

Type 2 OM Securing post Securing post

Type

2 OM

Locking device

Type 2

OM

Min. 32 to 42 in

32 to 42 inches

Type

2 OM

Type 2 OM

Type 2 OM

BM

BM

BM

Min. 32 to 42 in Min. 32 to 42 in

Page cut line. Do not print.

Page cut line. Do not print.

Gate Signing With Object Markers (OM) for One-Lane Roads

P I N O S A L T O S

R A N G E

Gate Location 1 at Grapevine Campground

Gate Location 2 at Black Canyon Campgrounds

1-93

3-29

3-5

1-53

Gila Wilderness

Aldo Leopold

Wilderness Gila Cliff

Dwellings

Little Walnut

Cherry Creek

Grapevine

Bear Canyon (State)

McMillan

Upper End

Forks Lower Black Canyon

Upper Scorpion

Upper Black Canyon

Lower Scorpion

Mesa

Sapillo

Rocky Canyon

Ben Lilly Memorial

Sen C.P.

Anderson Overlook

Ra dio

Tower Rd

N Sw a n S t

Georgetown

Fie rro

Rd

Little Walnut Rd

CAMINO FORESTA

Cottage San

Mimbres R.

Mimbres R

Silva Cr.

W.Fo rk Gila R.

C ow Cr.

Bear C r.

S apillo Cr .

Sapillo Cr.

Cherry Cr.

E. Fo rk Mimbre s R

Ansones Cr.

Tw in

Sis ter s C r.

Atlantic Cr.

Gila R.

Gila R.

Little Cherry Cr.

Ha nov er C r.

W. Fork MimbresR.

N. Fork Walnut Cr.

Rio deAren as

Steph ensCr.

E. ForkGil a R.

Trout Cr.

Little Cr.

Blac kCa nyon Cr.

SnowCr.

S. Diamond Cr.

Meadow Cr.

CameronCr.

San taRita Cr.

Cop peras Cr.

Pin os

Alt os Cr.

Wilso n Cr.

ArroyoRi co

Salt Cr.

Little Turkey Cr.

Wh isk ey Cr.

Meason Cr.

Sycamore Cr.

Apache Cr.

Mill Cr.

Beartooth Cr.

W. Fo rk Sno w Cr.

4085Q

4080T

A

150A

152151

Fierro

Gila Hot Springs

Mimbres Pinos Altos

Fort Bayard

Little Walnut Village

Hanover Turnerville

Arenas Valley

Gi la

NF

Gila NF

Alum Mountain

Signal Knob

Rocky Point

Castle Knob

Gomez Peak

Horse Mountain

Gooseneck Hill

A Four Mountain

Snake Hill

Stewart Peak

Eighty Mountain

T X Mountain

Humbolt Mountain

Copperas Peak

Zinc Hill

Tom Moore Mesa

Hermosa Mountain

Fierro Hill

Middle Mountain

Lookout Point

Pinos Altos Mountain

Union Hill

Hanover Mountain

Black Peak

Buck Hannen Mountain

Loco Mountain

Lee Hill (historical)

Avalanche Peak

Brushy Mountain

Twin Sisters

Preachers Point

Granny Mountain

Cross Mountain

Signal Peak

Round Mountain

Middle Mesa

Bull Hill

Devils Garden

Wild Horse Mesa

Me Own Hill

Scott Peak

Topknot Hill

Century Hill

7 88

7 18

151A

711719

72B

55C725

74A

Ft.

Bayard

Gila Center

Meown Work Center

972974

Lake Roberts

Bear Canyon Reservoir

0 1 2 3 4 50.5 Miles

NAD 1983 UTM Zone 13N

This product is reproduced from geospatial information prepared by the USDA Forest Service. Geospatial information and GIS product accuracy may vary. Using GIS products for purposes other than those for which they were created may yield inaccurate or misleading results. USDA Forest Service reserves the right to correct, update, modify or replace GIS products without notification2/9/2023

Southwestern Region | Gila National Forest

Forest Service

U.S. DEPARTMENT OF AGRICULTURE

Black Fire Gate Installation Locations

USDA is an equal opportunity provider, employer and lender

Gila National Forest Boundary Surface Ownership

US Forest Service USFS Wilderness Bureau of Land Management

Dept. of Defense National Park Service Private State Lands State Game and Fish

Continental Divide NST Non-Motorized Trail Motorized Use Trail

Highway Improved Road, Paved Improved Road, Gravel Improved Road, Dirt Unimproved Road

!C

!A

Y

!F"

83Z

Commisary Creek Stream Crossing

Barillas Repeater

HPCC Phase I

Gate on FSR 83Y at Junction with 83

Gate on FSR 83 at Junction with 83Y

Gate on FSR 83 at Junction with 83Y

Gate on FSR 83 at Junction with 200L Loo kou t Rd

Barillas Lookout

83Q

66J

66F

0M

A

83Y

66F

L

Ojitos Frios Creek-Tecolote Creek

HUC 12

Canon Mesteno-Tecolote Creek

HUC 12

Apache Canyon

HUC 12

Apache Canyon

HUC 12

El Rito

HUC 12

¯ Coordinate System: NAD 1983 UTM Zone 13N Projection: Transverse Mercator Datum: North American 1983

Santa Fe National Forest

Hermits Peak / Calf Canyon BAER - Phase III Barillas Lookout Area Recommended Treatments

0 0.5 1 Miles

U.S. Forest Service, Southwestern Region

!F" Trail Warning Sign

!< Gate

!C Storm Proofing

Trail Admin only Lvl 2 FS Road Open to All Vehicles All Year Storm Proofing

Santa Fe National Forest Private Inholding

Low Moderate High

Soil Burn Severity Unburned

SECTION C - CONTRACT CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452) FAR and AGAR Deviations to clauses may be viewed at: Policies & Regulations | USDA

52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

(JAN 2017)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment (NOV 2021) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-28 Post Award Small Business Program Rerepresentation (MAR 2023) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

(MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.usda.gov/da/ocp/ppd/policies-regulations

52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (MAY 2022) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN 2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction

Contracts (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-5 Material and Workmanship (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.242-14 Suspension of Work (APR 1984) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Products and Commercial Services (MAR 2023) 52.245-1 Government Property (SEP 2021) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (APR

1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984)

Alternate I (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991) 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archaeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 1 calendar day after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 95 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

52.225-9 Buy American Act-Construction Materials (OCT 2022)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.

Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or https://www.acquisition.gov/far/part-2#FAR_2_101 https://www.acquisition.gov/far/part-25#FAR_25_105

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all component used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

_____________________none___________________________

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-12#FAR_12_505

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1) (i)Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction Material Description Unit of Measure Quantity Price (Dollars)* Item1

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______ Item 2

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______

*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.228-1 Bid Guarantee (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –

(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION APR 2020)

(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond -

(1)A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and

(2) Standard Form 28, Affidavit of Individual Surety, [except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12].

(b)The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.

(c) A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—

(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.

(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.

(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.

(d)The Contracting Officer may allow the Contractor to substitute an individual surety, forperformance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.

52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION APR 2020) (a)Definitions. As used in this clause -- “Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy.pdf https://www.acquisition.gov/far/part-28#FAR_28_203_1 https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy.pdf the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is valued at or…

This is the start of the file's text. The full file is on GovTribe.