About this file

This is a Performance Work Statement (PWS) for inspection and calibration services of LECO micro hardness testers at PSNS & IMF Laboratory in Bremerton, Washington.

The contractor shall provide annual preventative maintenance and calibration/verification services for two government-owned LECO AMH-55/LM248AT Micro Hardness Testers (Serial Numbers XMS8223 and XMS8039) during the performance period of September 18, 2026 through September 17, 2027. Services include preventative maintenance (cleaning, servicing, lubrication, and repair as necessary), calibration by indirect verification method per ASTM E 92 Annex A1.4 in both Knoop (HK) and Vickers (HV) scales, and return of equipment in working condition. The contractor must be accredited to ISO 17025 by an ILAC-recognized accreditation provider. Upon completion of each service visit, the contractor shall provide a Field Service Report and Certificate of Calibration documenting both "as found" and "as left" conditions. Services will be performed on-site at 1400 Farragut Avenue, Bremerton, WA 98314, during business hours of 0730–1600 Monday through Friday, excluding federal holidays. Contractor personnel must obtain green badge security clearance with U.S. citizenship requirement and comply with shipyard digital media and computer requirements. A contract manager with full authority must be designated, and the contractor shall attend post-award conferences and periodic progress meetings with the Contracting Officer Representative (COR) and Technical Points of Contact (TPOC) at no additional cost to the government.

View the file

Other files

File Type Posted
C8 N4523A26R1302_Combined Synopsis RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

PSNS & IMF LABORATORY,

INSPECTION AND CALIBRATION OF LECO MICRO HARDNESS TESTERS

PART 1

GENERAL INFORMATION

1. GENERAL: This is a non-personal services contract to provide inspection and calibration services for the following mission-vital government owned equipment:

• LECO AMH-55/ LM248AT Micro Hardness Tester Serial Number: XMS8223 (AID 4523A16871)

• LECO AMH-55/ LM248AT Micro Hardness Tester Serial Number: XMS8039 (AID 4523A12455)

The Government shall not exercise direct supervision or control over any contractor employees.

Notwithstanding, the contractor shall ensure employees comply with all requirements of this Performance

Work Statement (PWS) and contract.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform on site calibration and repair of micro hardness testers as defined in this Performance Work

Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The of the PSNS&IMF Laboratory requires a contractor to provide annual preventative maintenance and calibration/verification of government owned micro hardness testers. Annual calibration/verification is required to maintain accredited mission support of metallographic analysis. One Microhardness tester has experienced temporary issues with recording data.

1.3 Objectives: To maintain, calibrate, and technically support test equipment.

1.4 Scope: The contractor shall perform at least one calibration/preventive maintenance for each equipment piece listed. Services include repair, calibration, field service report and calibration certificates

1.4.1 Basic Services: The contractor shall provide services.

• Annual service/Verification agreement for government owned micro hardness testers. Includes one service visit to be performed at date and time agreed upon between vendor and COR.

• Service includes preventive maintenance, cleaning, lubrication and repair, when necessary.

Contractor must be accredited to ISO 17025 by an ILAC recognized accreditation provider.

• Micro hardness tester shall be calibrated by indirect verification in both Knoop and Vickers scales per the latest revision of ASTM E92.

• Additional parts/labor as needed for Annual service.

• Upon completion of each service call the contractor must provide the laboratory with a Field Service

Report that describes the services provided as well as a certificate of calibration.

1.5 Period of Performance: The period of performance shall is 9/18/2026 - 9/17/2027

1.6 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.

1.6.1 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the

Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.7 Location:

1.7.1 Place of Performance: The work to be performed under this contract will be performed at PSNS &

IMF, , 1400 Farragut Ave, Bremerton, WA 98314.

1.7.2 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730 to 1600 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.7.3 Recognized Holidays: Contractor is not required to perform services on federal holidays. The list of current federal holidays can be found here: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/

1.8 Security Requirements: Contractor personnel performing work under this contract must have United

States citizenship and be able to pass a security screening to obtain green badge clearance at the time of contract performance, and must maintain the level of security required for the life of the contract.

Contractor Employees, in order to gain access to the government facility identified in paragraph 1.7.1 to perform work under this contract, shall comply with the Badging and Access Requirements Attachment to the solicitation/contract.

1.8.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. If the contractor requires use of a computer, the contractor from the COR the PSNS digital media and computer requirements form at least 10 business days prior to the start of onsite services. The contractor shall comply with Shipyard digital media and computer requirements.

1.9 Special Qualifications: Contractor shall be accredited to ISO 17025 by an ILAC recognized accreditation provider.

1.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR

Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.11 Contracting Officer Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the

Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel.

The COR is NOT authorized to change any of the terms and conditions of this contract. Only the warranted Contracting Officer is authorized to make modifications/changes to the terms and conditions of this contract. If the Contractor believes any Government personnel has effectively issued a change resulting in a change in effort and price/cost of the contract, the Contractor shall immediately notify the Contracting Officer in writing.

CORS:

PRIMARY ALTERNATE

Government Technical Points of Contact (TPOC): The TPOC(s) monitors all technical aspects of the contract and assists in contract administration. The TPOC is authorized to perform the following functions:

assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the

Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of

Government furnished property; and provide site entry of Contractor personnel.

The TPOC(s) are NOT authorized to change any of the terms and conditions of this contract. Only the warranted Contracting Officer is authorized to make modifications/changes to the terms and conditions of this contract. If the Contractor believes any Government personnel has effectively issued a change resulting in a change in effort and price/cost of the contract, the Contractor shall immediately notify the Contracting Officer in writing.

TPOCS:

PRIMARY ALTERNATE

1.12 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to execution of this contract.

1.12.1 Identification of Contractor Employees: All contractor personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. All contractor personnel on a government installation will be required to obtain and wear badges in the performance of this contract.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. COMMON DEFINITIONS: Per Clause 52.212-4(e), clause 52.202-1 is incorporated by reference to this contract.

2.2 SPECIAL DEFINITIONS: NA

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: NA

3.2 Facilities: NA

3.3 Utilities: The Government will provide basic utilities for equipment function. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment: NA

3.5 Materials: NA

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services: The contractor shall provide services for:

• Preventative Maintenance; Cleaning and Servicing of all equipment listed. Tasks include, but are not limited to, cleaning and servicing of scope objectives, lenses, and cameras as necessary, servicing turret style objectives as needed for smooth action, inspecting all equipment for damaged components, and repairing of damage as requested and/or required for functionality.

• Calibration of Microhardness Testers; Microhardness testers shall be calibrated by the indirect verification method per ASTM E 92 Annex A1.4 (latest revision). Both the HK and HV scale shall be verified on both microhardness testers. A report/certificate of conformance shall be produced and provide both an as found and as left condition/verification. Cleaning, servicing, and