A3 - SOI Cooter Creek.pdf

PDF 80 KB Posted

Attached to
GAOA Cooter Creek Rd Bridge Replacement (SC) Federal contract opportunity
Solicitation number
12445226Q0029
Issued by
Department of Agriculture Forest Service

About this file

This is a Bid Schedule for a bridge replacement construction project located in Huger, South Carolina on National Forest System Road (NFSR) #202-3.1 at Cooter Creek, managed by the Francis-Marion District. The project encompasses 28 line items organized by specification number, detailing all required construction work and materials.

The bid schedule specifies quantities and units of measure for all contract deliverables across multiple construction phases including mobilization, site preparation, earthwork, structural components, and final restoration. Key material requirements include 725 linear feet of HP 12X53 galvanized steel piles, 30.6 cubic yards of 3000 PSI structural concrete, 420 linear feet of prestressed concrete cored slabs, 620 tons of Class 5 rip rap, 185 tons of aggregate base course, and 1,000 linear feet of earthquake drains. Additional items encompass bridge railings (145 linear feet), guardrails (50 linear feet), turf establishment (0.5 acres), and specialized services including construction survey and staking, contractor sampling and testing, dynamic load testing (2 each), and earthquake drain system design. The measurement methods are designated as either CQ (Contractor Quote) or AQ (Agency Quote), indicating the pricing responsibility for each line item. Unit prices and totals columns are provided but remain blank, awaiting contractor pricing submission.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA Cooter Creek Rd Bridge Replacement (SC), newest first.
File Type Posted
Amendment 01 -12445226Q0029.pdf PDF
A6 - WD Hwy SC Charleston County.pdf PDF
RFQ 12445226Q0029 GAOA Cooter Creek.pdf PDF
A5 - FSSS Bridge Replacements.pdf PDF
A2 - SOW Cooter Creek Bridge.pdf PDF
A1 - RFQ Terms and Conditions 12445226Q0029.pdf PDF
A4 - Cooter Creek Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/17/2026

Francis-Marion

ITEM NO. SPEC NO. DESCRIPTION

METHOD OF

MEASURE

UNIT QUANTITY UNIT PRICE TOTALS

1 151 MOBILIZATION CQ LS 1

2 152 CONSTRUCTION SURVEY AND STAKING CQ LS 1

3 154 CONTRACTOR SAMPLING AND TESTING CQ LS 1

4 155 SCHEDULES FOR CONSTRUCTION CONTRACTS CQ LS 1

5 157 EROSION CONTROL CQ LS 1

6 201 CLEARING AND GRUBBING CQ ACRE 0.4

7 203 REMOVAL OF EXISTING STRUCTURE CQ LS 1

8 204 EXCAVATION AND EMBANKMENT (ROADWAY GRADING) CQ LS 1

9 207 EARTHWORK GEOSYNTHETICS AQ SY 690

10 209

STRUCTURE EXCAVATION AND BACKFILL - COMPACTION

METHOD 2

CQ LS 1

11 251 RIP RAP (CLASS 5) AQ TON 620

12 301

8" AGGREGATE BASE COURSE (PAVEMENT SCHEDULE J) -

COMPACTION METHOD A

AQ TON 185

13 403 ASPHALT SURFACE COURSE (PAVEMENT SCHEDULE C) AQ TON 50

14 403 ASPHALT BINDER AQ TON 5

15 551 HP 12X53 STEEL PILES (GALVANIZED) AQ LF 725

16 552 STRUCTURAL CONCRETE (3000 PSI) AQ CY 30.6

17 553 3'-0" X 2'-0" PRESTRESSED CONCRETE CORED SLABS AQ LF 420

18 554 REINFORCING STEEL - UNCOATED (ABUTMENTS) CQ LB 3418

19 556

BRIDGE RAILING (CONCRETE CURB, REINFORCING STEEL,

STEEL BEAM GUARDRAIL, POSTS, SPACERS, HARDWARE,

ETC.)

AQ LF 145.0

20 564 BEARING DEVICES CQ LS 1

21 617 GUARDRAIL (APPROACH ROADWAY) AQ LF 50

22 617 GREU TYPE TL-2 (APPROACH ROADWAY) AQ EACH 4

23 625 TURF ESTABLISHMENT (PERMANENT) CQ ACRE 0.5

24 635 TEMPORARY TRAFFIC CONTROL CQ LS 1

25 551 DYNAMIC LOAD TESTING CQ EACH 2

26 SS 802A EARTHQUAKE DRAIN SYSTEM DESIGN CQ LS 1

27 SS 802B EARTHQUAKE DRAINS AQ LF 1000

28 SS 801 BRIDGE APPROACH SLABS CQ LS 1

BID SCHEDULE

COOTER CREEK, NFSR # 202-3.1 BRIDGE REPLACEMENT

Bridge Replacement - Huger, SC - NFSR #202-3.1 District:

TOTAL

File details come from the government source that posted it. Updated .