A2+Site+Photographs.pdf
PDF 8 MB Posted
- Attached to
- Asbestos Abatement at the former Renville-Bottineau Memorial Hospital located in Mohall, ND (101 4th Ave SE)
- Solicitation number
- 303-23-005
- Issued by
- Renville County, Montpelier City, North Dakota
About this file
This document is a set of site photographs for the former Renville-Bottineau Memorial Hospital located in Mohall, North Dakota. The photographs depict various rooms and areas of the hospital building, including the main floor, basement, and stairwells, and highlight the presence of asbestos pipe insulation throughout the facility.
The related state and local contract opportunity is for asbestos abatement at the former Renville-Bottineau Memorial Hospital, located at 101 4th Ave SE in Mohall, North Dakota. The contract is being issued by the state of North Dakota, specifically Renville County and Montpelier City. The contract scope includes the abatement of asbestos-containing materials found within the hospital building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Renville+Bottineau+Hosp+Asbestos+IFB.docx | DOCX document | |
| A1+-+Asbestos+and+Hazardous+Mat+Survey.pdf | ||
| A6+-+SFN17987.pdf | ||
| A3+-+Building+Maps.pdf | ||
| A5+-Guidline+12.pdf | ||
| A4+-+PSA.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2 – SITE PHOTOGRAPHS
Former Renville-Bottineau Memorial Hospital Photos
Asbestos Pipe Insulation
Building West Facing Main Entrance
Building Southwest Facing
Building Southeast Facing
Building East Facing
Building Northeast Facing
Building North Facing
Building Northeast Facing
Main Floor Room M1
Main Floor Room M1 Adjacent Bathroom
Main Floor Room M1- Asbestos Pipe Insulation
Main Floor Room M25
Main Floor Room M25- Asbestos Pipe Insulation
Main Floor North-South Hallway
Main Floor Room M4
Main Floor Room M7
Main Floor Room M8
Main Floor Room M9
Main Floor Room M9
Main Floor Room M10
Main Floor East-West Hallway
Main Floor Room M15
Main Floor Room M15- Looking East
Main Floor Room M17
Main Floor East-West Hallway Annex
Main Floor Room M18
Main Floor Room M18- Asbestos Pipe Insulation
Main Floor Room M19
Main Floor Room M19- Asbestos Pipe Insulation
Main Floor Room M20
Main Floor Room M21
Main Floor Room M23- Old X-ray Room
Main Floor Room M24
Main Floor Stairwell to Basement
Main Floor Stairwell to Basement- Asbestos Pipe Insulation and Entrance to North Steam Tunnel
Main Floor Stairwell to 2nd Floor
Basement Hallway by Elevator
Basement Room B7
Basement Room B7- Asbestos Pipe Insulation
Basement Room B7- Asbestos Pipe Insulation and Entrance to South Steam Tunnel
Basement Room B1- Asbestos Pipe Insulation
Basement Room B1- Asbestos Pipe Insulation and Entrance to South Steam Tunnel
Basement East-West Hallway
Basement Room B6
Basement Room B5
Basement Room B4
Basement Room B2
Basement Room B3- Asbestos Pipe Insulation
File details come from the government source that posted it. Updated .