This document is a table of contents for construction specifications for the St. Croix WMD RV Pad project. The specifications cover general requirements, administrative requirements, project coordination, quality requirements, definitions and standards, product requirements, and project closeout for various construction divisions including plumbing, electrical, earthwork, utilities, and site work. Relevant specifications include medium-voltage cables, conduit, enclosed circuit breakers, geosynthetics, excavation, fill, site water and sanitary sewer piping, and septic tanks. The related federal contract opportunity is solicitation number 140FC224Q0003 for the St. Croix WMD RV Pad project through the Department of the Interior Fish and Wildlife Service.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
23-081 TABLE OF CONTENTS Page 1 St. Croix WMD RV Pad 7/6/2023
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01-10-00 SUMMARY
01-30-00 ADMINISTRATIVE REQUIREMENTS
01-31-00 PROJECT COORDINATION
01-40-00 QUALITY REQUIREMENTS
01-42-00 DEFINITIONS AND STANDARDS
01-60-00 PRODUCT REQUIREMENTS
01-77-00 PROJECT CLOSEOUT
DIVISION 22 - PLUMBING
22-05-53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
DIVISION 26 - ELECTRICAL
26-05-13 MEDIUM-VOLTAGE CABLES
26-05-33.13 CONDUIT FOR ELECTRICAL SYSTEMS
26-05-53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26-28-16.13 ENCLOSED CIRCUIT BREAKERS
DIVISION 31 - EARTHWORK
31-05-19 GEOSYNTHETICS FOR EARTHWORK
31-10-00 SITE CLEARING
31-23-16 EXCAVATION
31-23-23 FILL
DIVISION 33 - UTILITIES
33-14-16 SITE WATER UTILITY DISTRIBUTION PIPING
33-31-13 SITE SANITARY SEWERAGE GRAVITY PIPING
33-34-13 SEPTIC TANKS