This document package includes specifications for a federal construction contract opportunity to install a gravel recreational vehicle drive and pad with utility connections at the St. Croix Wetland Management District in Wisconsin. Key requirements include installing both copper water and electrical lines from an adjacent quarters building to a new utility pole at the RV pad. There are also additive options to connect the water line to a hose bib, install and connect power lines from the building to the pad pole, design and install a 1,500 gallon septic holding tank and drain lines, construct the gravel drive and pad, and build a six foot wood privacy fence along the pad site. The specifications cover site clearing, excavation, fill, geosynthetics, conduit, wiring, water distribution piping, sanitary sewer piping, septic tanks, and other site civil and utility work.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
23-081 / St. Croix WMD RV Pad 01-10-00 - 1 SUMMARY
SECTION 01-10-00
SUMMARY
PART 1 GENERAL
1.01 PROJECT TITLE
A. St. Croix WMD - RV Pad Summary: Install gravel RV drive and pad with water and electric supplies/connections, services from existing adjacent Quarters building, install septic holding tank with utility line.
1.02 WORK UNDER THESE SPECIFICATIONS
A. Contractor shall furnish materials, labor, equipment and supervision for the work described below in the base bid and bid additives:
1. Base Bid: Installation of both copper water line from outside Quarters building, and electrical conduit from Quarters building circuit panel, and both connecting, to installed utility pole at RV pad. Cap lines if Additive #1 is not selected..
2. Bid Additive #1: Connect water line to buliding hose bib with removeable flexible hose, including fittings for a full operational water system. Install and connect electrical power conductor lines from building circuit breaker panel, add 50 A circuit breaker, to pad utility pole receptacles, via base bid conduit.
3. Bid Additive #2: Design, supply and install a sanitary system including a 1,500 Gal. holding tank and drain lines from RV pad.
4. Bid Additive #3: Install gravel drive and RV gravel pad from 3/4-inch aggregate per WI DOT Construction Standards #305.
5. Bid Additive #4: Construct 6 foot wood privacy fence along RV pad site only per documents.
1.03 LOCATION AND INSPECTION OF SITE
A. The work site is located within the St. Croix Wetland Management District, Station Office, in
New Richmond, WI.
B. The mailing address of the Refuge is shown on the Solicitation, Offer, and Award (Standard
Forms 1442 or, 18 block 9) as attached to this Invitation. The Station Manager may be contacted for further information at the above referenced address or by telephone at (715) 246-7784.
C. All prospective bidders/quoters, contractors, subcontractors, and related persons are strongly encouraged to visit the site of the proposed Work and to assess the location and extent of the Work prior to submitting bids.
1.04 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
A. The successful bidder will be provided, upon request, addition digital copies of the contract drawings as necessary for execution of this contract. These copies will be provided at no additional cost to the successful bidder/quoter.
B. In case of difference between drawings and specifications, the most stringent shall govern.
1.05 WORK NOT INCLUDED IN THIS CONTRACT
A. All items indicated "NIC" on drawings or in specifications are items not included in this contract.
B. Work in place is generally shown as "Existing" on the Contract Drawings.
1.06 ITEMS PROVIDED BY THE GOVERNMENT
A. Unless specifically provided herein, no materials or equipment shall be furnished by the
Government under this Contract.
1.07 GOVERNMENTING SERVICES:
A. No baseline or benchmark will be provided for interior work of base bid.
23-081 / St. Croix WMD RV Pad 01-10-00 - 2 SUMMARY
1.08 TEMPORARY FACILITIES
A. Maintain and restore all government roads, service areas and utilities used to pre-construction condition.
B. Toilet facilities, water, and electric will be provided by the Contractor to complete the Work of this project.
1.09 SITE ACCESS AND RIGHT OF WAY
A. The construction access limits on Government property will be established by the Government and the Contractor shall be responsible for complying with these limits and governing all Work accordingly. All temporary access roads shall be removed following work completion unless directed otherwise by the Contracting Officer.
B. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to insure bidders are aware of any requirements of the local entity. These requirements are between the entity and the bidder.
If the Contractor proposes to cross private property, permission must be obtained from the owner to use private property or roads in the conduct of the Work.
C. Work scheduled on Saturdays, Sundays, Federal Holidays or other than normal working hours shall be approved in writing in advance by the Government.
1.10 SAFETY - IN ADDITION TO FAR 52.236-13 ACCIDENT PREVENTION
A. A. Contractor shall fill out and submit the “Preconstruction Safety Checklist” to the Contracting
Officer (CO) prior to beginning construction.
B. The contractor shall designate a safety officer to ensure a safe work site. The safety officer shall perform daily work site inspections to assure compliance with all safety regulations and standards.
C. The Contractor’s Safety Plan shall be available on-site. The Contractor shall provide Safety Data Sheets (SDS) for all hazardous materials brought on-site. SDS shall be made available in a conspicuous location.
D. All equipment and work activities shall comply with OSHA regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements. Additionally, a copy of any accident report shall be provided to the Contracting Officer.
E. The Contractor shall provide and install barricades, signs, or other warning devices to delineate the construction area and restrict public access to the construction site. Follow the Manual of Uniform Traffic Control Devices (MUTCD).
F. Provide at least one non-freezing-type fire extinguisher in each workshop and shed used for storage on the premises. Place in location readily accessible to workers.
G. Provide at least one non-freezing-type fire extinguisher of the appropriate class for each group of workers performing flammable procedures.
H. Provide and maintain a basic first aid kit for use of workers.
1. Provide first aid supply commensurate with size of project with items necessary for first aid treatment of all injuries. Include first aid items identified on SDS for applicable items, in applicable locations.
2. Advise all workers of the location of first aid supplies.
3. Post telephone numbers of nearest hospital or ambulance service and fire station in conspicuous location. Advise all workers of location of telephone numbers.
I. Provide necessary Personnel Protective Equipment (PPE) as identified by SDS. Provide documentation workers have been trained in use of PPE prior to individual use.
J. Contractor is required to maintain a spill containment kit, per OSHA standards, to respond to hazardous waste release/contamination ( eg. gas spill, equipment hydraulic leak, etc.) during the construction project. Any contamination is required to be identified to Government personnel for monitoring and cleanup coordination.
23-081 / St. Croix WMD RV Pad 01-10-00 - 3 SUMMARY
1. If more than 5 gallons of contamination is released Contractor is also required to notify Minnesota EPA in addition to Government personnel.
PART 2 PRODUCTS - NOT APPLICABLE
PART 3 EXECUTION - NOT APPLICABLE
END OF SECTION
23-081 / St. Croix WMD RV Pad 01-30-00 - 1 ADMINISTRATIVE
REQUIREMENTS
SECTION 01-30-00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 GENERAL:
A. Refer to submittal register or technical specifications for all submittals required.
B. When specifically requested by the Contracting Officer (CO), Contractor’s Officer’s
Representative (COR) or the Government’s Construction Inspector, the Contractor shall provide copies of manufacturer's written installation instructions and/or recommendations for review and approval prior to accomplishing equipment installation.
1.02 SUBMITTALS
A. A submittal register, listing items requiring submittals under this solicitation, is provided as an attachment to this document for reference. This listing is a minimum to be submitted by the Contractor, each specification section will have precedence over this listing. A working copy will be provided at the preconstruction conference.
B. The Contractor shall provide all required submittals to the COR within 15 days of award except for items noted otherwise on the submittal register.
C. Furnish a one digital copy of all required submittals. One digital copy will be retained by the Government. One digital copy will be returned to the Contractor.
D. The approval of submittals shall not relieve the Contractor to comply with the terms and conditions of the Contract Drawings and Specifications. The Contractor shall be responsible to determine correct dimension, design, connection, detail and satisfactory construction of all Work.
E. A submittal coversheet will be provided by the Government to be used for each and every submittal. Contractor is to provide submittals under each specification section complete with all requirements included. Partial submissions will be returned not reviewed.
1.03 PROJECT SCHEDULE
A. Contractor shall provide as required by Federal Acquisition Regulation (FAR) clauses. *
1.04 PRICE BREAKDOWN - LUMP SUM ITEMS
A. Contractor shall provide as required by FAR clauses. *
1.05 SUBCONTRACTOR'S LIST
A. Submit a list of subcontractors who will be working on the project.
1.06 SUBMITTAL OF PROGRESS PAYMENT CERTIFICATE
A. Contractor shall provide as required by FAR clauses. *
1.07 GUARANTEES, WARRANTIES AND CERTIFICATES
A. Refer to Section 01-77-00.
1.08 OPERATING AND MAINTENANCE INSTRUCTION
A. Refer to Section 01-77-00.
1.09 DELIVERY TICKETS
A. The Contractor shall submit to the Government's on site representative, one legible copy of each delivery ticket for all material delivered to the construction site.
B. The delivery ticket shall show brand name, catalog number, and number of items received.
1.10 WASTE MANIFESTS
A. The Contractor shall submit copies of all waste manifests.
B. Manifests shall state type of waste (i.e., construction debris, hazardous asbestos, etc.), location of disposal, landfill designation, EPA registration of landfill, and EPA registration for transportation of any hazardous wastes.
23-081 / St. Croix WMD RV Pad 01-30-00 - 2 ADMINISTRATIVE
REQUIREMENTS
PART 2 PRODUCTS - NOT APPLICABLE
PART 3 EXECUTION - NOT APPLICABLE
* THE APPLICABLE FAR CLAUSES WILL BE PROVIDE IN FULL TEXT TO THE RESULTANT
CONTRACTOR AT THE PRE-CONSTRUCTION CONFERENCE.
23-081 / St. Croix WMD RV Pad 01-31-00 - 1 PROJECT COORDINATION
SECTION 01-31-00
PROJECT COORDINATION
PART 1 GENERAL
1.01 JOBSITE COORDINATION
A. Superintendence, Subcontract administration and Quality Control, is the responsibility of the Contractor.
B. Final decisions relative to items in conflict shall be made by the Contracting Officer.
C. The Government shall have the authority to temporarily suspend the Work for such time as necessary because of the failure on the part of the Contractor to perform any of the provisions of the Contract. No extension of contract performance time will be permitted until the Government determines that the deficiencies in performance, which caused the temporary suspension, have been corrected.
D. The Contractor shall have responsible superintendence on site during all project operations.
Contractor shall notify Government of any changes of superintendents.
E. The Contractor shall notify the COR at least ten (10) days prior to the anticipated date of completion of all Work specified herein. Upon completion of the Work, the COR shall proceed with the final inspection which shall be completed as promptly as practicable. The time required for such inspection and for performing any corrective Work shall be included in the contract performance time.
1.02 MODIFICATION/CHANGE ORDER PROCEDURES
A. In the event of the need for a Change Order, the Contractor will receive a letter requesting a price quote for proposed changes to the Contract.
B. For evaluation purposes, the Contractor's quote shall be broken down to show the costs of labor and materials for each proposed category of Work included with the change, along with the total cost for Contractor's overhead, profit, and bond for the proposed changes.
C. All Contract time extensions required as a result of a proposed change must be justified and supported in detail at the time of the proposal.
1.03 PROJECT MEETINGS
A. Periodic general project meetings will be conducted with a representative of the Contractor at the project site or by telephone by the Government's representative for the purpose of coordinating, expediting, and assessing the work progress.
B. The Contractor shall provide reports of progress on the project, discuss the work schedule for the coming period and present all conflicts, discrepancies or other difficulties for resolution. A record of discussions and decisions will be prepared by the Government and distributed to those attending and others affected.
PART 3 EXECUTION- NOT APPLICABLE
23-081 / St. Croix WMD RV Pad 01-40-00 - 1 QUALITY REQUIREMENTS
SECTION 01-40-00
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. References and standards.
B. Testing and inspection agencies and services.
C. Tolerances.
D. Defect Assessment.
E. Contractor's Experience.
1.02 RELATED REQUIREMENTS
A. Section 01-30-00 - Administrative Requirements: Submittal procedures.
B. Section 01-42-00 - Definitions and Standards.
1.03 SUBMITTALS
A. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Engineer, in quantities specified for Product Data.
1. Indicate material or product complies with or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
B. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, adjusting, and finishing, for the Govenment's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
1.04 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.
C. Should specified reference standards conflict with Contract Documents, request clarification from Engineer before proceeding.
D. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Engineer shall be altered from Contract Documents by mention or inference otherwise in any reference document.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from
Engineer before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
23-081 / St. Croix WMD RV Pad 01-40-00 - 2 QUALITY REQUIREMENTS
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract
Documents, request clarification from Engineer before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
23-081 / St. Croix WMD RV Pad 01-42-00 - 1 DEFINITIONS AND STANDARDS
SECTION 01-42-00
DEFINITIONS AND STANDARDS
PART 1 GENERAL
1.01 REGULATORY REQUIREMENTS
A. All work shall be accomplished in strict accordance with OSHA and all other regulations, codes, and laws in effect at the time the work is performed for the location where it is to be performed.
1.02 MEANS AND METHODS
A. Means and methods used in the performance of this Contract must be in accordance with all applicable Federal Acquisition Regulations in addition to OSHA regulations, 29 Code of Federal Regulations, acceptable industry practices as recognized by societies, associations, building codes, manufacturers’ specifications and any applicable state safety and health requirements.
1.03 PERMITS
A. All permits required to support construction activities such as road permits for oversize, overweight vehicles and equipment, bridge permits, and utility hookup permits, shall be obtained and paid for by the Contractor.
PART 2 PRODUCTS - NOT APPLICABLE
PART 3 EXECUTION - NOT APPLICABLE
23-081 / St. Croix WMD RV Pad 01-60-00 - 1 PRODUCT REQUIREMENTS
SECTION 01-60-00
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Transportation, handling, storage and protection.
B. Product option requirements.
C. Substitution limitations and procedures.
D. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 RELATED REQUIREMENTS
A. Section 01-10-00 - Summary:
B. Section 01-40-00 - Quality Requirements: Product quality monitoring.
1.03 REFERENCE STANDARDS
A. 16 CFR 260 - Guides for the Use of Environmental Marketing Claims; Federal Trade
Commission; current edition.
1.04 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
PART 2 PRODUCTS
2.01 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by the Contract Documents.
B. Do not use products having any of the following characteristics:
1. Made using or containing CFC's or HCFC's.
2. Made of wood from newly cut old growth timber.
3. All products being installed in the building shall be free of asbestos. Contractor will be responsible for all costs of removing products that are found to contain asbestos.
C. Where all other criteria are met, Contractor shall give preference to products that:
1. Use materials that are extracted or harvested and manufactured closer to the location of the project.
2. Have longer documented life span under normal use.
3. Result in less construction waste.
2.02 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description if specified product is not available.
B. Products Specified by Naming One or More Manufacturers: The use of brand name items is to establish a standard of quality only and shall not be construed as limiting competition or precluding the Contactor from offering an equal item(s) from another sources(s). Any brand name intended to be a restriction to a sole sources shall be clearly identified as "No substitutions".
2.03 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.
23-081 / St. Croix WMD RV Pad 01-60-00 - 2 PRODUCT REQUIREMENTS
B. Deliver to Project site; obtain receipt prior to final payment.
PART 3 EXECUTION
3.01 TRANSPORTATION AND HANDLING
A. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
B. Transport and handle products in accordance with manufacturer's instructions.
C. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.
D. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
E. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.
F. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.02 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.
B. Store and protect products in accordance with manufacturers' instructions.
C. Store with seals and labels intact and legible.
D. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
G. Prevent contact with material that may cause corrosion, discoloration, or staining.
H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
23-081 / St. Croix WMD RV Pad 01-77-00 - 1 PROJECT CLOSEOUT
SECTION 01-77-00
PROJECT CLOSEOUT
PART 1 GENERAL
1.01 MANUFACTURER'S SPECIFICATIONS
A. The installation of manufactured products and equipment, together with all associated parts, shall be in conformance with the manufacturer's recommendations, and code requirements. All installations shall be complete and ready for immediate use, and every part required for proper operation of the manufacturer's equipment shall be provided. Following the completion of the Work under this Contract, all installed equipment shall be tested for proper operation and compliance with the Contract.
1.02 FINAL INSPECTION
A. The Contractor shall request a final inspection in writing at least ten (10) days prior to the anticipated date of completion.
B. Work will not be considered ready for final inspection until all the Work has been completed and the Contractor has certified that all items are properly operating and in strict compliance with all Contract terms and conditions.
C. The Contractor or the project supervisor shall be at the job site during the final inspection.
1.03 RECORD DRAWINGS:
A. The Contractor shall provide and maintain in proper order and in good, clean condition, at the project site, one (1) complete set of full size prints of all Drawings. On this set, with red pencil or ink, the Contractor will neatly inscribe all changes in Work. At time of final acceptance, and prior to final payment, these corrected prints will be presented to the COR. The Contractor will note all data and changes on these record drawings in sufficient detail and clarity to provide information necessary for preparation of "as built" drawings by the Government.
1.04 GUARANTEES, WARRANTIES AND CERTIFICATES
A. The Contractor will submit all guarantees, warranties and certificates to the Government prior to final payment.
B. The Government requires a 100% warranty for a period of one full year after final acceptance.
Items of Work found defective during the warranty period will be replaced at no cost to the Government and the warranty for that particular part of the Work shall automatically extend for one full year beyond the completion date of repairs.
C. If a manufacturer or supplier offers a guarantee in excess of the one year requirement outlined herein, then the longer guarantee period will apply for those particular items.
PART 3 EXECUTION - NOT APPLCABLE
23-081 / St. Croix WMD RV Pad 22-05-53 - 1 IDENTIFICATION FOR
PLUMBING PIPING AND
EQUIPMENT
SECTION 22-05-53
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Underground warning tape.
1.02 SUBMITTALS
A. See Section 01-30-00 - Administrative Requirements for submittal procedures.
B. Product Data: Provide manufacturers catalog literature for each product required.
PART 2 PRODUCTS
2.01 PLUMBING COMPONENT IDENTIFICATION GUIDELINE
2.02 UNDERGROUND WARNING TAPE
A. Materials: Use foil-backed detectable type polyethylene tape suitable for direct burial, unless otherwise indicated.
B. Foil-backed Detectable Type Tape: 3 inches wide, with minimum thickness of 5 mil, 0.005 inch, unless otherwise required for proper detection.
C. Legend: Type of service, continuously repeated over full length of tape.
D. Color:
1. Per Manufacturer.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install tape 12" below grade and directly over pipe noted on drawings.
23-081 / St. Croix WMD RV Pad 26-05-13 - 1 MEDIUM-VOLTAGE CABLES
SECTION 26-05-13
MEDIUM-VOLTAGE CABLES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Medium voltage cable.
1.02 RELATED REQUIREMENTS
A. Section 26-05-53 - Identification for Electrical Systems.
1.03 REFERENCE STANDARDS
A. IEEE C2 - National Electrical Safety Code; 2017.
B. NEMA WC 70 - Power Cables Rated 2000 Volts or Less for the Distribution of Electrical Energy;
2021.
C. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
1.04 SUBMITTALS
A. See Section 01-30-00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide for cable, terminations, and accessories.
1.05 QUALITY ASSURANCE
A. Comply with NFPA 70.
B. Products: Listed, classified, and labeled as suitable for the purpose intended.
PART 2 PRODUCTS
2.01 MEDIUM-VOLTAGE CABLE
A. Medium Voltage Cable: NEMA WC 70 rubber insulated cable.
1. Conductor: Copper, compact round, stranded, with foil conductor shield.
2. Insulation Jacket: PVC, ____ mils minimum thickness.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that conduit are ready to receive cable.
B. Cable routing is shown in approximate locations unless dimensioned. Route as required to complete wiring system.
3.02 INSTALLATION
A. Avoid abrasion and other damage to cables during installation.
B. Use suitable lubricants and pulling equipment.
C. Sustain cable pulling tensions and bending radii below recommended limits.
D. Ground cable shield at each termination and splice.
3.03 FIELD QUALITY CONTROL
A. See Section 01-40-00 - Quality Requirements, for additional requirements.
23-081 / St. Croix WMD RV Pad 26-05-33.13 - 1 CONDUIT FOR ELECTRICAL
SYSTEMS
SECTION 26-05-33.13
CONDUIT FOR ELECTRICAL SYSTEMS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Galvanized steel electrical metallic tubing (EMT).
B. Rigid polyvinyl chloride (PVC) conduit.
1.02 RELATED REQUIREMENTS
A. Section 26-05-53 - Identification for Electrical Systems: Identification products and requirements.
B. Section 31-23-16.13 - Trenching: Excavating, bedding, and backfilling.
C. Section 31-23-23 - Fill: Bedding and backfilling.
1.03 REFERENCE STANDARDS
A. ANSI C80.3 - American National Standard for Electrical Metallic Tubing -- Steel (EMT-S); 2020.
B. NEC, Current version.
C. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2015.
D. NEMA TC 2 - Electrical Polyvinyl Chloride (PVC) Conduit; 2020.
E. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
F. UL 514B - Conduit, Tubing, and Cable Fittings; Current Edition, Including All Revisions.
G. UL 651 - Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings; Current Edition, Including All Revisions.
H. UL 797 - Electrical Metallic Tubing-Steel; Current Edition, Including All Revisions.
1.04 SUBMITTALS
A. See Section 01-30-00 - Administrative Requirements for submittals procedures.
B. Product Data: Provide manufacturer's standard catalog pages and data sheets for conduits and fittings.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Receive, inspect, handle, and store conduit and fittings in accordance with manufacturer's instructions.
PART 2 PRODUCTS
2.01 CONDUIT APPLICATIONS
A. Do not use conduit and associated fittings for applications other than as permitted by NFPA 70, manufacturer's instructions, and product listing.
B. Unless otherwise indicated and where not otherwise restricted, use conduit types indicated for specified applications. Where more than one listed application applies, comply with most restrictive requirements. Where conduit type for particular application is not specified, follow
NEC.
C. Underground:
1. Exterior, Direct-Buried: Use rigid PVC conduit.
2. Where rigid polyvinyl chloride (PVC) conduit is provided, transition to schedule 80 rigid
PVC conduit where emerging from underground.
D. Interior, Damp or Wet Locations: Use galvanized steel electrical metallic tubing (EMT).
2.02 CONDUIT - GENERAL REQUIREMENTS
A. Comply with NFPA 70.
B. Provide products listed, classified, and labeled as suitable for purpose intended.
23-081 / St. Croix WMD RV Pad 26-05-33.13 - 2 CONDUIT FOR ELECTRICAL
C. Minimum Conduit Size, Unless Otherwise Indicated:
1. Branch Circuit Homeruns: 1-1/2-inch trade size.
2. Underground, Exterior: 1-1/2-inch trade size.
2.03 GALVANIZED STEEL ELECTRICAL METALLIC TUBING (EMT)
A. Description: NFPA 70, Type EMT galvanized steel electrical metallic tubing complying with
ANSI C80.3 and listed and labeled as complying with UL 797.
B. Fittings:
1. Description: Fittings complying with NEMA FB 1 and listed and labeled as complying with
UL 514B.
2. Material: Use steel or malleable iron.
3. Connectors and Couplings: Use compression/gland or set-screw type.
a. Do not use indenter type connectors and couplings.
2.04 RIGID POLYVINYL CHLORIDE (PVC) CONDUIT
A. Description: NFPA 70, Type PVC rigid polyvinyl chloride conduit complying with NEMA TC 2 and listed and labeled as complying with UL 651; Schedule 40 unless otherwise indicated, Schedule 80 where subject to physical damage; rated for use with conductors rated 90 degrees C.
B. Fittings:
1. Manufacturer: Same as manufacturer of conduit to be connected.
2. Description: Fittings complying with NEMA TC 3 and listed and labeled as complying with
UL 651; material to match conduit.
2.05 ACCESSORIES
A. Solvent Cement for PVC Conduit and Fittings: As recommended by manufacturer of conduit and fittings to be installed.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that mounting surfaces are ready to receive conduits.
B. Verify that conditions are satisfactory for installation prior to starting work.
3.02 INSTALLATION
A. Install products in accordance with manufacturer's instructions.
B. Install conduit in accordance with NECA 1.
C. Install rigid polyvinyl chloride (PVC) conduit in accordance with NECA 111.
D. Conduit Routing:
1. Unless dimensioned, conduit routing indicated is diagrammatic.
2. When conduit destination is indicated without specific routing, determine exact routing required.
3. Conduits installed underground or embedded in concrete may be routed in shortest possible manner unless otherwise indicated. Route other conduits parallel or perpendicular to building structure and surfaces, following surface contours where practical.
4. Arrange conduit to provide no more than equivalent of four 90-degree bends between pull points.
a. Add pull box if exceed 360-dgree of bending.
E. Connections and Terminations:
1. Use suitable adapters where required to transition from one type of conduit to another.
2. Provide insulating bushings, insulated throats, or listed metal fittings with smooth, rounded edges at conduit terminations to protect conductors.
3. Secure joints and connections to provide mechanical strength and electrical continuity.
F. Penetrations:
https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ANSI%20C80.3 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ANSI%20C80.3 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ANSI%20C80.3 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20514B http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20514B http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20514B http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20514B http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20514B http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20514B http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651
23-081 / St. Croix WMD RV Pad 26-05-33.13 - 3 CONDUIT FOR ELECTRICAL
1. Do not penetrate or otherwise notch or cut structural members, including footings and grade beams, without approval of Engineer.
2. Make penetrations perpendicular to surfaces unless otherwise indicated.
3. Provide sleeves for penetrations as indicated or as required to facilitate installation. Set sleeves flush with exposed surfaces unless otherwise indicated or required.
4. Where conduits penetrate waterproof membrane, seal as required to maintain integrity of membrane.
G. Underground Installation:
1. Minimum Cover, Unless Otherwise Indicated or Required:
a. Underground, Exterior: 24 inches.
2. Provide underground warning tape along entire conduit length; see Section 26-05-53.
H. Conduit Movement Provisions: Where conduits are subject to movement, provide expansion and expansion/deflection fittings to prevent damage to enclosed conductors or connected equipment. This includes, but is not limited to:
1. Where conduits are subject to earth movement by settlement or frost.
I. Conduit Sealing:
1. Use foam conduit sealant to prevent entry of moisture and gases. This includes, but is not limited to:
a. Where conduits enter building from outside.
3.03 FIELD QUALITY CONTROL
A. See Section 01-40-00 - Quality Requirements for additional requirements.
B. Correct deficiencies and replace damaged or defective conduits.
END OF SECTION
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=UL%20651
23-081 / St. Croix WMD RV Pad 26-05-53 - 1 IDENTIFICATION FOR
ELECTRICAL SYSTEMS
SECTION 26-05-53
IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Electrical identification requirements.
B. Wire and cable markers.
C. Underground warning tape.
1.02 SUBMITTALS
A. See Section 01-30-00 - Administrative Requirements for submittals procedures.
B. Product Data: Provide manufacturer's standard catalog pages and data sheets for each product.
PART 2 PRODUCTS
2.01 IDENTIFICATION REQUIREMENTS
A. Identification for Conductors and Cables:
1. Use wire and cable markers to identify circuit number or other designation indicated for power, control, and instrumentation conductors and cables at the following locations:
a. At each source and load connection.
2.02 WIRE AND CABLE MARKERS
A. Markers for Conductors and Cables: Use wrap-around self-adhesive vinyl cloth type markers suitable for the conductor or cable to be identified.
B. Legend: Power source and circuit number or other designation indicated.
C. Minimum Text Height: 1/8 inch.
D. Color: Black text on white background unless otherwise indicated.
2.03 UNDERGROUND WARNING TAPE
A. Materials: Use foil-backed detectable type polyethylene tape suitable for direct burial, unless otherwise indicated.
B. Foil-backed Detectable Type Tape: 3 inches wide, with minimum thickness of 5 mil, unless otherwise required for proper detection.
C. Legend: Type of service, continuously repeated over full length of tape.
D. Color:
1. Per Manufacturer.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install products in accordance with manufacturer's instructions.
B. Install underground warning tape above buried lines with one tape per trench at 12 inch(es) below finished grade.
3.02 FIELD QUALITY CONTROL
A. See Section 01-40-00 - Quality Requirements, for additional requirements.
23-081 / St. Croix WMD RV Pad 26-28-16.13 - 1 ENCLOSED CIRCUIT
BREAKERS
SECTION 26-28-16.13
ENCLOSED CIRCUIT BREAKERS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Enclosed circuit breakers.
1.02 RELATED REQUIREMENTS
A. Section 26-05-53 - Identification for Electrical Systems: Identification products and requirements.
1.03 REFERENCE STANDARDS
A. FS W-C-375 - Circuit Breakers, Molded Case; Branch Circuit and Service; 2013e (Amended
2017).
B. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2015.
C. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
D. UL 489 - Molded-Case Circuit Breakers, Molded-Case Switches and Circuit Breaker
Enclosures; Current Edition, Including All Revisions.
E. UL 943 - Ground-Fault Circuit-Interrupters; Current Edition, Including All Revisions.
F. UL 1053 - Ground-Fault Sensing and Relaying Equipment; Current Edition, Including All
Revisions.
1.04 SUBMITTALS
A. See Section 01-30-00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide manufacturer's standard catalog pages and data sheets for circuit breakers, enclosures, and other installed components and accessories.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Schneider Electric; Square D Products: www.schneider-electric.us/#sle.
2.02 ENCLOSED CIRCUIT BREAKERS
A. Description: Units consisting of molded case circuit breakers individually mounted in enclosures.
B. Provide products listed, classified, and labeled as suitable for the purpose intended.
C. Unless otherwise indicated, provide products suitable for continuous operation under the following service conditions:
1. Altitude: Less than 6,600 feet.
2. Ambient Temperature: Between 23 degrees F and 104 degrees F.
D. Conductor Terminations: Suitable for use with the conductors to be installed.
E. Provide solidly bonded equipment ground bus in each enclosed circuit breaker, with a suitable lug for terminating each equipment grounding conductor.
F. Ground Fault Protection: Where ground-fault protection is indicated, provide system listed and labeled as complying with UL 1053.
2.03 MOLDED CASE CIRCUIT BREAKERS
A. Description: Quick-make, quick-break, over center toggle, trip-free, trip-indicating circuit breakers listed and labeled as complying with UL 489, and complying with FS W-C-375 where applicable; ratings, configurations, and features as indicated on the drawings.
B. Interrupting Capacity:
1. Provide circuit breakers with interrupting capacity as required to provide the short circuit current rating indicated.
23-081 / St. Croix WMD RV Pad 26-28-16.13 - 2 ENCLOSED CIRCUIT
BREAKERS
C. Conductor Terminations:
1. Provide mechanical lugs unless otherwise indicated.
2. Lug Material: Aluminum, suitable for terminating aluminum or copper conductors.
D. Provide the following circuit breaker types where indicated:
1. Ground Fault Circuit Interrupter (GFCI) Circuit Breakers: Listed as complying with UL 943, class A for protection of personnel.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that the ratings of the enclosed circuit breakers are consistent with the indicated requirements.
B. Verify that mounting surfaces are ready to receive enclosed circuit breakers.
C. Verify that conditions are satisfactory for installation prior to starting work.
3.02 INSTALLATION
A. Install products in accordance with manufacturer's instructions.
B. Perform work in accordance with NECA 1 (general workmanship).
C. Arrange equipment to provide minimum clearances in accordance with manufacturer's instructions and NFPA 70.
D. Install enclosed circuit breakers plumb.
E. Identify enclosed circuit breakers in accordance with Section 26-05-53.
3.03 FIELD QUALITY CONTROL
A. See Section 01-40-00 - Quality Requirements, for additional requirements.
B. Test GFCI circuit breakers to verify proper operation.
C. Correct deficiencies and replace damaged or defective enclosed circuit breakers.
23-081 / St. Croix WMD RV Pad 31-05-19 - 1 GEOSYNTHETICS FOR
EARTHWORK
SECTION 31-05-19
GEOSYNTHETICS FOR EARTHWORK
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Geotextile for separation.
1.02 RELATED REQUIREMENTS
A. Section 31-10-00 - Site Clearing.
1.03 REFERENCE STANDARDS
A. AASHTO M 288 - Standard Specification for Geosynthetic Specification for Highway Applications; 2021.
B. ASTM D4355/D4355M - Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture, and Heat in a Xenon Arc-Type Apparatus; 2021.
C. ASTM D4533/D4533M - Standard Test Method for Trapezoid Tearing Strength of Geotextiles;
2015.
D. ASTM D4632/D4632M - Standard Test Method for Grab Breaking Load and Elongation of Geotextiles; 2015a.
E. ASTM D4833/D4833M - Standard Test Method for Index Puncture Resistance of Geomembranes, and Related Products; 2007 (Reapproved 2020).
F. ASTM D4873/D4873M - Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples; 2017 (Reapproved 2021).
G. ASTM D5199 - Standard Test Method for Measuring the Nominal Thickness of Geosynthetics;
2012 (Reapproved 2019).
1.04 SUBMITTALS
A. See Section 01-30-00 - Administrative Requirements for submittal procedures.
B. Product Data: Manufacturer's data on each product to be used, including physical properties, seaming materials, and installation instructions.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with at least three years of documented experience.
1.06 DELIVERY, STORAGE, AND HANDLING
A. See Section 01-60-00 - Product Requirements for additional requirements.
B. Identify, store, and handle geosynthetic rolls and samples according to ASTM D4873/D4873M.
C. Protect materials from sunlight and other ultraviolet light sources during storage.
D. Handle geosynthetics with care and prevent dragging, dropping, or imbalanced lifting.
1.07 FIELD CONDITIONS
A. Temperature Requirements: Do not place geosynthetic when ambient air or base surface temperature is less than 40 degrees F or above 140 degrees F (60 degrees C).
B. Follow recommendations of geosynthetic manufacturer.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Agri Drain Corporation: www.agridrain.com, 6 OZ. Engineering Fabric.
B. Other manufacturers meeting specifications, final decision of acceptance by Engineer.
2.02 GEOSYNTHETIC
A. Provide geosynthetic in largest size sheets as possible to minimize field joining.
23-081 / St. Croix WMD RV Pad 31-05-19 - 2 GEOSYNTHETICS FOR
B. Uniform thickness according to ASTM D5199.
2.03 GEOTEXTILE
A. General:
1. Material: Polyethylene consisting of 5 percent maximum regrind and free of contaminants.
B. Geotextile for Separation: Capable of restricting adjacent material mixing.
1. Type: Nonwoven.
2. Seams: Loose laid.
a. Overlap:
1) 12 inches (300 mm), minimum, in all directions.
3. Grab Strength: 160 lb (0.711 kN), minimum, when tested in accordance with ASTM D4632/D4632M.
4. Puncture Strength: 410 lb (1.82 kN), minimum, when tested in accordance with ASTM D4833/D4833M.
5. Trapezoid Tear Strength: 60 lb (0.267 kN), minimum, when tested in accordance with
ASTM D4533/D4533M.
6. Stable within a pH range of 2 to 13.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify the receiving surface is smooth, without ruts or protrusions, and grades are according to design drawings.
B. Verify the geosynthetic is free of defects or flaws that may degrade physical performance.
3.02 PREPARATION
A. Remove vegetation, boulders, and rocks larger than 3/4 inch in size and other sharp objects in accordance with Section 31-10-00.
B. Compact base with smooth drum roller, 500 LB minimum.
3.03 INSTALLATION
A. General:
1. Notify Engineer a minimum of 24 hours prior to installation.
2. Prevent surface drainage from eroding under geosynthetic. Repair undermined areas prior to backfill.
3. Position geosynthetic smooth and wrinkle free on prepared surface; unroll or unfold carefully, avoiding stretching.
4. Secure geosynthetic to prevent movement or damage during installation.
B. Separation:
1. Install geotextile according to manufacturer's recommendations.
2. Lay sheets in the direction of construction.
3. Repairs: Remove damaged portion of geotextile and seam an additional layer to cover the affected area in all directions.
3.04 BACKFILL
A. Backfill in a manner to prevent damage to geosynthetic. Repair geosynthetic damaged during backfill operations.
3.05 FIELD QUALITY CONTROL
A. See Section 01-40-00 - Quality Requirements for additional requirements.
3.06 PROTECTION
A. Do not exceed geosynthetic manufacturer's recommended exposure to UV radiation.
B. Prevent surface water runoff from contaminating geosynthetic.
END OF SECTION
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4632/D4632M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4632/D4632M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4833/D4833M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4833/D4833M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20D4533/D4533M…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .