A21 - (D) Enclosure B - FALLS Tower-Bridge-Gate Dwgs.pdf
PDF 609 KB Posted
- Attached to
- Standby Confined Space Rescue Team Federal contract opportunity
- Solicitation number
- W912PM22Q0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A21 - W912PM22Q0025_Standby CSR_Q and A_Part 2.pdf | ||
| A21 - W912PM22Q0025_Standby CSR_Q and A.pdf | ||
| A21 - (D) Enclosure A - PRCS-Falls Lake.pdf | ||
| A21 - (D) Enclosure C - BEJ Intake Tower Plans.pdf | ||
| A21 - (A) Combined Synopsis 22Q0025.pdf | ||
| A21 - (B) SOW_FALLS_Standby-CSR-Team Revised.pdf | ||
| A21 - (C) Contractor Quote Sheet.pdf | ||
| A21 - (D) Enclosure D - PRCS-BEJ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
k7ecpjhd Rectangle k7ecpjhd Rectangle k7ecpjhd Line k7ecpjhd Text Box Crane position with front outriggers extended k7ecpjhd Text Box Gate Access Holes - Gates/cylinders will be lifted from these locations k7ecpjhd Line k7ecpjhd Line k7ecpjhd Line k7ecpjhd Text Box Stop log install location
Gate Lift Lug Locations k7ecpjhd Line k7ecpjhd Line k7ecpjhd Line k7ecpjhd Text Box Lift Lug and Stop Log Install Elevation k7ecpjhd Line k7ecpjhd Line k7ecpjhd Text Box Deck Elevation k7ecpjhd Line k7ecpjhd Text Box Stoplog Install Slot k7ecpjhd Text Box Cylinder k7ecpjhd Text Box Gate Stem k7ecpjhd Line
Line
Gate Weight: approx. 23,500 lbs
Gate Weight: approx. 23,500 lbs
File details come from the government source that posted it. Updated .