This is a Contract Price Schedule for a National Park Service (NPS) interior painting project at Culebra Island National Wildlife Refuge (CUIS). The solicitation is for the Mainland Visitor Center Interior Paint project (PMIS Number 349571).
The contract requires painting services across three main work areas, each with a quantity of one and unit of measure in "Each": CLIN 1 involves gypsum board wall preparation and application of two coats of acrylic latex paint; CLIN 2 covers wood trim preparation and two coats of acrylic latex paint application; and CLIN 3 addresses millwork preparation and cleaning with two coats of paint applied to doors, ends, and face frames. CLINs 4, 5, and 6 are designated for General Conditions, Overhead, and Profit respectively, with CLINs 7, 8, and 9 remaining unspecified in the document. The base price is the sum of CLINs 1 through 7. An option line item (CLIN 10) is included for color change of millwork in the bookstore. Offerors must submit pricing for all base line items and optional items to have an acceptable proposal. For lump-sum items, only total price is required; for unit-priced items, both unit price and extended total price must be provided. In case of calculation discrepancies, unit prices govern extended prices, and corrected amount totals govern summation errors. All totals and extended prices must be rounded to whole dollars.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 1 Each
2 1 Each
3 1 Each
4 1 Each
5 1 Each
6 1 Each
7 1 Each
8 1 Each
9 1 Each
10 1 Each
Contract Price Schedule National Park Service (NPS)
Solicitation : TBD
Park: CUIS
PMIS Number: 349571
Developed Area:
Project Title: Mainland Visitor Center Interior Paint
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract
Line Item
Number
(CLIN)
Unit of
Measure Contract Line Item (CLI) Title Quantity Unit Price Total Price
Gypsum Board Walls: Prep surfaces. Apply two coats acrylic latex paint
Wood Trim: Prep all wood trim. Apply two coats of acrylic latex paint
General Conditions
Millwork: Prep and clean all millwork surfaces.
Apply two coats doors, ends, and face frames of millwork.
Overhead
Profit
TOTAL PRICE FOR ALL OPTIONS BASE PRICE (Contract Line Item Number 9)-----------
TOTAL BASE PRICE (Contract Line Item Number 1 through 7-----------------------------
Option 1: Color change for millwork in bookstore