A21 - (B) CONTRACTOR QUOTE SHEET WITH PRICING.pdf
PDF 159 KB Posted
- Attached to
- PHILPOTT LAKE – SOLID WASTE COLLECTION SERVICES Federal contract opportunity
- Solicitation number
- W912PM24Q0018
About this file
This document is a solicitation for solid waste collection services at Philpott Lake in Virginia. The U.S. Army Corps of Engineers is seeking these services for facilities including Goosepoint Park, Salthouse Branch Park, Horseshoe Point Park, and the Maintenance Compound. The contractor will provide dumpsters and waste removal on a weekly or biweekly basis from April 2024 through March 2029, with the option to extend an additional year. The solicitation includes pricing sheets to provide unit costs for waste removal and extra pickups over five potential contract years. Quotes are due by February 27, 2024 and the award will be made to the lowest priced technically acceptable offer. A pre-bid site visit will be held on February 13, 2024. The solicitation is set aside for small businesses and the NAICS code is 562111.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A23 - Site Visit Sign In Sheet - W912PM24Q0018 - PHL Dumpsters.pdf | ||
| A21 - W912PM24Q0018 - Amendment 0001.pdf | ||
| A21 - (A) Combined Synopsis-Solicitation - PHILPOTT LAKE - SOLID WASTE COLLECTION - W912PM24Q0018 - AMD 0001 - Conformed.pdf | ||
| A21 - (B) CONTRACTOR QUOTE SHEET WITH PRICING AMD 0001.pdf | ||
| A21 - (A) Combined Synopsis-Solicitation - PHILPOTT LAKE - SOLID WASTE COLECTION - W912PM24Q0018 - Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 8, 11, 12, 14, 15, and 16 as well as pricing on pages 4-9.
1. Solicitation Number: W912PM24Q0018
2. Solicitation Issue Date: 6 February 2024
3. Contract Specialist: Diana Curl
4. Offer Due Date/Local Time: 27 February 2024, 2:00 PM, EDT. Each offeror must submit both a Price Quote and a Technical Proposal via email to BOTH troy.d.small@usace.army.mil and diana.d.curl@usace.army.mil. No hard paper copies will be accepted or evaluated. Both the Price Quote and the Technical Proposal must be received by the closing date and time set for receipt of quotes.
5. Questions: All questions shall be in writing and e-mailed to troy.d.small@usace.army.mil and diana.d.curl@usace.army.mil. Questions concerning this solicitation will be accepted up to the Close of Business (4:00 PM ET) on 19 February 2024. The U. S. Army Corp of Engineers does not commit to providing responses to questions submitted after this date; however attempts to answer questions will be made.
6. Issued By:
U.S. ARMY CORPS OF ENGINEERS
Attn: Troy Small and Diana Curl
69 Darlington Avenue
Wilmington, North Carolina 28403-1343
7. This Acquisition is a small business set-aside under NAICS Code 562111, size standard of $47,000,000.00.
8. Discount Terms:
9. Method of Solicitation: RFQ
10. The Solicitation incorporates by reference FAR 52.212-1, 52.212-4, 52.212-3, and 52.212.5. Addenda are attached.
mailto:troy.d.small@usace.army.mil mailto:diana.d.curl@usace.army.mil mailto:jenifer.m.garland@usace.army.mil mailto:diana.d.curl@usace.army.mil
11. Contractor/Offeror:
COMPANY NAME:
COMPANY POC:
ADDRESS:
PHONE:
CAGE: UNIQUE ENTITY ID:
12. Total Price Base and All Option Years:
13. The Contractor Is Required To Sign This Document And Return 1 Copy The Issuing Office. The Contractor Agrees To Furnish And Deliver All Items Set Fort Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified Herein.
14. Signature of Offeror/Contractor:
15. Name and Title of Signer (Type or Print)
16. Date Signed:
Philpott Lake, Bassett, VA – Base Year : 1 April 2024 – 31 Mar 2025
The Contractor shall furnish municipal solid waste removal services for the Government facilities at the Philpott Lake Project. These services include 3 EA, 8 cubic yard (minimum) containers at Goosepoint Park and Salthouse Branch Park, and 2 EA, 8 cubic yard (minimum) containers at Horseshoe Point Park and the Maintenance Compound.
THIS ITEM IS NOT PRICED.
CLIN# DESCRIPTION QTY UNIT UNIT
COST TOTAL COST
Goosepoint Park and Salthouse Branch Park – FFP
Solid Waste Removal 3 dumpsters at each location , 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
31 Week
Horseshoe Point Park – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. May through September.
In accordance with the Statement of Work.
21 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
31 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, every other week.
November through March.
In accordance with the Statement of Work.
10 Week
Goosepoint Park and Salthouse Branch Park - FFP
Extra Pickup & Admin Charge
(3 dumpsters at each location)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
8 Each
Horseshoe Point Park – FFP.
Extra Pickup & Admin Charge
(2 dumpsters)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of
4 Each
BASE YEAR TOTAL ALL LINE ITEMS =
Philpott Lake, Bassett, VA – Option Year 1: 1 April 2025 – 31 Mar 2026 cubic yard (minimum) containers at Goosepoint Park and Salthouse Branch Park, and 2
Compound
Goosepoint Park and Salthouse Branch Park – FFP
Solid Waste Removal 3 dumpsters at each location, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
31 Week
Horseshoe Point Park – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. May through September.
In accordance with the Statement of Work.
22 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
31 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, every other week.
November through March.
In accordance with the Statement of
11 Week
Branch Park - FFP
Extra Pickup & Admin Charge
(3 dumpsters at each location)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
8 Each
Horseshoe Point Park – FFP.
Extra Pickup & Admin Charge
(2 dumpsters)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
OPTION YEAR 1 TOTAL ALL LINE ITEMS =
Philpott Lake, Bassett, VA – Option Year 2: 1 April 2026 – 31 Mar 2027 cubic yard (minimum) containers at Goosepoint Park and Salthouse Branch Park, and 2
Goosepoint Park and Salthouse Branch Park – FFP
Solid Waste Removal 3 dumpsters at each location, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
30 Week
Horseshoe Point Park – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. May through September.
In accordance with the Statement of Work.
22 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
30 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, every other week.
November through March.
In accordance with the Statement of
Branch Park - FFP
Extra Pickup & Admin Charge
(3 dumpsters at each location)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
8 Each
Horseshoe Point Park – FFP.
Extra Pickup & Admin Charge
(2 dumpsters)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
OPTION YEAR 2 TOTAL ALL LINE ITEMS =
Philpott Lake, Bassett, VA – Option Year 3: 1 April 2027 – 31 Mar 2028 cubic yard (minimum) containers at Goosepoint Park and Salthouse Branch Park, and 2
Goosepoint Park and Salthouse Branch Park – FFP
Solid Waste Removal 3 dumpsters at each location, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
30 Week
Horseshoe Point Park – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. May through September.
In accordance with the Statement of Work.
22 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
30 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, every other week.
November through March.
Goosepoint Park and Salthouse Branch Park - FFP
Extra Pickup & Admin Charge
(3 dumpsters at each location)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
8 Each
Horseshoe Point – FFP
Extra Pickup & Admin Charge
(2 dumpsters)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
OPTION YEAR 3 TOTAL ALL LINE ITEMS =
Philpott Lake, Bassett, VA – Option Year 4: 1 April 2028 – 31 Mar 2029 cubic yard (minimum) containers at Goosepoint Park and Salthouse Branch Park, and 2
Goosepoint Park and Salthouse Branch Park – FFP
Solid Waste Removal 3 dumpsters at each location, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
31 Week
Horseshoe Point Park – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. May through September.
In accordance with the Statement of Work.
22 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, one time per week. April through October.
In accordance with the Statement of Work.
31 Week
Maintenance Compound – FFP
Solid Waste Removal 2 EA, 8 cubic yard (minimum) containers, every other week.
November through March.
In accordance with the Statement of
10 Week
Branch Park - FFP
Extra Pickup & Admin Charge
(3 dumpsters at each location)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
8 Each
Horseshoe Point – FFP.
Extra Pickup & Admin Charge
(2 dumpsters)
This CLIN is not guaranteed and is an estimated quantity. The extra pickups will be used as needed.
In accordance with the Statement of Work.
OPTION YEAR 4 TOTAL ALL LINE ITEMS =
File details come from the government source that posted it. Updated .