A2 - Island Creek Transformer Supply Modified Not For Construction Solicitation 15 May 2025.pdf
PDF 5 MB Posted
- Attached to
- Island Creek Switchyard Transformer
- Solicitation number
- W912PM25RA004
About this file
The document is a comprehensive set of engineering design drawings for the Island Creek Pumping Station Transformer Switchyard project for the US Army Corps of Engineers Wilmington District. The drawings cover multiple technical aspects including transformer devices, control cabinet layouts, transformer foundation details, temporary storage connections, and electrical schematics. Key technical elements include:
Transformer specifications detail 115 kV Class I Power Transformers with extensive requirements for nameplate data, tank and construction details, accessories, bushings, surge arresters, control cabinets, and factory testing protocols. The drawings provide detailed technical diagrams for transformer foundation pads, seismic anchorage, control cabinet configurations, fiber-optic temperature monitoring, and electrical control schematics. A detailed flowchart for transformer shipment, handling, and site assembly is also included, outlining steps from delivery through site commissioning and installation at the Island Creek Pump Station location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT FOR CONSTRUCTION
File details come from the government source that posted it. Updated .