A2 Drawing files - Title.pdf

PDF 548 KB Posted

Attached to
Repair Earth Covered Magazines (ECMs) in Ammunition Holding Area (AHA) No. 25 Camp Casey
Solicitation number
W91QVN-20-R-0115
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO. DESCRIPTION OF DRAWINGS

TITLE SHEET

DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

T-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A - 1

A - 2

ARCHITECTURAL

E - 1

E - 2

ELECTRICAL

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

VARIOUS BUILDINGS

REPAIR EARTH COVERED MAGAZINES, AHA 25

FEWR NO 190901, CAMP CASEY

T - 2

BLDG S-249 AND S-250, CP CASEY

GROUND FLOOR PLAN, PICTURES, GENERAL NOTES & SCOPE OF WORK

DOOR ELEVATION, SECTIONS AND DETAILS

EXIST/NEW ELECTRICAL PLAN FOR S-249 & S-250, LIGHTING FIXTURE DETAILS

A - 1

A - 2

ARCHITECTURAL

DOOR ELEVATION & SECTIONS

DOOR DETAILS

GROUND FLOOR PLAN, PICTURES, GENERAL NOTES & SCOPE OF WORK

A - 3

A - 4

M - 1

M - 2

M - 3

MECHANICAL

GENERAL NOTES AND SCOPE OF WORK

MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS

MECHANICAL EQUIPMENT SCHEDULE

M - 4

E - 1

E - 2

ELECTRICAL

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

E - 3

A - 3 DOOR DETAILS & NOTES

A - 4 MISC DETAILS, DOOR SCHEDULE & ECM DOOR NOTES

(VARIOUS BUILDINGS)

REPAIR EARTH COVERED MAGAZINES, AHA 25

CAMP CASEYKWON, CH

190901

BLDG S-251 AND S-252, CP CASEY

MISC DETAILS, DOOR SCHEDULE & DOOR NOTES.

SPECIFIC NOTES AND ROOF COVER DETAIL

DEHUMIDIFIER AND DUCT FLOOR PLAN (BLDG #251 & S-252), NOTES,

BLDG S-253, S-254 AND S-255, CP CASEY

A - 1

A - 2

ARCHITECTURAL

DOOR ELEVATION & SECTIONS

DOOR DETAILS

GROUND FLOOR PLAN, PICTURES, GENERAL NOTES & SCOPE OF WORK

A - 3

A - 4

M - 1

M - 2

MECHANICAL

GENERAL NOTES AND SCOPE OF WORK

MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS

MISC DETAILS, DOOR SCHEDULE & DOOR NOTES.

M - 3

M - 4

E - 1

E - 2

ELECTRICAL

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

E - 3

MECHANICAL EQUIPMENT SCHEDULE

NOTES, SPECIFIC NOTES AND ROOF COVER DETAIL

DEHUMIDIFIER AND DUCT FLOOR PLAN (BLDG S-253, S-254 & S-255),

S-253, S-254 AND S-255

EXIST/NEW EXTERIOR POWER DISTRIBUTION LINE PLAN FOR BUILDING

PANELBOARD "NP" LOAD SCHEDULE FOR S-253, S-254 & S-255

EXIST/NEW ELECTRICAL PLAN, LIGHTING FIXTURE DETAILS & NEW

S-251 AND S-252

EXIST/NEW EXTERIOR POWER DISTRIBUTION LINE PLAN FOR BUILDING

PANELBOARD "NP" LOAD SCHEDULE FOR S-251 & S-252

EXIST/NEW ELECTRICAL PLAN, LIGHTING FIXTURE DETAILS & NEW

A - 1

A - 2

ARCHITECTURAL

BLDG S-256 AND S-257, CP CASEY

GROUND FLOOR PLAN, PICTURES, GENERAL NOTES & SCOPE OF WORK

A - 3

A - 4

PICTURES AND ECM DOOR NOTES

DOOR SECTION AND ELEVATION

MISC DETAILS AND DOOR SCHEDULE

DOOR DETAILS-1

DOOR DETAILS-2

DOOR DETAILS-3

A - 5

A - 6

A - 7

TITLE SHEET-1

C - 1 LOCATION MAP

TITLE SHEET

C - 2

C - 3

C - 4

C - 5

C - 6

C - 7

SITE LAYOUT PLAN AND SCOPE OF WORK

CHAIN LINK FENCE AND GATE

PCC PAVEMENT DETAIL

VEHICLE GUARD RAIL

GABION MATTRESS

MISC. DETAIL

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

T--2

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A - 1

A - 2

ARCHITECTURAL

E - 1

E - 2

ELECTRICAL

LEGEND, GENERAL NOTES AND SCOPE OF WORK

VARIOUS BUILDINGS

REPAIR EARTH COVERED MAGAZINES, AHA 25

FEWR NO 190901, CAMP CASEY

BLDG S-258 AND S-259, CP CASEY

EXIST/NEW ELECTRICAL PLAN FOR S-258 & S-259, LIGHTING FIXTURE DETAILS

A - 1

A - 2

ARCHITECTURAL

A - 3

M - 1

M - 2

MECHANICAL

GENERAL NOTES AND SCOPE OF WORK

E - 1

E - 2

ELECTRICAL

LEGEND, GENERAL NOTES AND SCOPE OF WORK

A - 3

(VARIOUS BUILDINGS)

REPAIR EARTH COVERED MAGAZINES, AHA 25

CAMP CASEYKWON, CH

190901

BLDG S-262 AND S-263, CP CASEY

M - 1

M - 2

M - 3

MECHANICAL

GENERAL NOTES AND SCOPE OF WORK

MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS

MECHANICAL EQUIPMENT SCHEDULE

M - 4

E - 1

E - 2

ELECTRICAL

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

E - 3

M - 5

NEW POWER PLAN FOR DEHIMIDIFIER (BLDG S-256 & 257)

EXIST/NEW ELECTRICAL PLAN (BLDG S-256 & 257)

(BLDG S-256 & 257)

DEHUMIDIFIER AND DUCT FLOOR PLAN-1, NOTES AND SPECIFIC NOTES

(BLDG S-256 & 257)

DEHUMIDIFIER AND DUCT FLOOR PLAN-2, VENTILATOR SECTION AND NOTES

GENERAL NOTES, GROUND FLOOR PLAN, CROSS SECTION & PICTURES

SCOPE OF WORK & DETAILS

SCHEDULE AND HARDWARE SCHEDULE

INTERIOR FINISH SCHEDULE, MATERIAL & COLOR SCHEDULE, DOOR & WINDOW

EXIST/NEW ELECTRICAL PLAN FOR S-258 & S-259, LIGHTING FIXTURE DETAILS

GENERAL NOTE, GROUND FLOOR PLAN, CROSS SECTION & DETAIL

SCOPE OF WORK, PICTURES & DETAILS

SCHEDULE AND HARDWARE SCHEDULE

INTERIOR FINISH SCHEDULE, MATERIAL & COLOR SCHEDULE, DOOR & WINDOW

(BLDG# S-239 & S-240) AND NOTES

EQUIPMENT SCHEDULE-4, HEAT PUMP UNIT FLOOR PLAN AND CONTROL DIAGRAM

MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND

M - 3

TITLE SHEET-2

File details come from the government source that posted it. Updated .