A16 QASP 42753000 Parts Washer Tanks.pdf
PDF 274 KB Posted
- Attached to
- Lease & Service Parts Washer Tanks
- Solicitation number
- N4523A25Q5701
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a Parts Washer Leasing and Services Contract (PSNS JML Number: 4275-3000). The QASP outlines the procedures and guidelines the government will use to monitor the contractor's performance and ensure the required service levels are achieved. It defines the roles and responsibilities of the Contracting Officer and Contracting Officer's Representative (COR)/Technical Point of Contact (TPOC), and the methodologies for surveillance, including random monitoring, 100% inspection, and customer feedback. The QASP includes a Performance Requirements Summary (PRS) that specifies the performance objectives, standards, and acceptable quality levels for key contract requirements such as providing leased parts washers, servicing parts washers, and coordinating with the COR. The government will use the monitoring forms in the QASP to assess the contractor's performance and determine if corrective action is needed.
The related federal contract opportunity is for the Lease & Service of Parts Washer Tanks, solicitation number N4523A25Q5701, issued by the Department of the Navy Naval Supply Systems Command. This is a combined synopsis solicitation, and offerors must ensure the specified NAICS code is included in their SAM profile.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Parts Washer Leasing and Services Contract PSNS
JML Number: 4275-3000
INTRODUCTION:
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled parts washer leasing and services. This plan sets forth the procedures and guidelines the government will use in ensuring the required performance standards or services levels are achieved by the contractor.
PURPOSE:
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS.
This QASP defines the role and responsibilities of the government representative(s) identified to monitor contractor performance. This QASP shall prescribe the methodologies used to monitor and evaluate the contractor’s performance and the contractor’s performance objectives and thresholds
PERFORMANCE MANAGEMENT:
The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own Quality Control Plan (QCP), whether formal or informally.
QCP is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspection of the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QCP.
The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES:
The Contracting Officer:
The Contracting Officer is responsible for monitoring contract compliance, contract administration, and for resolving any differences between the observations documented by the Contracting Officer's Representative (COR)/Technical Point of Contact (TPOC) and the Contractor. The Contracting Officer will designate in writing the COR as required. The TPOC’s serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance.
The Contracting Officer’s Representative (COR) – and – Technical Point of Contact (TPOCS):
The COR/TPOC’s monitors all technical aspects of the contract and assists in contract administration. The COR/TPOC is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;
coordinate availability of government furnished property, and provide site entry of Contractor personnel.
The COR/TPOC is NOT authorized to change any of the terms and conditions of this contract.
Only the warranted Contracting Officer is authorized to make modifications/changes to the terms and conditions of this contract. If the COR/TPOC believes any Government personnel has effectively issued a change resulting in a change in effort and price/cost of the contract, the COR/TPOC shall immediately notify the Contracting Officer in writing.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the COR/TPOC(s) to evaluate contractor performance when appropriate. The primary methods of surveillance are:
-Random monitoring, which shall be performed by the COR/TOM.
-100% Inspection – Each month, the COR/TPOC, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist (Attachment 2 contained herein).
The COR if assigned shall include the results in their COR Reports. TPOC’s shall provide report to the COR and Contracting Officer.
-Customer Feedback: The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints. Customer complaints, to be considered valid, must be detailed enough in nature to allow the COR/TPOC to investigate and notify the Contracting Officer of the validity/resolution. Customer feedback may also be obtained from the results of formal customer satisfaction surveys.
-Acceptable Quality Levels: The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving servicing leased and Government owned parts washers, the desired performance level is established at 100 percent.
Other levels of performance are keyed to the relative importance of the task to the overall mission performance at Puget Sound Naval Shipyard.
QUALITY ASSURANCE DOCUMENTATION:
Performance Management Feedback Performance management feedback occurs begins with communication. The COR/TPOC shall complete monitoring requirements within the Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1 Performance Requirements Summary (PRS). The COR/TPOC shall communicate with the Contracting Officer any issues, successes or failures of the Contractor to accomplish PWS or PRS requirements.
Monitoring Forms The government’s Quality Assurance (QA) and surveillance, accomplished by the COR/TPOC, will be reported to the Contracting Officer using the monitoring forms in Attachments 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required performance outcomes are being achieved.
The COR/TPOC will retain a copy of all completed QA surveillance forms.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance Government shall use the monitoring methods cited to determine whether the required performance outcomes have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan (by the Contracting Officer ONLY) to show how and by what date it intends to bring performance up to the required levels. Failure to meet the required performance outcomes may result in an unsatisfactory Past Performance Rating.
Reporting At the end of each month, the COR/TPOC will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted reports and the completed quality assurance monitoring forms (Attachment 2), will become part of the COR file. It will enable the government to demonstrate whether the contractor is meeting the required performance outcomes.
Reviews and Resolution The Contracting Officer may require the contractor to meet with the Government team as deemed necessary to discuss performance evaluation. The Contracting Officer will define a frequency of in-depth reviews with the contractor if the need arises, or per the contractor’s request.
The Contracting Officer and COR/TPCO will coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
ATTACHMENT 1: Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The Contractor shall provide the lease of various types of Fire Marshall approved/UL listed parts washing equipment, identified in the Table 1 IAW PWS Section 4.2.
The contractor shall not use recycled solvent. All leased parts washers shall meet the minimum characteristics described in Table 1 and Table 2. Contractor shall maintain leased parts washers including all maintenance.
No more than one customer complaint per month, and no more than 6 complaints total per year.
Inspection of services, and random sampling completed by COR.
PRS # 2
Service all parts washers (leased or government owned) IAW PWS Section 4.3.
The contractor shall not use recycled solvent. The contractor shall service the parts washers IAW the schedule. Contractor shall provide proper notification of services to COR.
No more than 6 total missed individual parts washer services per year. No missed notification of services to the
COR.
Inspection of services, and random sampling completed by COR.
PRS # 3
Coordinate with COR for scheduling, providing all required documentation IAW PWS Section 4.4.
All required documents and notifications shall be submitted as required.
Zero deviation from standard. 100% inspection by
COR.